You are on page 1of 1

SUB SURFACE PUMP DESIGN

SUMUR TAP-099

I. INPUT DATA

DATE 28-Oct-20 PUMP DEPTH 2477 ft


WELL TAP-099 PLUNGER DIAMETER 2,25 in
LAYER I-Y LENGTH OF STROKE 64 in
INTERVAL 676 - 803 m PUMPING SPEED 7 spm
SG OIL 0,8908 LENGTH 5/8" ROD 0 ft
SG WATER 1,019 LENGTH 3/4" ROD 1350 ft
WC (FRACTION) 90% (Asumsi data WC) LENGTH 7/8" ROD 1127 ft
TUBING ANCHORED 1 LENGTH 1" ROD 0 ft
(YES = 1,NO = 0) 0 TUBING DIAMETER 2 7/8 inch
SERVICE FACTOR 0,91 CASING DIAMETER 7 inch
STATIC FLUID LEVEL 0,00 m Fluid Gradient 0,4357 psi/ft
DYNAMIC FLUID LEVEL 0,00 m PI 0,746 bpd/psi
Target Gross = 208 bbl/d TOC m
Net = 21 bopd SUMBAT/BP -m

II. DESIGN RESULTS


STRESS 5/8" ROD 0,00 psi PLUNGER STROKE 55,92 in
STRESS 3/4" ROD 14.277,21 psi PUMP DISPLACEMENT 231,05 bbl/d
STRESS 7/8" ROD 14.311,88 psi 36,73 m3/h
STRESS 1 " ROD 0,00 psi Eff. Fluid Level 216,68 m
COUNTERBALANCE EFF. #DIV/0! lbs
PPRL 8.601,44 lbs PEAK TORQUE #DIV/0! in-lbs
MPRL 3.424,71 lbs PRIME MOVER HP 7,70 hp
LOAD RATIO 60,18 % POLISHED ROD HP 5,57 hp

III. EVALUASI

P.U MODEL / RATING C-160-173-86


K.I m 755,00 m
PEAK TORQUE POMPA in-lbs #DIV/0! in-lbs
PUMPING SPEED spm 7 spm
STROKE LENGTH in 64 in
PUMP DISPLACEMENT bbl/d 231,05 bbl/d
SYNCRONIZE 13,67
- Stress Rod Over (38,8) % dibanding Stress Rod Maksimum

IV. PROGRAM KERJA

1 KILLING SUMUR, PASTIKAN TIDAK ADA ALIRAN (SITP/SICP = 0 PSI)


2 CABUT RANGKAIAN TUBING DAN PU, CEK KONDISI TUBING DAN PU
3 MASUK RANGKAIAN COLLAR GERIGI TOC @ 788 m ( LAST PES SCRAPPER DUDUK DI 677 M, DARI HASIL IB INDIKASI CASING SOBEK), SIRKULASI BERSIHKAN SUMUR
4 MASUK RPP (MA + GA + TUBING), SET KI DI 755 M
5 MASUK RBI (2,25" PLUNGER + 54 jts 3/4" SR + 45 jts 7/8" SR )
6 SPASING SUMUR +/- 35 CM SAMPAI BAIK. LAKUKAN BUILD UP SUMUR 100 psi, TAHAN 10 MENIT. CEK KEBOCORAN.
7 STEL PU, SET STROKE LENGTH = 64 SPM = 7
8 LAKUKAN SONOLOG DAN DYNAGRAPH 1 HARI SETELAH PRODUKSI (NAIKKAN SPM SECARA BERTAHAP TERGANTUNG PARAMETER TERSEBUT)
9 UTAMAKAN KESELAMATAN KERJA DAN HINDARI PENCEMARAN LINGKUNGAN.

28 Oktober 2020
Design Oleh, Disetujui Oleh,
Petroleum Engineer Petroleum Engineering Asst Man

Aditya Wigaswara H Guntur Mulyanagara

Distribusi :
- Asset 2 Planning & Evaluation Manager
- Field Manager Pendopo
- WO&WS Assistant Manager Field Pendopo
- Arsip

You might also like