You are on page 1of 2

LASL CENIKAL RALNAY

SAERIY CERWICALE
When the Commissioner ot Railway Safety does not inspect the work prio lo openm
thiscertificate must be signed beforeopening temporary or new vorks
No, SG/TRG /Safety Certificate Dated 0tio2024
From DANAPUR DIVISION
The Sr. Divl. Signal & Telecom
Engineer.East Central Railway
Danapur
To
The Commissioner of Railway safety,
(EASTERN CIRCLE), NEW K.G. BUILDING |2h FLOOR,
14, STRAND ROAD, KOLKATA - I.

Deseription of works: Tarighat Station Proposed modification in Electronic


Interlocking at Tarighat station of Danapur Division in E. C. Railway in connection
with new BG Line between MAU-GAZIPUR-TARIGHAT Sations.
Reference: Chief Engineer,
Divisional Rly. Manager, E.C RIy, Danapur
Regional Engineer,
Divisional Engineer,
ChiefSig. &Telecom Engineer.

CRS (Easterm Circle) Application No. SGICRSTRGADNR,DW-08.12.2023, CRS (Eastern Circle)


Observation No. CRS/ECR/DNR/TRG/E-Mod/23/1137 and Compliance No, SGICRS/TRG/DNR,
Dtd-21/22.02.2024

AUTHORISATION under commissioner of Railway Safety No.CRS/ECR/DNR/TRG/E


Mod/23/1352 Dt. 27.02.2024 to commence and open the above.
Following Permanent / Temporary work has been done:

Tarighat Station :- Proposed modification in Electronic Interlocking at Tarighat


station of Danapur Division in E. C. Railway in connection with new BG Line
between MAU-GAZIPUR-TARIGHAT Stations.

Ido hereby certify that, in the work above mentioned


i) The schedule of dimensions has not been infringed except in regard to the
itemssanctioned under...Nil. letter No. ....Nil..
dated ..Nil
ii) Engineering work has been carried out in accordance with plan No. C.E's Drg
no
Y- 102-2023(ALT-1). except in regard to the alterations sanctioned under
letterNo. .Nil .dated....Nil
iii) The Signaling / Interlocking / Block Signalling has been carried out in
accordance with signaling Plan No. ECR/SIP/DNR/TRG/531/2023(ALT-A)
and the requirements lay down in the manuals of instruction for the
installation and Maintenance of Signalling. Interlocking and Block Signalling
apparatus have been fully complied with except in regard to items sanctioned
under letter No. Nil. dated .. Nil.
2

iv) The work has been carried out in accordance with the documents
already
supplied.
2 A certificate from the Divisional Operating Manager stating th¡t the necessary
working rules have been issued and giving reference in regard to Sanctioio
deviation (if any) from general and Subsidiary Rules is attached/ not requireu.
3 Ihereby certify that on the .2024. I have carefully inspected and
"tested" the above work and that, I have satisfied myself that it has been propeiy
completed and is in good working "order and that the work can be opened tor
public carriage of passengers without endangering the safety of the traveling public
,or of the employeesof the railway. *subject the following speed restrictions -
@Temporary 15 Km. P.H. due to NI. a.

permanent XX..Km. P.H. due to

JEEBESH Digitally signed


by JEEBESH
Countersigned by
THAKUR THAKUR

(Jeevesh Thakur) (Arun Kumar Gupta)


DGM/CIVIL/RVNL/BSB DGM/S&T/RVNL/BSB

Dated Dated.

Countersigned by

(KumarShanu Raj) (Ashok Kumar)


ADEN/BXR ASTE/BXR
Dated Oh-9,
Dated. .s<334
Countersigned by

(Santosh Kumar) (R. K. Singh)


Sr.DEN/III/DNR Sr. DSTE/DNR

Dated Dated

Copy forwarded to : PCOM, CSO, PCSTE, PCME, PCEE, PCE- HJP


DRM, Sr. DOM, Sr.DEN (C),Sr.DEN/III, Sr.DEE(G), Sr.DEE(TRD), Sr.DEE(OP),
Sr.DSO.-DNR for kind information.

Sr..DSTE/DNR

You might also like