1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Original structure diagram Drawing page
01
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
10270
300 4330
950
950
Door opening height 2100mm
1200 X 197
950
5200
100
3680
4250
800
700
4097
1800
2400
1700
950
50 50 50
1800 4150
200
50
New wall
Demolition of wall
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
02
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Wall demolition diagram Drawing page
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
10270
300 4330
950
950
197
950
Light yellow texture lacquer
Red + light yellow texture lacquer
(PANTONE 11-0507TPX) (PANTONE 18-1763TPX)+(PANTONE 11-0507TPX)
5200
4250
4097
1800
Red + white matte aluminum
composite panel
White matte aluminum-plastic board
or bamboo wood fiber board
950
200
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing Wall material drawing Drawing page
03
communicate with the supervisor/designer in time before construction.
5200
4250 950
Overseas equipment list table
500*260*660
A2 600*705*1950 220V-380W
Right open vertical refrigerator
844
760*860*1950
A3
C16
600*705*1950 220V-380W
Left open vertical refrigerator
C17
300*390
A5 1200*660*1200 220V-300W
A6 900*660*1200 220V-280W
Refrigerated display cabinet
Class A
B12
A7 1500*700*800 220V-350W Cold chain
1000 B1 2400*700*800 /
5640
2400 Front field operation desk (left)
600*705*1950
C12 C12
2400 Front field operation desk (right)
D7
Stairs down the warehouse
C10
950 B3 600 pool 600*700*800 /
B4 600 ice bath 600*700*800 /
C6
Class B /
B5 1000*700*800 Cold chain
1000 operating table + shelf
C6
/
B6 500*700*800
500MMOperating table + shelf
800
C8
1500
1500*700*800
2.The construction unit shall implement the design in strict accordance with the relevant national
B7 1500 pool operating table
/
1.The construction party shall verify the site size before construction, and the construction can be
C8
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
B8 500 operator console 500*700*800 /
/
C8
B9 1000 operating table 1000*700*800
B10 700*700 operating table 700*700*800 /
10120
10270
C8
A7 C1 Cash register 380*180*276 220V-65W
C2 Straw Box 400*300*150 /
C3 Straw Box 400*300*150 /
280
300
290*230*370
Design Department
/
3415
4200
Floor plan
Drawing page
04
10270
300 4330
950
197
950
5200
4250
4097
1800
1800 curtain fan
950
200
50
Legend Explain
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Lamp connection diagram Drawing page
06
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
The leisure area camera is
mounted on the top surface
10270
300 4330
950
950
H=1000
H=1000
Stairs down the warehouse
S 197
900MM-hook cabinet 900MM-Shelf cabinet
H=2150
950
AP
H=400
H=400
5200
D7
H=1200
C17
H=1200
H=1850
4097
1800
C16
H=1000
B7 1500
D3 D3
D3
H=2150
C9
Backyard batching area
D3
950
760*860*1950 600*705*1950 630*750*1500
A7
B12
320
A1
C12 C12 290*230*370
C10 C6 C6 C8 C8 C8 C8 C8 C7 C7
200
H=1200
H=1450
S
H=1450
H=600
H=1450
H=1450
H=1450
5640 280 4200
10120
Legend Explain
Ceiling spherical camera
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing
Strong and weak electricity
arrangement diagram
Drawing page 07
communicate with the supervisor/designer in time before construction.
10270
300 4330
950
950
Stairs down the warehouse
197
900MM-hook cabinet 900MM-Shelf cabinet
950
C
A
B
5200
800 3415
500*260*660
4250
C17 D7
4097
1800
C16
11
250*390 250*390
300*390
31
B7 1500
D3 D3
D3
C9
844
1000
1000
1206
1500
D3
950
630*750*1500
1300
760*860*1950 600*705*1950 A7
B12
320
A1
C12 C12
200
290*230*370
C10 C6 C6 C8 C8 C8 C8 C8 C7 C7
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Elevation index drawing Drawing page
08
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
Light yellow texture lacquer Product disc light box (see detailed picture)
(PANTONE 11-0507TPX)
550
1100
400 550
1100
1100
400
3000
3000
3000
300
1750
1200
820
80 80
8920
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing A elevation Drawing page
09
communicate with the supervisor/designer in time before construction.
90
白色哑光铝塑板 暗藏T5灯管3000K 白色哑光铝塑板
White matte aluminum composite panel White matte aluminum composite panel 车贴 奥松板基层
Concealed T5 lamp 3000K Car stickers Oson board base
产品卡布灯箱 红色哑光铝塑板 定制红色Slogan发光造型 02
Product Kabu light box Red matte aluminum composite panel Custom red Slogan glow shape 02
400
500
900
R30 2350 2150
180
银色PVC板边框
900
150 Silver PVC board border
30
1700
暗藏LED灯带3000K
Hidden LED with 3000K
1750
2920
3000
3000
2100
350 350
浅黄色质感漆
R200 Light yellow texture lacquer
(PANTONE 11-0507TPX)
900
750
80 黑色拉丝不锈钢踢脚线
Black brushed stainless
steel skirting line
1300 5030 3790
10120
银色PVC板边框
Silver PVC board border
浅黄色质感漆 暗藏LED灯带3000K
Light yellow texture lacquer(PANTONE 11-0507TPX) Hidden LED with 3000K
暗藏LED灯带3000K
Hidden LED with 3000K
车贴
Car stickers 车贴
Car stickers
奥松板基层
Oson board base
奥松板基层
黑色拉丝不锈钢踢脚线 Oson board base
Black brushed stainless steel skirting line
侧立面图 造型侧立面图
Side elevation Modeling side elevation view
图片仅供参考 以施工图为准
Pictures are for reference only and construction drawings prevail
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
设计部门
Design Department
海外品牌部 图纸名称
Overseas Brand Department Name of drawing
B立面图
B elevation
图纸页码
Drawing page
10
communicate with the supervisor/designer in time before construction.
LOGO ( )
Snow King Head LOGO Acrylic
(see detailed image)
1100
2920
3000
1200
80
Black stainless steel skirting
Actual dimensions
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing C elevation Drawing page
11
communicate with the supervisor/designer in time before construction.
50
Bar line hole 50
50
3430 Bar line hole 50
Note: 1.The franchise phone number in the cashier bezel is made according to the
600
11
250*390 250*390
31
franchise phone number of each country, and cannot be made according to the
phone number in the drawing.
3181
R50
63
& TEA
C9
4
1500
1251
White aluminum bezel
Bar counter plan R50
120
200 700 200
Front view
30
120
LED profile wire type lamp 4000K B 3
0
20
20
Wooden bar counter board Wooden bar counter board
0
White matte aluminum plastic plate LED profile wire type lamp 3000K B 700
540 White matte aluminum plastic plate B-B30
A Bar counter poster
Black stainless steel skirting line
80 B 30 Top view
740
600
600
850
150 1200 150
100 60
600 600 Wooden bar counter board
80
30 30
30
30
1500 1131 3350 Wooden bar counter board
55
80
LED profile wire type lamp 4000K
1500 1131 3430
A B 20 20 25
White matte aluminum plastic plate White matte aluminum plastic plate
682
682
Bar counter poster
740
600
850
850
850
850
LED profile wire type lamp 3000K
LED profile wire type lamp 3000K
White matte aluminum plastic plate
18 18
80 60
120
120
70 70
80
White double-sided paint-free board(Cabinet inside the bar) 10 Black stainless steel skirting board 10 Black stainless steel skirting board
455 90 455 90
220
Bar cross-section
330
344
346
180
700
850
370
426
320
316
300
300
320 420 420 540 560 760 634 348 380 450
18 18 18 18 18 18 18 18 18 18
18
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
12
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Bar construction Drawing page
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction. drawings
Access door 400*400
800
X
X
350 1000 1000 1000 1000 1000
160
3M illuminated light box
4136 160
1052 2901
690
1500
1300
169
(thickness 60mm) 20
500
Side Moves
Glass stickers
1000
illustrate:
1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
13
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Construction drawing of
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing Drawing page
door head
communicate with the supervisor/designer in time before construction.
Name of drawing Schematic diagram of the frontcourt modeling wall
Slogan ( )
Custom red Slogan glow shape (see detailed image)
180
150
150
X
2250
2020
2100
Slogan
Custom red Slogan glow shape
2020
Front elevation 125
50
Concealed T5 lamp 3000K
TV set with small banners
75
White latex paint 25
Red matte aluminum composite panel
Red matte aluminum composite panel
50
80
510
1050
D3 D3 D3 D3 Side elevation
540
200
1600 1600
3000
3000
1100
2490
1950
1750
Concentrate:
1.Please construct according to the size in the drawing, in case of special
850
1.The construction party shall verify the site size before construction, and the construction can be carried out
only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national construction
acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard drawings. If Design Department Overseas Brand Department Drawing page
E-23
there is a big difference between the drawings and the site, the construction party shall communicate with the
supervisor/designer in time before construction.