DESIGN DOCUMENT OF DECORATION CONSTRUCTION DRAWING

Store Information Sheet

Vietnam Laos Indonesia Philippines Malaysia


Country
Singapore Japan Korea
MIXUEBINGCHENG CO., LTD.
Type of stores First Floor Second floor Shopping mall stores Special Stores

Website www.mxbc.com
Product Type Room temperature products Cold chain products
Hotline:400-060-8888
Designers Drawing date
2023/04/13
10270
1200 4440 300 4330

950

197

950
5200
4250

4097
1800
H:3070MM

950
200

5640 280 4200


10120

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Original structure diagram Drawing page
01
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
10270
300 4330

950

950
Door opening height 2100mm

1200 X 197

Seal the wall under the stairs

950
5200

100
3680
4250

800
700

4097
1800
2400

Door opening height 2100mm

1700

950
50 50 50
1800 4150
200
50

5640 280 4200


10120

New wall

Demolition of wall

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.

02
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Wall demolition diagram Drawing page
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
10270
300 4330

950

950
197

950
Light yellow texture lacquer
Red + light yellow texture lacquer
(PANTONE 11-0507TPX) (PANTONE 18-1763TPX)+(PANTONE 11-0507TPX)
5200
4250

4097
1800
Red + white matte aluminum
composite panel
White matte aluminum-plastic board
or bamboo wood fiber board

950
200

5640 280 4200


10120

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing Wall material drawing Drawing page
03
communicate with the supervisor/designer in time before construction.
5200
4250 950
Overseas equipment list table

Number Name Specifications Power Remarks


A1 Ice Cream Machine 630*750*1500 380V-4600W

500*260*660
A2 600*705*1950 220V-380W
Right open vertical refrigerator
844

760*860*1950
A3

C16
600*705*1950 220V-380W
Left open vertical refrigerator

carried out only after it is correct.


A4 Ice machine 760*860*1950 220V-2000W

C17

300*390
A5 1200*660*1200 220V-300W

construction acceptance specifications.


Refrigerated display cabinet

A6 900*660*1200 220V-280W
Refrigerated display cabinet
Class A

B12
A7 1500*700*800 220V-350W Cold chain

Backyard batching area


Left unit1500 horizontal refrigerator
1206 1004
A8 1500*700*800 220V-350W Cold chain
Right unit1500 horizontal refrigerator

1500MM stainless steel shelves (2layers)


B7 1500
A9 1220*850*1960 220V-900W
Vertical freezer with four doors Cold chain
A10 2-door vertical freezer 630*852*1960 220V-700W

1000 B1 2400*700*800 /

5640
2400 Front field operation desk (left)

600*705*1950

communicate with the supervisor/designer in time before construction.


B2 2400*700*800 /

C12 C12
2400 Front field operation desk (right)

D7
Stairs down the warehouse

C10
950 B3 600 pool 600*700*800 /
B4 600 ice bath 600*700*800 /

C6
Class B /
B5 1000*700*800 Cold chain
1000 operating table + shelf

C6
/
B6 500*700*800
500MMOperating table + shelf
800

C8
1500
1500*700*800

2.The construction unit shall implement the design in strict accordance with the relevant national
B7 1500 pool operating table
/

1.The construction party shall verify the site size before construction, and the construction can be
C8

3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
B8 500 operator console 500*700*800 /
/

C8
B9 1000 operating table 1000*700*800
B10 700*700 operating table 700*700*800 /

1500MM stainless steel shelves 2 layers)


C8
B11 1200*500 shelves 1200*500*1500 /

10120
10270

B12 1500*500 shelves 1500*500*1500 /


D3

C8
A7 C1 Cash register 380*180*276 220V-65W
C2 Straw Box 400*300*150 /
C3 Straw Box 400*300*150 /

280
300

C4 TeaDisplay stand 440*400*460 /


C5 Sealing Machine 250*390*550 220V-120W
1000 C6 Fructose machine 250*360*410 220V-100W
D3

290*230*370

C7 Smoothie Machine 220V-1500W

Design Department
/
3415

C8 Insulation bucket 240*240*410 /


250*390

C9 Small ticket machine 137*179*125 24V-1.5A


C7

1217 C10 Labeling Machine 110*220*160 12V-4A


250*390

Class C C11 Sweeper 85*86.5*135 5V-50mA


C7
Front dining area

C12 Cup holder 100*340*420 /


D3

C13 Small water heater 540*190*570 220V-3000W


C14 Large water heater 500*260*660 380V-6000W
A1

C15 Water purifier 865*200*695 /


C16 Pearl pot 290*380*350 220V-1350W
52
0
630*750*1500

C17 Induction cooker 300*390*78 220V-3000W


D3

C18 Milk cap machine 465*500*340 220V-1000W


320

4200

C19 Electronic scales 335*340*110


4330

C9 C20 Lemon Slicer 290*390*340


C21 Steam engine 290*230*370 220V-1650W
11
31
D1 Air conditioning wall unit 825*196*293 220V-4600W
D2 Air conditioning cabinet unit 449*482*1796 220V-9660W
1500
D3 43 inch TV 965*540*74.2 220V-70W
900MM-hook cabinet

D4 40 inch TV 890*500*86 220V-65W


D5 Fly killing lamp 380*170*196
D6 Trash can /
/
1300

Class D D7 70L trash can 515*560*740


D8 Single door locker 380*420*1800
900MM-Shelf cabinet

D9 9-door locker 900*420*1800


Overseas Brand Department Name of drawing

D10 Vertical disinfection cabinet 420*365*1025 220V-500W


D11 Cleaning cabinet 400*400*1850
D12 Mop pool 460*390*510
950 1800 950 D13 Damp proof pad 800*600*120
4097 D14 Emergency lamp
200
197

Price List Kabu Light Box(600*1200)

Floor plan
Drawing page
04
10270
300 4330

950
197

950
5200
4250

4097
1800
1800 curtain fan

950
200
50

5640 280 4200


10120

Legend Explain

Reserved power cord on Wall

Single Gang single control switch

Duplex single control switch

Triple single control switch

Single Gang double control switch

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Lamp connection diagram Drawing page
06
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
The leisure area camera is
mounted on the top surface
10270
300 4330

950

950

H=1000

H=1000
Stairs down the warehouse

S 197
900MM-hook cabinet 900MM-Shelf cabinet

H=2150

950
AP
H=400

H=400
5200

The dining area dining camera is


mounted on the top surface
H=1850
500*260*660 16A
4250

D7
H=1200
C17

H=1200

H=1850

4097
1800
C16
H=1000

300*390 250*390 250*390

B7 1500
D3 D3

D3
H=2150

C9
Backyard batching area

D3

950
760*860*1950 600*705*1950 630*750*1500
A7
B12
320
A1
C12 C12 290*230*370
C10 C6 C6 C8 C8 C8 C8 C8 C7 C7
200
H=1200

H=1450
S
H=1450

H=600

H=1450
H=1450
H=1450
5640 280 4200
10120

The leisure area camera is


The top surface of the camera mounting Front court food camera mounted mounted on the top surface
in the operating area on the top surface

The checkout area camera is


mounted on the top surface

Legend Explain
Ceiling spherical camera

AP Wireless AP ceiling router

Five hole socket Three phase air switch

16A 16A socket Two phase air switch

Five hole waterproof socket Bluetooth ceiling audio

16A 16A waterproof socket S Column sound

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing
Strong and weak electricity
arrangement diagram
Drawing page 07
communicate with the supervisor/designer in time before construction.
10270
300 4330

950

950
Stairs down the warehouse

197
900MM-hook cabinet 900MM-Shelf cabinet

950
C

A
B
5200

800 3415
500*260*660
4250

C17 D7

4097
1800
C16

11
250*390 250*390
300*390

31
B7 1500
D3 D3
D3

C9
844

1000

1000
1206

Backyard batching area


Front dining area

1500
D3

950
630*750*1500
1300
760*860*1950 600*705*1950 A7
B12
320
A1
C12 C12

200
290*230*370
C10 C6 C6 C8 C8 C8 C8 C8 C7 C7

5640 280 4200


10120

Price List Kabu Light Box(600*1200)


1500MM stainless steel shelves (2layers) 1500MM stainless steel shelves 2 layers)

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Elevation index drawing Drawing page
08
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction.
Light yellow texture lacquer Product disc light box (see detailed picture)
(PANTONE 11-0507TPX)

Red textured paint Black brushed stainless steel skirting line


Concealed profile light 3000K PANTONE 18-1763TPX Perimeter display stand
Long product decoration painting
(see detail)

700 700 700 700

550
1100
400 550

1100

1100
400
3000

3000
3000

300

1750
1200

820
80 80

8920

Concealed profile light 3000K

Light yellow texture lacquer


(PANTONE 11-0507TPX)

35 Long product decoration painting


Long product decoration painting

Light yellow texture lacquer


(PANTONE 11-0507TPX)
15

Black brushed stainless steel skirting line


Pictures are for reference only and construction drawings prevail 50

Side elevation Modeling side elevation view

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing A elevation Drawing page
09
communicate with the supervisor/designer in time before construction.
90
白色哑光铝塑板 暗藏T5灯管3000K 白色哑光铝塑板
White matte aluminum composite panel White matte aluminum composite panel 车贴 奥松板基层
Concealed T5 lamp 3000K Car stickers Oson board base
产品卡布灯箱 红色哑光铝塑板 定制红色Slogan发光造型 02
Product Kabu light box Red matte aluminum composite panel Custom red Slogan glow shape 02

400

500
900
R30 2350 2150
180
银色PVC板边框
900
150 Silver PVC board border
30
1700

暗藏LED灯带3000K
Hidden LED with 3000K

1750

2920
3000

3000
2100
350 350
浅黄色质感漆
R200 Light yellow texture lacquer
(PANTONE 11-0507TPX)
900

750
80 黑色拉丝不锈钢踢脚线
Black brushed stainless
steel skirting line
1300 5030 3790
10120

银色PVC板边框
Silver PVC board border

浅黄色质感漆 暗藏LED灯带3000K
Light yellow texture lacquer(PANTONE 11-0507TPX) Hidden LED with 3000K

暗藏LED灯带3000K
Hidden LED with 3000K

车贴
Car stickers 车贴
Car stickers

奥松板基层
Oson board base

奥松板基层
黑色拉丝不锈钢踢脚线 Oson board base
Black brushed stainless steel skirting line

侧立面图 造型侧立面图
Side elevation Modeling side elevation view
图片仅供参考 以施工图为准
Pictures are for reference only and construction drawings prevail

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
设计部门
Design Department
海外品牌部 图纸名称
Overseas Brand Department Name of drawing
B立面图
B elevation
图纸页码
Drawing page
10
communicate with the supervisor/designer in time before construction.
LOGO ( )
Snow King Head LOGO Acrylic
(see detailed image)

1100

250 Red textured paint


PANTONE 18-1763TPX

2920
3000

1200
80
Black stainless steel skirting

Actual dimensions

Pictures are for reference only and construction drawings prevail

Refer to the effect picture

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing C elevation Drawing page
11
communicate with the supervisor/designer in time before construction.
50
Bar line hole 50
50
3430 Bar line hole 50

Note: 1.The franchise phone number in the cashier bezel is made according to the

600

11
250*390 250*390

31
franchise phone number of each country, and cannot be made according to the
phone number in the drawing.
3181
R50

63
& TEA

C9
4

1500
1251
White aluminum bezel
Bar counter plan R50
120
200 700 200

Front view
30

120
LED profile wire type lamp 4000K B 3

0
20

20
Wooden bar counter board Wooden bar counter board

0
White matte aluminum plastic plate LED profile wire type lamp 3000K B 700
540 White matte aluminum plastic plate B-B30
A Bar counter poster
Black stainless steel skirting line
80 B 30 Top view

540 Cash register baffle diagram


400 2600
25

740
600

600

850
150 1200 150
100 60
600 600 Wooden bar counter board

80
30 30

30

30
1500 1131 3350 Wooden bar counter board
55

80
LED profile wire type lamp 4000K
1500 1131 3430
A B 20 20 25
White matte aluminum plastic plate White matte aluminum plastic plate

Elevation of bar counter

682

682
Bar counter poster

740

600
850

850

850

850
LED profile wire type lamp 3000K
LED profile wire type lamp 3000K
White matte aluminum plastic plate
18 18

80 60
120

120
70 70

80
White double-sided paint-free board(Cabinet inside the bar) 10 Black stainless steel skirting board 10 Black stainless steel skirting board
455 90 455 90

3181 634 1251 30 A-A B-B


146

220

Bar cross-section
330
344
346

180
700
850

370
426
320

316
300

300

trash can 380


120

320 420 420 540 560 760 634 348 380 450
18 18 18 18 18 18 18 18 18 18
18

Bar counter structure chart

Bar poster specifications


Poster height 620MM, according to the size of the bar, choose the right bar poster Wooden bar counter board White double-sided paint-free board

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.

12
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Design Department Overseas Brand Department Name of drawing Bar construction Drawing page
drawings. If there is a big difference between the drawings and the site, the construction party shall
communicate with the supervisor/designer in time before construction. drawings
Access door 400*400

Downlight 15W 4000K

800
X
X
350 1000 1000 1000 1000 1000

160
3M illuminated light box

The bottom of the doorway lighting layout

Silver aluminum-plastic panel

4136 160
1052 2901

English specification: borderless luminous characters, side


black metal surround (thickness 60mm)

690
1500

1300

3M light box 3M light box


Snow King Logo: black stainless steel
hemming + acrylic UV printing

169
(thickness 60mm) 20

Silver aluminum-plastic panel


160 X
500

500

4600 Column sound


500mm * 4600mm large
second door head
Downlight 15W 4000K
4500

Side Moves

Transparent acrylic board for


100

lifted Snow King


400mm * 4000mm large second door head
Silver aluminum-plastic panel
100

R150 Stairway aisle


2600

Combinations of 5 round outdoo


r light boxes
100

Red door handles


100

Glass stickers
1000

Red door frame


400

Silver aluminum-plastic panel

400 950 1800 950 350 950

5550 150 Door side elevation

illustrate:

1.The construction party shall verify the site size before construction, and the construction can be
carried out only after it is correct.

13
2.The construction unit shall implement the design in strict accordance with the relevant national
construction acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard Construction drawing of
drawings. If there is a big difference between the drawings and the site, the construction party shall
Design Department Overseas Brand Department Name of drawing Drawing page
door head
communicate with the supervisor/designer in time before construction.
Name of drawing Schematic diagram of the frontcourt modeling wall
Slogan ( )
Custom red Slogan glow shape (see detailed image)

White matte aluminum composite panel


X X
X

180
150
150

Concealed T5 lamp 3000K

Red matte aluminum composite panel


White matte aluminum composite panel

X
2250
2020
2100

Slogan
Custom red Slogan glow shape

150 White matte aluminum composite panel


80

Black stainless steel skirting


X
Slogan
Custom red Slogan glow shape

2020
Front elevation 125

50
Concealed T5 lamp 3000K
TV set with small banners
75
White latex paint 25
Red matte aluminum composite panel
Red matte aluminum composite panel
50

80

510
1050

D3 D3 D3 D3 Side elevation

540
200

1600 1600
3000

3000
1100
2490
1950

1750

Concentrate:
1.Please construct according to the size in the drawing, in case of special
850

circumstances, it can be adjusted appropriately


2.The number of TVs is subject to the floor plan

1.The construction party shall verify the site size before construction, and the construction can be carried out
only after it is correct.
2.The construction unit shall implement the design in strict accordance with the relevant national construction
acceptance specifications.
3.On-site construction shall be carried out in combination with construction drawings and standard drawings. If Design Department Overseas Brand Department Drawing page
E-23
there is a big difference between the drawings and the site, the construction party shall communicate with the
supervisor/designer in time before construction.