PROJECT : Pembangunan Gd. Showroom & Hotel Bintang 3 WORKING LOAD : 320 Ton
LOCATION : Jl. Putat Gede Baru No. 236, Surabaya PILE TYPE : BORED PILE
PILE DIAMETER : 1000 mm
PILE NO. : BP 203
1000
% Working Load Deflection
Load (tons) (mm) 950
900
0 0 0.00
25 80 0.68 850
Load (tons)
750
100 320 3.37
125 400 5.21 700
500
450
400
P Ultimate = 925 ton
350
300
250
200
150
100
50
0
0 2 3 5 6 8 9 11 12 14 15 17 18 20 21 23 24 26 27
Deflection (mm)
De Beer METHOD
PROJECT : ROYAL DENTAL HOSPITAL WORKING LOAD : 320
LOCATION : JL GADING GOLF BOULEVARD KAV G/2 PILE TYPE : BORED PILE
SUMMARECON SERPONG PILE DIAMETER : 1000
PILE NO. :
0 0 0.00
Load (ton)
1000
25 80 0.68
50 160 1.17
75 240 2.64
100 320 3.37 100
125 400 5.21
150 480 6.19
175 560 7.12
10
200 640 8.52
1
1.0 10.0
Settlement (mm)
Qult Tidak Dapat di tentukan
Ton
BORED PILE
mm
LOG S DE BEER
D
10.0 100.0
Settlement (mm)
ESTIMATION OF ULTIMATE BEARING CAPACITY
CHIN'S METHOD
PROJECT : Pembangunan Gd. Showroom & Hotel Bintang 3 WORKING LOAD : 320 Ton
LOCATION : Jl. Putat Gede Baru No. 236, Surabaya PILE TYPE : BORED PILE
PILE DIAMETER : 1000 mm
D e fl e c ti o n /L o a d ( x 1 0 ^ - 4 m m /to n )
PILE NO. : BP 203
0 0 0.00 0.00
25 80 0.68 85.00 200
180
50 160 1.17 73.13 160
Defl ec ti on ( m m )
C2 C1 s/P =
s/P (x Q = Qult
(x 10-4 s (mm) x 10-4 (ton -
fc
10-4 mm/ton) 1 1/C1 (tons) = Q(tons)
mm/ton) )
Page 6
DATA
Page 7
DATA
Page 8
DATA
Page 9
DATA
Page 10
DATA
Page 11
PROJECT : INDOOR COASTER DUFAN
LOAD - DEFLECTION CURVE
AXIAL COMPRESSION LOAD TEST LOCATION : TAMAN IMPIAN JAYA ANCOL
Pile No. BP 84
FRANKI CLIENT : PT TAMAN IMPIAN JAYA ANCOL
100
STRUCTURAL CONSULTANT : PT NUR STRAITS ENGINEERING
30
PILE NO. : BP 84
DATE CONSTRUCTED : 9/4/2018
20 DATE TESTED : 10/4/2018
50
40
30
LOAD-TIME
CURVE
20
10
-10
DEFLECTION - TIME
CURVE
-20
DEFLECTION (mm)
TIME (HOUR)
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
ESTIMATION OF ULTIMATE BEARING CAPACITY
DAVISSON'S METHOD
2
1000
PROJECT : PEMBANGUNAN GEDUNG SHOWROOM & HOTEL BINTANG 3
LOCATION : JL.PUTAT GEDE BARU NO. 236, SURABAYA
900
800
WORKING LOAD : 28 ton
PILE TYPE : BORED PILE
PILE DIAMETER : 3o cm
700
LOAD (ton)
d = P.L/E.A P = Load
600
L = Pile Length
E = Modulus Elasticity of pile
500 = 0.3 . 106 kg/cm2
A = Cross Sectional Area of pile
= ### cm2
400
For : P = 1000 tons (hanya sebagai acuan untuk mendapatkan P. ult)
L = 21.0 m
300 d = ### cm
= ### mm
11
0 P Ultimate = 925 ton
0 5 10 15 20 25 30 35 40
DEFLECTION (mm)
KESIMPULAN
AXIAL COMPRESSION LOAD TEST
50 14 1.27
0 0 -
100 28 2.73
20 0 0 -
150 42 4.22
0 0 -
200 56 6.63
0 0 -
PENURUNAN ( mm )
BERSIH/NETTO
0.18
0.71
1.25
2.58
KESIMPULAN hal 13