Project TAIFA INDUSTRIAL PARK ,SU Date : 29 Juli 2020

Location : SUB GRADE JALAN Done by : -


Koordinat X= 809689 M Remarks : NO.03
Y= 9278909 M

Maximum Dry Density 500


95 % MDD
Optimum Moisture Content 500

No. Of Blows / Layer


400
Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
300
Dry Density
(Lbs)

300
Load (Lbs)

Penetration Dial Reading Load


Load

(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 11.00 122.54 200
0.5000 0.6350 0.0250 17.00 189.38
1.0000 1.2700 0.0500 27.00 300.78
1.5000 1.9050 0.0750 32.00 356.48
2.0000 2.5400 0.1000 36.00 401.04 100
100
3.0000 3.8100 0.1500 45.00 501.30
4.0000 5.0800 0.2000 52.00 579.28
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.000.501.001.502.002.503.003.504.004.505.00
Penetration (Inch)
CBR Value
0,1 " 0.2"
13.37 12.87
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14