Project TAIFA INDUSTRIAL PARK ,SUBA Date : 29 Juli 2020

Location : SUB GRADE JALAN Done by : -


Koordinat X= 809799.39 M Remarks : NO.05
Y= 9278873 M

Maximum Dry Density


95 % MDD
Optimum Moisture Content
500

No. Of Blows / Layer


Wt.Mould + Sample
Wt.Mould
Wt Sample 400

Volume of Sample
Water Content
Dry Density
Load (Lbs)

300
Penetration Dial Reading Load
(Inch) mm (Inch)
0.000 0.000 0.000 0 0.00
0.2500 0.3180 0.0125 5 55.72
200
0.5000 0.6350 0.025 11 122.58
1.0000 1.2700 0.050 20 222.86
1.5000 1.9050 0.075 26 289.72
2.0000 2.5400 0.100 29 323.15
100
3.0000 3.8100 0.150 32 356.58
4.0000 5.0800 0.200 37 412.30
6.0000 7.6200 0.300
8.0000 10.1600 0.400
10.0000 12.7000 0.500 0
0.000.501.001.502.002.503.003.504.004.505.00
Penetration (Inch)
CBR Value
0,1 " 0.2"
10.77 9.16
Subang,19 Augustus 2020

Juangan lupa angka kalibrasi Proving Ring


Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14