You are on page 1of 52
CONSTRUCTION OF MUMBAI - AHMEDABAD HIGH SPEED RAIL, PACKAGE NO. MAHSR-C4 Handover of Viaduct between C-4 Civil Contractor (L&T) & T-2 Contractor IRCON) ® LARSEN & TOUBRO = WEG 66a Section: 3 Handover No.: 29 Stretch: 0.935 km Spans: 24 (253P14 to 254P13) Chainage: 253.540 to 254.475 Handing over / Taking over of Viaduct between C-4 & T-2 Contractor ee eT wert |r eh per epomontined 8) = aan Se | ren ET @ vassen sr000N0 cose | MGM OOS Cone ao oo ae is — [TeSaeE | waswearemorsiee 2a 25354 254475 = | ‘signature: wk . 226 Joa}ay 1 Handovechecklis oT Contactor, y 28 Spans Anmenurest Construction Road shall bea per Tech Specs 2 Constrtion Road 835 Meters C8 Contract. Shared access il all interfacing contractors. 3 [suney Annexure? c-4 contractor 1:2 contractor [contractor's Representative Y.\.flamnana Abvcts, [Contractors Representative Date: Signature: Date: Takew Own subject tO Cys aysurente ood an pen poset Whe schedule shored vide Pmc-fes Det wo . 12 -SHe-Lt- 24-018 dabed 29.02-20214 RAJESH MR| OSh3 pool Iconstruction Manager | jreon International Ltd MAHSR T-2 Project e ‘Summary of Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor roiecr [vurmbol abmedotod High Speed Ral Package No, MANS CA cut |natonat igh speed Ra corporation Limited (NHSRCL) ae Gi contacoriea) Engineer (MCC) | _TrackContrator (2) Ensncer (MER) = = eS PUTS) — G usssen a rovsno = Hea bea" {aren &ToubroGonsraaon Tear Mais PCG | Won erations ie Consort Annexure-1 ee amwermnonia Loe] amet 253.500 25301 12551425 | MANSA/CA/T2HO/S3/253P10-15 28022008 | 7125490910. MANSR/CA/T2/NO/S3/254P09-10 28.02.2028 2 25ap15.16 [MANSR/C4/T2/HO/S3/253P15-16 | 28022024 -22_—«-254PLO-AL | MAISRY/CA/T2/NO/S3/a2Sa10-41 28.02.2024 3 25apn617 | Mawsnyca/T2/Ho/s3/253Pi6-17 | 28.02.2024 23—2s4Pi14a2 _|-MAHSR/C4/T2/HO/S3/2S4P11-12 | 28.02.2024 4 sani MANSR/CA/T2/NO/S3/259017.18 25022024 | 24 2541213 | MANSR/CA/T2/NO/S3/254PI243 | 28.02.2028 5 [sapieas | MANSRCa/TaINO/SIasIRIBAD | aeOR20 « psarisa0 wansn/ceramoisaswiez | mae 7 wetat | waenraraneraire [aaa ||) - “2 fswaiaa_wasvewamo(snsmna mame | 9 23n228 mansn/ca/r2/Mo/s3/2sap2223 | 28.02.2028 | 10 awa waslaramosnsama mmm | [a fawess | _wasweanemaasesas | marae — 7 12 sspasaseror | ManSn/csraiMo/saaswasisaraa 28022008 13 aeworee Taausecaramno/safasirorea 28022028 “| _ ie aswones TMaNSR/caramo/ssfasaroz0s 28022028 _ 1s asamoe wasvommosname mmm SSsS~™SS~*«* 16 serous mansucarramo/spesirees | aao2a02 | || 7 200506 MANSRCH/TAINO/SSISAPOS-06 __—2802.008 | — 1a ase906-07 [MANSR/CA/T2/HO/S3/254P06.07 | 28.02.2028 | 19 200708 MANSI/CA/T2/NO/S8/254°07-08 78.02.2028 |_| 7o_fiwoece | aancaramorsarasavecs | camnann [ et contractor PRaconsacor jones VV. Ramen g Mosbs = — one fe =. w alan KAgion MR construction WV MAHSR T-2 Project Handing over / Taking over between C-4 & T-2 Contractor - Survey ST SR NERO ET roel a oe IEA Quswe ion MEG Tae sarin aed | — bebe Annexure-2, (EG er srsrenorare aasnae = a = 1 [Ault survey benchmark on topof deck atthe start and end of handing over ston (XV.2) nd @ ‘very 1K Mid Section Joint survey between Ct and T2 Contractor Tobe provided by C4 Contractor through T.Cap fas bute ignment and swucture Centrale (Staignt and Curves sections) a cimanatnis iii ea ‘Subomited to PMC-I 4 conan Ta cantor Name: VV. Romana Ansty Names Jenne ere we mjorle4 |) RAJESH iconstruction Manayer i * 0S-03. -WoLy jjircon Intern MAHSR T-2 Project Dy = DA Dak Mignrnante be london "Contenbine (steveiyta + Crna Eerany ako cone? Inspection checklist for Handing over / Taking over of Viaduct between C4 & T-2 Contractor PROIECT ‘Murai Ahmedabad High Speed Rall (Package No. MAHSR Ga) ‘CUNT ‘National High Speed Rail Corporation Limited (NHSRCL) ne ‘Ce Contactor 4) Engineer (PMc) ‘Wack convactor(Fa)| Engineer (eMETRS) © wassen a roven ae MELT @ a 3 Electrical 3.1 OWE foundation [22 Provsion of ONE mounting le (00 mem nner ia) 33 Operational check for OHE foundation drainage re water fw) $24 Provson oft mlong Eating cable embedded in OME foundation 35 Metal fencing behind ORE foundation [38 Provision of branch ighting / outlet box conduits Between ONE Foundation Yo cable +3. Pachor foundation, alongwith angle and ha 3.8 _rovsion of eathing cable for OME and ther metal elements a ‘Larsen & Touro Construction “TEAP MARSH PEE Irconintertona id 1 consort wansvearnos 3 ] 255 | P- 14 /ic 29/02/24 253 P-14/is 40 Site “i Sheae Coonecios in Up Pstion Specs as epproved x 2 eve pegs 06 Hos on Ech Grder@ Eau secing) hk x Gi dinint $ ncFelecl a4 42 “43_Handhole and conduits?) cover concrete “44 Traneversacondu(FeP) “45._Provsion of spare wie nserted inside condu(FE>) Sa |4.5 Operational chek or eaulpment ourdaton coi, cable opering handhale and | x 7 Mechania traverse deve foundation x riers and Dues 51 Nowe baer TR =e eres 52 nstalston fable duet-Power - rn 5.3. stalin of eabl duet- SAT ‘Cable duct Powe’ and SET) with opening provion for cable entry at warsverse [55 Provision of7ype2.23 opening at bottom of abe duct 55 Metal fence t foston 5.7 Evacuation barrer nding Panera | 6 otnere S ‘rain spouts _Qoeratinal chek for drainage spouts ee water ow) ross drainage pipes underneath tack bed installed at ossover, station appreach and 1.4 Wate stopers and E Plate 155 Closing of ig holes 17 Nainteranca door “58 Gier surfaces clear of al dabrs [loose material 19 ier Capto be Cen ofall debries/oose materials (pope Contractor ewer Sy Contractor fees Vit: Rasoamna_quursbg re ‘ ‘construction Mahager ” ssleclan ‘on International Ltd | R ' OS-03, RK Nowe bamev mising of 253 Pas. 2s5GP1, Osh A-P2, oF 25 P2-P3 , ab 184 PPh, cb 256 Puy PE 3 cH psovided in oece MEM Z F Toterinediare shar Conaecer, Me End Shar Conaettr (lo¢ 16m) —Gok_nvallabley, aT yee tales bowers ab ers amrsved we Spero liaonl= See re xu demwina, > Seiten. |$ ca fuitadle., Pease see Prot Mar 1,.2024 3:41'31)RM Surat, ‘Gujarat Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor ‘Mumbai Ahmedabad Wigh Speed Rall (Package No. MAVSR C-#) National High Speed Rall Corporation Limited (NHSRCL) ~ ‘Ga Conran A) Engineer (PMc) ‘Engineer METAS) “rack Contactor 2) @ essen a oven cXxoyom WZZLLA 3 Hectrial 5 |talfercng behind OE foundation — oO [Provision of branch ighting/ ote box condi Between OHE foundation oeable long ith anle so channel able or OHE and other metal arate ‘aren 6 Toure Comacion Tene ANSR PE connate conor MAHSRIATAINO! 2.) 953915 [Ib 2slorfay sli Bo Meter 1__Sheor Connedtrsin Ubriaht Position & Spacigs as approved re 2 Level pegs (06 Ns on Each Ger@ Equal spacing) x Seg Crome ple [str eauipent foundation ‘anemeamete foundation Harchole and condutfFEP| cover concrete “raneveres cond) Provision of spare inside condutFEPh (Operational check for equipment foundation drain, cable opering handhoe and ‘Mechanis traverse deve foundation Dares end Duets 52 sa Instalation of cable duct S&T Sa 55 (able det (Power and S&T) wit opening provton Tor cable erty at transverse Provision of Typed.2.3 opening at bottom af abe duct ‘Natal fence at elation ‘Evacuation barr Including handed ‘others » }52__Operatonal check for drainage spous (ee water Tow) ‘53 Coss drainage pipes underesth trac bed stalled at eossover, station approach and (54 Water stoppers and EPlte {65 _Cosng of ng oles (5 _Hancra at river sans {67 Maintenance coor 6.8 Gide suas e clerof al debris ooze materi {53 [Por Cap tobe Clear ofa dories/oose material (Ca contractor IName = Wr Ramana Much, i RAJESH A . (OS. ‘Construction Mahager International Ltd. Date > cy Penided wales slopres & seein fesiement ab ROS aepsoved Avuilable, please see Pholer abtached Ta er > Wate Stopper areinfingment = i daira, Gn err He > srorconnenn, | re TA WF TaterInation Shor Coaaetion # End Shear Ganetiey (to 44ginn) ~Wea Ausitad sy Tspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor FROIEGT [Mural Ahwsedaiad High Speed Rai (Package No, MAFSR C3) ‘cuent "National High Speed Rall Corporation United (MHSRCL) == Grcontrcr a) Engeer PCC “Trek Convocor(™2)] Engineer (PME) = ae rcs — © wasen @ roveRo Pee MED | &Bb&e= Caren Tub Consroion TAP SR PEC con erations "NE Censom mansevca/tziHo/ $3 ]aS3 Pll loz, > 30\bl 4 AO Meter [1 ‘Shear Connectors n Upraht Postion & Shacigs as sp Froved ea il 2 Level pag 06 son Eaen der Eual space) A x 3 eel 30H foundation A x 32. Provsionof Ont mouringhle GODme ner dl 33 — 4 Provin of long Farthing ab 7 5.5 Mata fereng behing OE Foundation i “26 _Prowson french varting/ oer box conduit Between ORE Fundaiontocstle a “37__[Ancor founding wih nl nd chanel Ty 3.8 ovina coring cble for ONE and eer met araos ee isa — ZA SBT equipment foundation 42 Anemometer foundation 463 Handhol ord cond FP) eve concrete oe “ha Taner cond FEP _ “45 Prouson of pare wire neers inids cond XE) “£5 Operations check for equ foundation rin cable pening, anda ane {47 Mesranea avers dec oundson eccat Msg ock, compete} K A peed cs Eanes Siete a a igo ray TEN = 3S postal pets oping thon ate ae E - $5 haatiseret ian 57 Evcution Grier incu and EI ‘fnctad\carke “ees | gone ee —— oe oF opie aa Ta Se RT k | $F Cor aorg poe aetna coun aod oo is eotea gi = Eee Simona = ty eorarinnas aia ea meat Sh persed vaaiebontnent ome lone TT ; _ oo, R124 ae thieat B Trenton. a” Hebe Fe Preie hfe eee * 5 ed, bee lecafiirre qidah_curpoce not smart. nin) ~ God fVtala ¥ aotand te Gaaevorg End Sheuy Coanecey (10416 hm) SS Ene Howe saat” abtached: es wate Stopper are ergot re [D etosoonGaerEaperinshed= | a > Srear Cover Bar, aa Ss ch Pewided wales Sheree 3 S40 © sein foscomest 04 pes aprod dawing, aa Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PRORCT ‘Mumbai Almedabod High Speed Rail (Package No. MAHSR C4) ‘cUENT ‘National High Speed Rail Corporation Limited (NHSRCL) ————S Track Contractor (72) Engineer PMETRS) Tee rea— MLM | 6s ‘cuilcontacor( a) © earsen a roven0 taser TeaboCnstocon TAP MAROC icon intenatnal ti| _ n€consoraum mansevea/raiio/ $3 JaSSP IA aslorfay Spas WO water Shear Compactors Upigi Postion Espadings a approved lors a 2 Level pegs (08 Noe on Each Gdon® Equal spacing) 3 Setrial ‘OE foundation A Provsion of OME mounting hale (S00 mm nner di - k ‘Operational nec or OH foundtion drainage res water ow) FrovSon om long Farthing cable embedded in OHE foundation ‘Metal feneingbehind OE foundation Pravsion of branch lighting / outbox cond between OWE Tourdaton vo able ‘Anchrfourdaton song with angle nd chanel ‘ST equipmentfoundation [Anemometer foundation Handhole and cou) cover concrete Transverse condutlFEP) | Prowsion of ae wir sered inside cond?) (Operational enackor equipment foundation atin, cable open, handle and ‘Machanieal traverse device foundation ‘aries and Duets ‘Nie baler instaltion of cable duct Power '53._nsallaion of able duet “S&T “Si Cable cuct (Power and S&T} with opening provsonfor cable et “55 _provbion of Typed.2.3 operigat bottom of cable uct 5.5 Metal fence st leaton “57. fvacuston baer induding handral — (peraoral chee Yor ana spots ee water ow) —_—— (63. [ros oraogeppes underneath vack be stad at crossover, satin appraachand| x’ |X. Sa aed De [=x — 6s lifting holes _ i a x x] Se feces - ae a anna a | [—# i 6 Gee sue clear of a db bose mara POR 163 Per opin be Car of al debrieanze mate iA [eA contractor [F2 contractor irate a ' 0S.03- ‘Construction Manager’; hg hfe indies Fe seehaqued defini, sae oda eed Jerk fe wo. femibecl Fo ginter given sind FP Met widade Shay loan. EAY Shear peneteres inn $16 9h ) - Perera 1S Avy wle, D> Was Reppert i Please see Phobo attached. > onsion Ger ge hed = is > snwarcoverbusno, |__<#2™ Q. > cy provided antes stopres ann Ox som este-men ob pos atpsoved deawing, . vivo v296 Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT | wut akmedabad High Speed al (Package No, WAVSR 3) CuIENT | Nationa igh pee Ral Corporation nite (HSRCL) Gal conracorte) Engineer MEG WoekGonvecor(Fai] engineer (MCAS) G© wassen a roven0 a \MEDIT Ses Taser Tovbr Gnsiacton Tee ARR ron ieratnali| —n€Coneortam Mansn/co/T/HO/5%) 2 SSP \BI19) for fay SBP 189 40 Meter "T_ Shea Connectors Upright Peston &Spacngs a approved 2 ‘kev pegs (05 Nor on Fach Gider® Eaual spacing) 3 cecil mT ede dem f 3: OME foundation hoe (500 mminner sa) ‘ol fevang behind ORE feundaton Frown of branch ihting / outbox nd Between OH foundation Tobe {netrfurdaten long wth gle and chanel rovion of earg cable for OME nd ote metal emer fandhele and conduit FEF cove eonerte 4a Transverse condut(FEP) 445. Provision of spare reinserted sida condui(F=9) |4.6 Operational check fo equipment foundation cain, able opaning,handhole aod jechancal traverse device foundation aries and Duets — Sa Nowe barr 52 Insalaton of ble duct Power 53 instalaton of eble duct -S87 '54 Coble duct Power and Sn with apering prevson for eable entry at tranverse [61 Drainspours 15.2. [Operational check for drainage spouts re water fw] 6. _ Cross dainage pipes unsereath rack bed installed eoatovr, ation approach and ‘6.4 Wisterstoppers and E] Pate x x — 5 Gosgot ing his xx 66 [andrailatriverspans — | 3 x _ '6.7_ Maintenance door — x x Ger aces car of a obs osama xx Es ar Capote Char ofa derisfooverterab xx [eaconrcor contactor Nene WV: Ramana Mug by h ; RRESe WR 05 -D3. Y ‘Construction Manager’ sgtecon I i ate: [tature- ba Crindede- pron binedl eae ts Sindh sanfance vast f FB darerbeble Shear Ganedr Gd Shear Consecter ($04 16mm) ~ GA Avda Available, plage see pholo qached anene ve ae mo > ch provided ~svinb-comenh & > sem conr anno. | = wales stoppers at perc approved dsqwirea, D253P18-19 Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT ‘Muribai Ahmedabad igh Speed Rall Package No. MAHSR Ca) ‘cuENT "National High Speed Ral Corporation United (NHSRCL) 33 3a 35 38 1 Shear Coanetosin Upright Pasion & Spacngs as approves “3 Provision oft m ing Eathingcabie embeded in OHE foundation Gea Contant) Eanes PCC) co © waasen a rover =. \MELDIF Taser 8 Toubo Gonnucton Tear AR ME a icon rational mansasca/r2iHo/ $3 195% PIA PS 19]20 |Level pes (06 Nos on Cath Gider@® Eaval spacing) ‘Operational check for OHE foundation drainage (ree wate ow) Metal fencingbehind OFE fc Frovon of branching /outet box conduts between OHETourdation to cable ‘Ancher foundation, along with angle and chanel | xx x x xP - a nian a x x f x x “45 Provision of spare wire seed ride condutl =P) x x Operational check for eqpmen foundation rain, cable opening, andhole and x ‘Macrae traverse deve oundoon x Bares and Duets - oe ms; x 52 - x at [53 instalation ofeable uct x a SA Cable duct (Power and with Opening provision for able en transverse x <—] 55 Provision of ype.23 opening at bottom of able duct x [515 Metal fence at cation x x ~ 57 Bvecuston bare ineludnghardrat x x 6 Others “BE_Drain spots - x — 2._Operatonal hacks damage ous fe a 163_[Grosaringe pps undereathvack bed stale at cossower, Sato apprcachand) og |. (Water stoppers nd Plate Ai 5 Bonn of ing oles lee 65 _andra aver spans x * 167 Msinterance door xx (6 Gide sure tear ofl debi loose mater BAX — 63 Pier Capio be Cea ofa debievloose mater Ax (Ca contactor name = VV Rosmracma duscbes, 1. 2elalny ¥ Cheah conmeaDh. rad + Span Ph not menboned of Na 7 Lorerinaliaks Shear Gove tier, Ad Sheay Groecty (W665 16 hp) — Mod Available Available, Fr mas naar nga Woe Please see pote attached. ean Sa le Pa > ster conr suena, | 2 a provided -wrafostemenl & T wales shophere ab fore aspsoucd deeattena. NaNioh VFL) et Thspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT ‘wumbai Ahmedabad High Speed Rail Package No. MARSR C2) ‘quENT [National High Speed Rail Corporation Limited (NHSRCL) => ‘Ga Contractor) Engine [PMC Track Contractor (72) Engines (PME-TRS) MED | eee © warsen a roven0 Taser & ToubroGonsracton id TeaP ANA PEC icon iterations] nconsomum MAHSRICATTAINO/ S31 9S BP20 [AL 93 [or Jog 3530501 ao Mew Shear Connectors in Upright Postion &Spacngs as approved 2. Level pgs (05 Nos on Each Gider@® Equal seating) 3 Beavial 3: ORE foundation 38 rovsonof br 27 And foundston, ong wth le ar ranrel 3: Provo of ering cle fr OME and ther ret eens ation 42 Anemometer foundation 25 Proveiono pare wir inserted nde cond EP) “£6 Operational check for ecuipmentfourdstion dain, able opening hardhale and 47) Mechanica traverse deicefoundaton — x eco 2 3 - a 54 able duct Power nd ST) wth opening provion or able etry at WanSvare % x [x] - 55 Provsion of ype23openng tact of bie dut - x | “5 Metal fence at election “Ek « x] 5:27 ecutn Grier inno — ex € omer ee — 6c _[Oreinspowts = Kee — 2_Oprtonal eco dane pause wae fo) hx - £3 Gos dromae pips ndereth kbd stated como tov approad and! — ye | 9 —— a Mii epg ond Pte ” kx - “65 Closing of iting holes —Tk x Henao repens yee ~ 62 Mantras door - - ex Ger races care a abi ea ir —— ee 63 [Pier Copto be Gear of all debries/loose materials MA xT a Constr Fratonvecor ame VV: Rasmanea Ainchs, ame looms 05-038. ‘wt ‘Construction Manager » one, SRIRY 4iIrcon International Ltd... ¥2T plage exten ¥ " ¥ ; i conf Smote + Litto pen gil wok + @ Span. ved , H Anteredute Shuay Conse ttor, Cad Shear Cane cir ($6 16nk) - KES ree eae YS pleas see Phot abacked. Fimo egret AES -cinanetes : Peron eee [oem (a en Occemon? at poo appeared d-sawieng. Span id 253P20-21 Niet) Premed Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor ROIECT | riba Ahead igh Speed Ral ackage No: USEC) cunt | Nationa High Sped ail Corporation Limited (AHSRCI) = Gil conacr ner PET Tack Gonracor(Fa]| Ener PETS) © wse0 4 rovsRO ne MED | Sea ‘ae Too Cones Tear aR creat] mavsvcerano/ S3]25% Pal [an 2\ Jos 1_ Shear Connectors Upright Poston & spacings a approved 2 |eve pegs (06 Nos on Each Girder@ Equa spacing) 3 etal 3.1 ONE foundation 3.2 _Provsion of OHE muting ee (500 mm inner dia) _ 5.3 Opetational heck for ORE foundation drainage res water ow) 35 Mata fencing Bind OHE foundation — Provision of brach iting / ute box conduits between ONE foundation to able "Anchor foundation, along with angle and chanel aT ‘Sa equipment Foundtion 'anememeter foundation Hanchole ad conduit] cover concrete 4 [franoverse condulEF) 5 Provision of par wire nserted inside conduit) ‘Operational check for euipmant foundation drain, cable opening andhle and 'Mechanialtraveee device foundation learns and Duets ~ tS able cuct (Power and SAT] with open provision for eable ei Provsion of Type,2.3 opening at bottom ofcable duct Meta fence at cation — [5.7 evocation bare inciuding handrail Others 61 Drainspouts 15.2 Operational heck for drainage spouts (re water low) [52 crot ranage pipes underneath trockbes ied st crceover, sto ‘a Water stoppers and! Pate 55 Closing offing holes 16 Hendra arr x x Pros ofearbing eal lr ON sn aha ntl enans Kx 3. [rer Capto be Gna of al debriewlecse rater 4 Conan Contato Iname:- WV Racsaaana Murch, pre ee 7 ATE OS-0S wis ‘Construction Manager’; — ae, WIR con International Ltda. ¥ Sante core e—eaprined Fo lean ¥ Spom Dd met, morhined At Ueda, toon Fon gindetisubface fF Price edde Shear Ganevrer, End Sheay nb smote, « Ganecey (40446nm) ~ Bek Avetabi Prailable, Please 2° Spot ch peovided wales slofioc 2 Tr Yex > wae stopper igen = Ae a Gr ae Fhe 1s) > sear conrtaano, | 20 O€ = S40 mm BL seintestempnt a Rone apPreoved dsavira, Tagpection checklist for Handing over / Taking over of Viaduct between C4 & T-2 Contractor TROREY | Mumbo aedbed Fig Speed al acage 06. MAFSRCA) ‘cuENT ‘National High Speed Rall Corporation Limited (NHSRCL) ee Chon Eager Pea Taacontaar FA] engneer (PETA © ssn arour0 =. Min | see Canes Touro Gnnincon Tear ann mc nines id] ne enorme maser yo! S°> [p.6>309a [a | 90 |orfou ‘meter 1S 2 7_Shear Connectors in Upright Postion & Spaces 9 approved A 2 |evel peg (05 Nos on ach Gide Emil pach) 3 etal 3 OWE foundation - 3.2 Provision of OE routing le (00 mm inner da) 33 nope (ee water on) 3a frovon of ong eng eae enbees WORE uneoon 3.5 _ Meta fencing behind OHE foundation 3.5. Provision of brane ightng Feuer box cond 3.7 Anchor foundation, along wit angle ad channe 3.8 Provision of eating cable for ONE and other mata berets pment foundation 42 Anemometer foundation “43. [Handhole and const ever concrete a4 Transverse conduilFEP) 45 Provision of spare wire inserted inside condutlFEP) {45 Operational checefor equipment foureation dan cable opening, Fandhole ad 47 Mechanica travarsa deve foundation “5 Barversand Ducts S.No batter 52 __nalaon of edie duct Power 5. instalation ofeable duct S&T '5.4_Cabe duc (Power and Sr} with opening rovsien for eb entry at answers 5 Sieeetpee cesar 7 [ss peepee Se - -s SS Sas —— § & Others G1 Oainspaute = {52 Operational check Tor drainage spouts (eee wate Hou) ——_ i x {63 Cross drainage pipes undersath tack bed stalled at crossover, salon approach aod ‘Water stoppers andl Piate A {65 _Gosingof ing les ~K i 1 t ‘A Gide surtace clear of al dors Taoie mate 169) [Per Capto be Cear ofall debres/onse materials Th ti RAJ , OS-03. jIConst ‘ Whe wes | comes font 7 ectah. Teper Fo cleomt finan am ol = aes mart mentioned af Hb . + ad Lithing, hte, pethinn ginclen. edie: cunfecent omeste , #inernaade Shay Conettoy, Edd Shear Gomecer Cotten) - SaaS YS. Available, Saranan ota ane ae Please see Proto abbached. > serene £4 ch Peoided wakes Sloper & “sein fostement OF Meme alPswved d-muwina Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor FROKECT |" Mumbai ahmedabad igh Speed ail (Package No. MANERA) ccuent "National High Speed Rail Corporation Limited (NHSRCL) ——. Galton) Engineer (FE Co Trak onan) | —__Enginee(PME-TRS) @ ers on MED | See Laren 8 Toubro Cansvucton Ud "ear MANSR PEGA icon etematona {Consonim tannsnscarerio/ 1.5 2P9% [pep ae]o2 [ay a a eter “1 Shear Connector in Upright Postion & Spacings as aporoved 2 Level pegs (06 Nos an Each Girder@ Equal spacing) 3 dletieat 330m foundation 32 Prowsionof HE mounting ole (S00 mminne dis) He pects er ceien amen ery 3A Provision of 1 long Eth 415 Metal fencingbehind OWE fou 3.5 _Provsionftranch ghtng/ outer box conduits between OHE foundation to cable sundaton. along wth angle and channel 42 dation _ “43 Hendhte ard condutFEP| cover conerete aa Transverse condutFEP) 45 _ Provision of sprewite inserted sie con “45 Operational check for equipment foundation dain, able opening Randhole and chanical traverse davies foundation 52 Insnloton of eble duct Power “53 Insaliaton of able det -58T 6.3 Cross aranage pipes underesth track bed instal at rosso, sal GA Water stoppersareesPate “65 Cosingo!ifinghokes 5 _Handral at rver spans 67 Malncerance door Greer surace cer of al debe loose mate [Per Capto be ear ofall debries/oose materials if mars OS 08. Ww oes Manager | mk International Ltdohe: ¥ Spam. iAnc monty om NB - sar let hehe path gindeh surface lr nf smoot , Shean Bmeztok vee ya\ fo clean + F Wreewidate Shear Gagetiey, EM Sheay Connecter (10-6 16mm) “au fvai ara Vex Stina aie a we > Ch psovided aloe sterers & > snearcomrbanno, | SS or cH enbesteemont HS Res ap reves d-sawi-ng., Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor BROIECT —[~ mural aedsbod Hg SpeedTal (Package. MAWSRCA) ‘cuENT ‘National High Speed Rail Corporation Limited (NHSRCL) — oe Galconatar ea Tagneer OnE ee = = os G wrasen 2 rove8o pry MED | ®oes Taser Toubo Consacion TAP WAC icon eral TE ower ansecarr2in07 5 3 [5S > Pay [> 23102 [oq 3 _ Meter Shear Connectors n Upright Postion & Spacings as approves _ A x [enme 4 2 Leelee (06Mos on Each Ger us sparel A x | 2 eet — é 3a Eon - — 32 prov of Gr mating OE Bm eran] —— ce 32 [Dptaalfect for On fourdsn cage evar Row) x 3a prational mong tring ale nbd OF louaston ae - [35 |Metl fencing behind OHE foundation -k1o x 55 Previn of arch ire ole Nocondisbetwesn OH Toudsion wabe—| yx - xx ‘ncorfovdatonslgwth ge and channel irowsion of ating ele for Ean other metal eles Intalio of abe Power Instance act oe ble dct omer ard Sth ping pron fr ek sttansvere rovson of Typ'.23 pening bot fable uct Wetec son Fraction arin brain spouts — K (ewatona| chek or rina pout ne water fou) — K {css aimee pps urcrnesthack bad vad ost, tn approach and San = * Re nde later stoppers and EPlte ral at rverspane abot + HA =a conactor F2ontactor 7 fare = NA» Rasmasng Mure fes Name = FL, = i, RAJESH A S08. ‘construction Manager Su 22b)2I2U lon national Ltd | pst: % Shean _coomce BL hatefesh T repaid pmlaon fread wie foam sheep ra : WS pan DA mf matbed m MB - eases make Shear Conae tte» EXd Shuoe Connecter (19% Ken) - [ear ie + Aailable, oni areas red a Pleage so photo atache, spear coversasno, | S20 86 pvailnble, oe Taderinidete Sheay anettey, Erd Shear Garrecrey (49 6 (6 nm) Se Ga Contractor ea) Engineer PCC) TackContactor(2)[ Engineer (PMETAS © vsssen « roveno Sew Mi | Ses Taisen Toubro Constvton Lt TAP MANSR PEC Tron eration | aE Consoriam asus] [ay “hb Weer comm $0 Foal Lave peg [06 Not on Each Gere Equal spacing) 3 Beawiel 3 OE foundation 6 oan ch iphting / outbox conduits Between OHE foundation to 2.7 Anchor foundation, along with angle ad channel |3 Provision of earthing cable for OHE and other metal elements 4 ser - “44. S87 equipment foundation 42 Anemometer foundation ransverse conduit) wir inert inside cond EP) 52 linstatton of able duet Power 5. lnstalasonofeble dct -S&T 3a SS Provision of 1ype.23 opening atbotiom of able duct 535 Metalferceat Election 5.7 Gvecuston bare inewding handed 6 Others Biren spout {62_Operatonal check or rage spouts [reewater ow} 63 ea Wi 55 56 er 157 Moinenance door — 5.8 Ger sure i clear fal debi ease mat 63 Pier Coptobe Gear ofa devise materials contactor fone VA Rammasna Ayre bu R Nobe Barney mranng ck 24 r2tS # Toteame Late Sheer Gowerer, Edd dheay Connery (t¢ Hein) = Watdab: a ae ae. z =e onion Ger Fd = Ploase gee Photo attached. > shear cover arsno, | SS Ot 330mm ry > 6h Pxovides wales stontes, -relatestormens} + Pee app sou darcy, 254P02-P03 Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROIECT ‘Mumbai Ahmedabad High Speed Rail (Package No. MATER C4) cauent "National High Speed Rall Corporation Limited (NHSRCL) et Ga Contocor (Ca) Engineer (PMC TeackContactor(2)] Engineer (PMC-TRS) @ uassen a rovsR0 MEDI Larsen &Toubro Construction Ua. TeAP ASR PME econ ntematonal eyes es I Shear Connectors in Upright Poston & Spacing approved Ea 2 Levelpegs (05 Noson Each Gider@ Ea. spacing) a x “3 Becta ——T at x 3 | ae 33 a Ba Ex x “15 Metal fencingbehind GHE foundation — = x x ae 1 outlet bx zondts between OHE foundation tocatle | x x ~ x x x x 2 Anemometer oundaon — 42 Hnchol sr condut-EF evr conerete ‘4 Transverse conueleP) 415 _Provson of pre we sarted iid conduit] As |Operstoal check or equipent foundation da, ele err, Radha “£7 Mechanics trae dvi foundation " Baris and Ducts Sa Nosetorrer — x 52 talon of det Power T x 53 litalaon fel dot-SET — ox '5.4_[Cable duct (Power and S&T) 2 >") 55 ProvsonofTyp2.3 pening at bttor of ble ut x 56 piss eon a toa [facuaton barr incudinghandral [—* x mers = - — bran spote - 7 x prin check diane ps wate aw x {cos raage pes undrvesth rack dae SOR Han approach nd x Water nos ana Pte = ae [ese ofiting ae a i = Ian vr sro — = il Wabtenanc door - xe cra nro an $s [Pier Cap to be Clear of all debries/loose materials RA x xT a conrator Fa Conracor fame: a te are 7 - 28. % Io RAJESHIR ; DS 04. 1 ‘Construction : ‘paw pas. 26)8)24 sities otennutio eer [cate MATISRT-Z Project ¥ Span \d nsf mapberel of A HK Nope Barret orcang oF 254 03 -PH F Anieshetiate Shay Gonetey , Ead Aheer anecky (65 {¢hk) ~ Wek Weebly Available D> Pie Fred ‘yes Please see photo atarned. > We pp gna Vek [> Ei tosation Gder Edge Fished = uO >cb psovided wales gtoppos B > searcoartnano, | <2 ot BEImfescoment as Pers ahPrsoned d-sawina. 254P03-P04 Taspection checklist for Handing over / Taking over of PROIECT ‘wiumbai Ahmedabad High Speed Ral (Package No. MAHSR CA) ‘cuent National High Speed Rall Corporation Limited (NHSRCL) Gal convactor(€a) Engineer PREC Tak Conrator (72) Engineer (PMC-TRS) @ een a roveR© me. MED | Oz Sean a aan Ta nC niterstintil| icon musyernor S3)asu Pule 386 fou r— "Shear Connectors n Upright Poston & Spaces a approves Level pgs (05 Nos an Each Gidere® Equal spacing) I? burs aurestob he = oe 3.1 GHEfoundation a ‘3.2 Provision of OHE mounting hole (500mm inner dla) __ Fe ee a aT "3.4 Provision of 1 m long Earthing cable embedded in OE foundation SE ea oro 35 pate! Soap otto aa 3.7 [Anchor foundation , along with angle and channel "3.8 Provision of earthing cable for OHE and other metal AEfoundnionto able | 2 Anemometer foundation {43 Handnole and condu(FEP cover concrete 124 Traneverse conduit 45 _[Provson of pare wre inserted inside condut(FE>) 145 Operational check for equipment foundaton dan cable opening, harchole and a7 3a — = x ‘53 _lnstallation of cable duct - S&T aaa [sa cable duct (Power and St) with opening provision for cable ery at tanner 55 Provsonaf Type,23 openngat bottom of ble cuct 57 6 Ei Dronspous 162. Operational check or droge spouts (ee water fow) 13 _ oss riage ips unceenh reckBe stale aco a Water stoppers andl ie {65 Chsng of irong noes iN 6 Handi arver spans a feta - z 63 Grae sce cle ofa debris ani mat —# 3 [fercaptobe Clea of al debrisoose stra we pie [ca convaco [r2contractor fere= Recreate fore Fh | Razer wR 8-8. Ww ‘Construction Manager Date: [si i pol_Date: MR Wolee Bamey misang af. PYPe F Narermesate Shay Goactaer, Cad Sher Onsectey (18 ¢4¢ mh) Goh veld Auaj ToBI, erred P 7 ae Please Pewwicde waseg one Eston Sere Fed = . > searcoversanno. | _ ch Psovided whos slofioc B = DS seimbstoment Ab fore aprsoved deawing. 254P4-5 Taspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT ‘Wuribai Ahmedabad High Speed Rall (Package No. MANSR Ca). quent ‘National High Speed Rail Corporation Limited (NHSRCL) ———— Gil Gontracor(ea) Engineer (PCCW Track Contractor (72) Engineer (PMCTRS) 2 |Levelpegs (05 Nos on Each Girdere® Equal spc) 3 lets! (ORE foundation — Froviion of OFE mounting hel (S00 mm iner ai) _ ‘Opeat ona check or OHE foundation drainage ree wate flow) G uassen 2 roveRo =. MEDIF os Toren & Tore Consbcton eae MASK PEC icon iteratonal ii] Consortium mansescarr2no/ 53 [95 UPS [L 9302/94. uu 35 eter 7 Sen Conecors in Up Poon &Spscngasaproed Ie cert: fsa nee LE E x Prowson of 1m long arthng cable embedded in OHE foundation "35 Metal fencingbehind ONE foundation — 13.6 [Provision ofbranch ighting / outlet box conduits between OHE founds 37 ncher foundation, along with angle and channel 1.8 Provision of earthingcable for OME and other meta elements 4_(sar - |44_S8T eguipment foundation 42 Anemometer foundation “43 Handhote ar eondut(P] cover concrete 44 Tronoverse condi?) “45 _ Provision of spare wire inserted inside condu(FEP) |4 Operational chek or equipment foundation da, cable opening, Fandhole ad 447) Mechanieal woverse device foundation 'S_Baviers and Ducts oe are Instaltion of cable duct Power instalation of cable cuct-S&T (Cable det (Power and S&T] with opening provision for eabe erry at raneverse ‘Provision of Typ-1,2,3 opening t bottom of cable duct Meta fence at leaton “Evacuation baie ndusing Randa 6 Others (rain seo ‘Operational check or drainage spouts ee water flow) res aranage pes underneath wack bed stalled 2 crossover, talon approach a Water stoppersand ele (Clsing of ng holes anda at er spars Mabtenance door der sac sar ofl dari [lose material 163" [Pie Capto be Gea of al debries/loose materia 4 Contractor I: name = VA Rocmama Mursby one, S6)8/R4 RAJESH MR [Gonstruction Manager V Spon. PoP menPinad af 1B - Pr arated ye [> wate Stopper treme = [> WLovston Gicder Edge Fished 0 > Shear Cover Bors NO. a # Teter Wnediate Sheor Gane thy, Edd Shesy @ mere trey (40 $16 in tT MAHSR T-2 Project rm), ovailable, ) fom Pleace soe elo aHached. ch pemided wales stoptos 2 seiofesromest 04 poo arpsored sawing, Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor ‘Provision of earthing cable for ONE snd other metaclerants ser — ‘Sit equipmentfoondition 42 Anemometer foundation “43 Handhole and condutFEF) cover concrete “4 Transverse consutFEP) 145 _rovisonofspaewire inserted inside condu(FEP) ROT [ib nied ig Spee a Wage No MARSRCA cer | ana Wan pedal corporation Ute HSRC) = Galena trgner POD ‘eaomacera] tages PES) a a ra G@ wxssen a T0088 an MED | ee = Tine Taso coca Tana eens] coma wassueareno! S395 uPh] > 26] oof) asuPela 3h ‘Meter 1 Sex Gash Upen Ponta Spach oped tn om 2 evel pegs [6 Nason Each Grden@® ual pacna) AK x eit, dors 3 Electr i Se re a ——T 5 x 22 Poor o HE noun EO nr mo pl ht OF arto ag re var) 1% 5a Pont mengig be ented Orson za — 25 Met enrg be oeston = |b owovof bn ping ule 0 ci Btn OF RTO | Insaliation of ble duet Power Inealation of bie duet-S&T — [caie duc (Power ara ST) with apering povsion or able entry sttransverse Prowsion of Type-.2.3 openings boston of abe duet etal fence a location [Evacuation borer incudnghs [Sa Drain spouts — - ratiorl check for dralpage spouts free wate flow) ba 5 Casing of igh Wave stoppers and late Cros drainage pipes undecreath rack bed ietald at conver, sation approach ad TFancral at ever spens 167 Maineenance door 158 Girdersurtace is clear ofa debris loose materi 55 Pee Capto be Gear of al detris/oose materials Contractor [ra contractor VV Rasnasna _srurebes, wet nates @1RIR4 it i moe Toons janager'; OS-db. Ded vFrm ableel NG . Pip ts Tavtermidade Shar Conseco sy Eid Shar pink. nda sunfeee ref fnBlaol ‘ome: ona. domm gy inn 3} fret AVaila ble Available, Please see proto abachad. ware sapper serra > oanton er Ege Fnahed oe AD > shear covertar no, | S20 > ch Pewidel pales Sotho 2 9 320 o zg soimtosmment a4 prc aprrtwe a deavicna, vive y29e i Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT ‘Mumbai Ahmedabad Wigh Speed Ral (Package Wo. MARSR CA). ‘cueNT "National High Speed Rall Corporation Lite (NHSRCL) —— ‘Ga Contractor C4) Enaieer (PMc) TrackConrocor(2)] Engineer (ome) © vsssen « rovsno SE MED | oo Taree & Toubro Cnstton A Tea MARR PCC econ ternational TE Consanam mansesca/ta/Ho/ ¢2|95 UP2[ 3, 2.) 9. 5 3b er 1_ Shear Cometorsin Upright Postion &Spacings as approved 2 kavelpegs [05 Nos on Each Gider€® Equal spacing) a ect HE foundation Provision of OME mounting hole (S00 mminer dia) peationalcheck for OME Foundation drainage re 3.4 Provision of m long Erting cable embedded n OHE foundation 35 _ Metal fencing behind ONE foundation 13.6 Provan of aanchighting/ outlet box conduits Between OWE Yourdation te able 427” Avehor foundation along wi ange and chanel is le for OHE and other meta elements “2 _ S&T equipment foundation [42 Avemometerfoundsten [43 Handbole end conaut( FE] cover concrete se condultFEF) Provision of spare wine inserted inside condi) (Operational check for equipment foundation dain, cable opening, tandholeand OK ‘Mechanialtavree dai foundation sae tariorsandDucs —— - oo Noise barrier - - “52 etalon of eble duet Power 53__nsalation fable duct : 5 |Cable act (ower and S87) wih epenig proven for cable entry at vansverse '55._Provion of Type-1.2.3 opening at Soto of able duct. ‘Metal free atl eation vnevaton barr eluding hon [82 pertonl ico daape sous ee wai Tow) 163 _ Coss drainage pipes undarneath rack bed installed at cossover, station appa an “G4 Water sopoers andl Pate 55 Closing fing holes 66 Randell aver spans ‘67 Manterance door {6 Grdr srfae's car ofa debris / loose materi re 3. [Per Capto be Cro of al ceriesioose mater (ca contractor [F2 contactor fone: WY Ravana Mus {hen i OOF wa {) RAJESHIM \n ome SCRE iConstruct ionlilanager ea te o * aie prgecfeol frverols bed F WARSRT2 Project » Lyon Bh oot merAlnad_ at MB H Arnsertn\ dere Shor Connettey ¢ Eid Shear Gan. {sim ¢ {Cm =) We read YES Available. Sa or please gee cholo altached. ant Sas AO > sercomrtan wo, |S io Dch psovided Soimbseemen? 2 lualo-s gloppre 04 pox apponed desn wend. Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROIECT ‘Murmbai Ahmedabad High Speed Rall Package No. MAHSR CA) ‘cuent ‘Nationa High Speed Rall Corporation Umited (NHSRCL) ‘Gia Contractor 4) “Engineer (PMC-C) rack Contactor 73) [ Engineer (PMETRS] ga © enw aren na Maw | Ses 1 Shao Cooneciors in Upright Postion &Spaangs as approved Metal fencing behind OHE foundation ~ Provision of branch iting / ove box cond Between ORE To x [Anchor foundation lng with ange and chanel x ‘rovon af earn cab for OE and oat metal eles fh Tae 8 Toubro Gnsraton Tea MANS PME icone "Ne Conso mansecaeno/ 33]25u P3194 oz [24 PS BL Meer ————— axa ‘Level ees (06 Nos on Each Girer Eas sacing) a x |G dam ‘Machanialravere devs foundation Borers and Duets "54 Nowe tarier K x x > aio hs 5.4 Cable duc (Powe and ST wih eperingprovion for cable entry a anwar ‘ee es ea —_ 5.5 Provsion of ype23 opening a bottom of able duct [ox 5.6 Metal fence t ication [ox 5.7 Beaton dame ncuding hand [= - hers ~~ - 61 Drain spouts x ‘82 Operational check or droinage spouts fee water fw x_| '63._Crosaraoge pipes undereath ack bed tbe at cosover, aon aparcachand) "YQ — ‘64 Water stoppers and Pk x x] 55~ Cingliingaes . eet “65 Handral at rive spans - 2 eS ‘57 Mabeerance door Re x 6.8 Greer surface claro al dr oose mater Ck x i 53 [ier Captobe Gear of al dabe/oose materia BAL x1 =a Contractor [2 convactor Ime = Vi Ramana Aeby, ame = Ah \s aelaley fgg e Goan Dol mt menhin ie .} H Nove Bammer missing ot B2S4 P19 + doder maak Sher Gan. & Erd Sheay Can. tom gift mh — seimtoste-ment ob ca wlena Prailable ae tex Please cee pole aMached ost Ge Pa > snearcnar tno, | <2 oe > Ch Peovided unberc stores & Ree append Taspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROWECT ‘Mumbai Ahmedabad High Speed Ral (Package No, MARSR C4) ccuent "National igh Speed Rall Corporation Limited (NHSRCL) a Gl Contracor (Ca) “Engineer PREC) “Track contractor (72) Engineer (PMCTRS) © wssen «rove%0 ke. MED | Bea aren Toubr Consiroion ta TAP ANS PCE ron meernatinad ‘Comet mansncarraino/ $3]95 409 0 38[o2}oy 264 Pa fio Bb Meer 7 Shar Gomme in Uri Pasion & Spaces as soroed | xd awaTtal 2 ——owe 24 OMe fundoion - — 2.2 proviso of OHE even ee (600 mine a ‘Provsion of m ong Eating cae embedded in OE foundation 5_[Meta fencing bind OH foundation — vision of ranch igh / outlet Bx onda between GHE Toundation to able “anchor furdatin, sing with angle a chanel rovson of earthing cable for OHE and other metal lerients sar — 41. [Set ecupment foundation 42 [Anemamaterfourdation - Hanchole and conduit] cover corte Irensverse conduit -2) Irovsion of spare wire ered inside ond FEP) (Operational chek for equipment foundation ra, cable opening, andhale and rial traverse dea loundton Bares and Duets Nose borer instalation of ebie det Power instalation of cable doct-S&7 Cable dct Power and SE) with opening provision for cable ein at ransverse 55. ProvsionofTy901.2:3 opering at bottom of able duct 53 Metal fence at €eation Evacuton Samer neudng andl f ote S———_ = | Drain spouts — — | _ (pertiona check fr draiage pos ee wate fow) ee Coss dranage pe ndemestn race instal st esover aon apprachandy RK —_ Witerospes nd Pa - he hosing of Ringoes — (= ateet = andra at eves FT ii '6.7_|Maintenance door — 1a oe | [Girder surface 's clear of all debris / loose material Af x TiecCoptobe Car ofl debesoose mata MAKI xT j ‘construction janager | ational Ltd ' one: # poise Parnes misang ot 254 PS/lo oF Lateeln\dase Sheay Connect ¢ End Shay Cnnecoy [ohh ¢ Inn pes Rveuu ble Pajlable , > eae roca vee Please Soe photo ablached. > wate stopper a nfnament= Se ae 3 Cy provided waters slopgrs % =a oe Boirfersroment as foe apecoves dscawireg, Ro RveL Ts Cone ry Taspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor PROTECT ‘Mumtai Ahmedabad High Speed Ral (Package No. WAHSR Ca) ‘cuENT National High Speed Rail Corporation Limited (NHSRCL) —— ‘Cal Contractor 4) Engineer (PMG) “Track Contacior (72) Engineer (PMC-TRS) © warsen 00 =e Mian | ee ‘aren & Yours Consrrton TeAP ATER PCC icon interatonalid| corso mansaseare/Hol S$ [25 U P1O- 1 23 [o2fay UP Ib Sb Maer 7__Shesr Connectors in Upright Poston & Spacngs as approved 2 Lavel pegs (05 Nos on Each iden® Equal spacing) 3 eat 3 One foundation 3.2 _Provion f OE mounting ee 50D mm immer do) 33 Operational heck for OFE foundation riage (ree wate fy) A Provion of ongEart ‘etal fenng 3.5 Proven of ranch ahr out box cords between OF undbiontoabe 37-_Aaderfoundaton sore with and nd che! 28 Provion of eohing cable for OFE ard other mets emens A a ser — — “i SAT eupment ovndaton — ke 42 venom fosaston 43 Handhote and eordut FF] ever cone A Tranavereconst =F) 45 Provion of spre wie weed condutFER)—— 418 Operational check forequipnent ounatin dren, cable opening Randhawa 147 Mechancaltravers deve foundon Borers an Duets 51 Nowe barrier - 4 Cabe cuct (Power and Sr with opering rovion or eable entryattansvers® sh F55 _Provston of Types2.3 operingat bottom ofeable dct 56 Matalfence at ocaton '57-_faeaation barter ncucng hana ional check for drainage spouts (ree water flow) 163 Cross drainage pipes underneath rack bs installed at costowr, aon apevoach and (4 Water stoppers and E Pate 55 Closing of hinghols 6 Pandea are spans '57_Mairtenance door 153 Girder surface eclerof dab loose materia 3. [rer Capto be Gear ofall detriesloose materials fore oe rene Et fi RavcSAIMR “03. \w are. W/RIRY #Cc - - a & Traneuemse, andoks ae ote sa sem T a ¥ open Dd mash men ¥ binder af ti va ny surface nitcmbs te : ff Lovee bia S, ees Eeld Shear Gane ctor [0 £46 my > rod Te Aveilabl ae ae fuaikde,* Staaten ST o— Please see photo attached, es co th Provide atlow Sloohos 2 ) 45 Operational check for equipment foundation dra {7 Mechanical ravers device foundation '5_Barers and Duets Sa Noise ba slalaton of ble duct Power 2 Inetaiatin of ebledut58 55 _Provson of Type 12.3 opening atbotiom of cable duct ‘56 Metal fence a lesion x ‘82 Operational cee for ranage pou ee wate ow) x 1.3 Crows drags pipes underestn wack bes intl ot over, Ron SERED a x S.A Water stoppers ard Plate hie £5 ong effing es x 65 adr at rsp xy 67 _Mantensree door Sx [Ger sufoce clea of a brs ose mate Ax 5” [fer Capto be Clear of al abresPaose mater eA =a Contactor om femes Ws Raced Mureba ene oan, EINEM +S pan mmenfmeotaf Mtb rz Sheer exmeefos wutfed § freolerit fram cheeb; leary neque WA Upright shear conetton bottom not fillect TF gratin 5 Fi Tajeetieds Shear Gaaeery Edd Sheay Connecdoy WNnk $16 inh ~ Syed -AVellabg, Pe fine rae yer Prailable, Pr Seen ne Pkase cee pholo abtichel ee ee Ze > ch psovide) wabeos dopo 2 sein loses} a fort appeowd dsawina. a { 254P11 12 Inspection checklist for Handing over / Taking over of Viaduct between C-4 & T-2 Contractor ‘Mumbai Ahmedabed High Speed Rall (Package No. MARR C-4) National High Speed Rail Corporation Limited (NHSRCL) 4 sar Galonracr ieee TWaakConador(®a)| Enger (CTRS) G@ wsasew a rove80 <=. V/A A sos aren & Toure Consicon TeAP MARR PEER con trata "consortium maisuceranor $3] 95u PP2 [15 2sfoalga 12 eer [1 Shear Conectorin Upright Poston &Spscngeazappron@ x map| Poalede Fale 2 eve pegs (6 Noon ach Ger Ea sac) a =| 3 etal =! 3.101 fosndaion —_ Ah a - 3:2Provson of OFE mounting le (500 i ana ay OS = ————— — 33 jopeatonl check or ON foundation crane (ra wate Row) x x. [34 rover of ming Erg cable ened OME foundation oe 3:5 [Metal ecg tnd Oe ourdson - | 3.4_rovon of trarch ing owe: bx conduits between OE Toundbiontoaale Sfx) 37 je and chanel t 318” Prot of enting abl for Od othr neta earns 41 SSrequprenttoudsion 42 [Anemometer foundation {43 Handhole and conduit FEP over one SA Noise brit | 5.4 Cable duct Power and SA wih opening provision for cable envy at wansverse Prousiono"Type.2,3 opening at botom ofeabiedut x 24 _[TearovrsecondutlFEP) _ x {45 Provson of pare wire inserted inde cond =P] x 15 Operational checker equpment founeaton cra, cable opening handhold x = x ‘Metal feree 3 €estion ‘raevation barr eluding Randal Span. Dh meh a fing H Andee posiple gindel € Other Dranspis - 6.2 Operational chek or range spouts oe wate Mow) 63 ibe underneath ack bed tale at owover, Ratan appoREh ad - - ea ers and Pate — 65 Gosigot iting holes — - {65 Handel at verspne {67 Mabtenaree door {8 Greer sures dor oa ddr oare mated — (6.3 [Per Copto be Ceo of al debiesfoose mater [caconracor [r2Gentecer Name = VV Ramana mvesteg frame 3 RAJESH MR OS:08. 22h 66la)RH menpnreol mm NS construction Manager aopce. mot Smosh , Yevduse. Shear Gonaector, Edd Shumy Gaaceroy {6h teh — Nod jyailer Aveablabro, Please see pro abached.® > th provided wabero sloppers 2 ahaa Dw sper a FR es D> omon re Fed BO: > ssercomrtanno, |__

You might also like