X-Rail Roof Mounted - Plan Layout - Roof Top - Overlay Included 1
X-Rail Roof Mounted - Plan Layout - Roof Top - Overlay Included 1
10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 (As per client markup)
Client: Rigcom
Ref #: ARCHITECTS REGISTRATION BOARD /
SafetyLink
Innovative Rev: 0 NOMINATED ARCHITECTS
Fall Protection
Prepared by: RS/NV NSW
9356 NINOTSCHKA TITCHKOSKY
QLD
5527 NEIL LOGAN
X-Rail System BQ 1 1
4937 JAMES GROSE
7115 JULIAN ASHTON
2709 BRIAN DONOVAN
1595 MARK GRIMMER
AR-10C XX-03
AR-10D XX-05
This plan and subsequent quote is a GUIDE 7053 MATTHEW BLAIR 5528 DAVID KELLY
(RL1) X-Rail - Surface Mounted(Klip-Lok 700 TBC) 143,530 mm measurements, systems, system locations 10705 CATHERINE SKINNER
Telephone +61 7 3852 2525
and structures be CHECKED ON-SITE prior Facsimile +61 7 3852 2544
(RL2) X-Rail - Surface Mounted(Klip-Lok 700 TBC) 46,398 mm to presenting to the client. www.bvn.com.au
3310
3310
ISSUE DATE FOR
2000
2000
RFG-001 RFG-001 G 13/09/2022 Works Approval
H 19/09/2022 30% Submission
RF-001 I 12/10/2022 For Coordination
6,213 mm Note: Custom Corner
6,223 mm RF-001 placed over ridge ROOF J 14/10/2022 NCA RFI
8400
FL-001
RL1 FL-001 RL2 FL-001
TBC M 10/03/2023 For information - Building Shift
2000
2000
O 05/05/2023 Package 2 Issue to DOMA for review
2800
15,819 mm
03 03 P 17/05/2023 Final Base Building Design - Package 2
2000
Q 02/06/2023 Package 3 Issue To Doma For Review
RFG-001
FL-001 FL-001 R 16/06/2023 Final Base Building Design - Package 3
S 01/08/2023 Final Base Building Design
RFG-001
2050
2050
RFG-001 T 01/09/2023 BA03 Submission
RFG-001 RF-001 U 18/10/2023 For information
8400
WCT-002 FL-001
FL-001
WCT-002
G
N IN
F OP E
RA PLENUM 1925 ROO 1925
BUILDER
COOLING TOWERS RA PLENUM 7,903 mm
L6.07 BLOC CONSTRUCTIONS (ACT)
L6.08 L6.09 CONTRACTOR
04 RFG-003 WCT-002 04 CONSULTANT
S4B STUDIO
2000
1550
SERVICES CONSULTANT
CONSULTANT
8400
INDESCO
05 BASE BUILDING PV SOLAR PANELS 2000 05 STRUCTURAL CONSULTANT
CONSULTANT
FLOATING
GENERATOR ROOM
OVERRUN
OVERRUN
SLAB TO REDBOX DESIGN GROUP
23,361 mm
GENERATOR L6.15
LANDSCAPE DESIGN
ROOMS ATRIUM
8400
RFG-001
1
AR-10C XX-02
CHILLER ROOM
FT-07
FT-07
FT-07
FT-07
FT-07
L6.18
FL-001
06 1 GL 1 06
RFG-001
WALL CLADDING TO
TENANCY GENERATOR
60,647 mm LIFT SHAFT OVERRUN
RFG-001
PROVISION RA PLENUM COM BMS H ELC TENANCY ELEC CUPD TENANCY ELEC CUPD H ELC
U Roof flashing shown
2000
L6.16 L6.14 RF-001
DOMA
07 PLANT ROOM
07 CLIENT NUMBER
HYDRAULIC
2000 L6.01 FL-001
VENT PIPES RA PLENUM
7,927 mm
1909010
L6.10
FL-001
PROJECT
8400
1550
MECHANICAL
15 Sydney Ave - Commercial
RFG-001
PENETRATIONS RF-001 15 SYDNEY AVENUE
17,761 mm
WCT-002 BARTON
RFG-003 RFA-005
CANBERRA
08 08
WCT-002
2000
1925 1925 BVN PROJECT NUMBER
FL-001
FL-001
DHW PLANT
6,595 mm BOX GUTTER TO
WCT-002
4,756 mm L6.11
HEAT PUMPS F O P E N IN G RFA-002 TO ROOF PERIMTER 6,553 mm 1909010
ROO
L6.19 MAIN ROOF
8400
RA PLENUM RA PLENUM
RFG-001 DRAWING KEY
RFG-001
2050
2050
L6.13 L6.12 WCT-002 UP
STAIR 07
2000
2000
RFG-001
09 RF-001 RF-001 LOUVRED ACCESS GATE RF-001 09
2000
2000
NOT
2000
16,859 mm ROO
11,894 mm 2,581 mm U Updated structure (columns and
2,048 mm 1,859 mm frames) 0 2000 5000
RFA-003 TO REF
99° 81° SCALE
mm LOWER ROOF MAIN
11,733
Concept KEY 1 : 200@A1
Note: Custom Corner STATUS
placed over ridge
DETAIL DESIGN
Note: Custom Corner
DRAWING
placed over ridge
1 1
AR-10D XX-05 AR-10C XX-01
A B C D E F G H I J K 1 : 200
AR-10B 06-01 U