You are on page 1of 1

upon demand.

THEO BAR BND BENDING DIMENSIONS


QTY SIZE LENGTH WGT EP MARK V TYP CD A B C D E F/R G H J K O

7 C
18 N29 12000 1120 N29A2
52

return
2 N29 1600 17 N29A327

3150 9000 2000 670 453 3660 517 1500


1 N29 2710 14 N29A305

to
subject
1 N29 2730 14 N29A168

1 N29 2780 14 N29A304

copies thereof, are


1 N29 2790 14 N29A169

1 N29 2980 15 N29A303

2000
1 N29 2990 16 N29A170
2500

1 N29 3180 16 N29A302

Freeport Indonesia,
1 N29 3190 17 N29A171
18 N29 N29A4 @200mm T2

all
17 N29 N29A5 @200mm T2 1 N29 3450 18 N29A301

and
(STAGGER BARS)
1 N29 3460 18 N29A172

it,
1 N29 3850 20 N29A300

1135

that
P.T.
1 N29 3860 20 N29A173

condition
LIST-S LIST-R LIST-T
LIST-V

the written permission of


1 N29 4250 22 N29A299
(V14) (V1)
1 N29 4260 22 N29A174
(S5) (S1) (R1) (R5) (T1) (T6)

express
3 N29 4560 71 N29A296
DATE:

4000
1 1 N29 4660 24 N29A139
9 N29 N29A107 @200mm T2

the
2795

LAP

1 N29 4900 25 N29A295

upon
1 N29 5060 26 N29A141

EL. 2747.050

lent
1 N29 5300 27 N29A294

without
DN
T.O.C
1 N29 5460 28 N29A322

is
print
reproduced
STG. 1 N29 5700 30 N29A293
3000

D
BY:

1 N29 5860 30 N29A146

This
1 N29 6100 32 N29A19

or
Indonesia.
1 N29 6260 32 N29A323

copied
2 N29 N29A327 @200mm T2
6 N29 6350 198 N29A167

2
6
3

5
5

be
18 N29 6450 602 N29A107

Freeport
No.

not
2 N29 6590 68 N29A286
15000

10000

3000

may
1 1 N29 6660 35 N29A324

P.T.
SIM.

and
56 2 N29 6740 70 N29A166
SIM.

Indonesia,
of
3
6 2 N29 6790 70 N29A287

interest
5 2
5 2 N29 6940 72 N29A320
6

9800

Freeport
2 N29 6990 72 N29A288

to the
18 N29 7000 653 N29A4
DATE:

indirectly detrimental
1 N29 7060 37 N29A291

P.T.
UP
2 N29 7140 74 N29A165

of
the property
2 N29 7190 75 N29A289

2 N29 7340 76 N29A319

2 N29 7390 77 N29A290

4000
18 N29 N29A2 @200mm T2
2 N29 7540 78 N29A164

drawing are
directly or
17 N29 N29A3 @200mm T2
BY:

(STAGGER BARS) LIST-U 6 N29 7720 240 N29A321


(S5) (S1) (R1) (R5) (T1) (T6) (U14) (U1)
17 N29 9000 793 N29A3

on this
17 N29 10000 881 N29A5

in any manner
LIST-S LIST-R LIST-T

1785
TOTAL: 5876

The information and know-how


Total for size N29: 5876
No.

used,
9 N29 N29A107 @200mm T2

be
670 4630

they
2500

2000

may
ABBREVIATIONS

nor
TOC - TOP OF CONCRETE
DATE:

BOC - BOTTOM OF CONCRETE


SW - SHORT WAY
COVER LW - LONG WAY
EF - EACH FACE
3150 9000 2000 LAP SCHEDULE: FOUNDATION TYP - TYPICAL

TOP = 75mm CLR - CLEAR

BAR TOP BOTTOM TOP = 120mm (skewed bar) CJ - CONSTRUCTION JOINT


SIZE SIDES = 75mm T - TOP
BY:

BOTTOM = 40mm B - BOTTOM


13mm 1000 770
GBC CRUSHER 23-CR-0603 BOTTOM = 56mm (skewed bar) STG. - STAGGER

16mm 1231 947


CRUSHER FOUNDATION TOP MAT REINFORCEMENT DETAILS 22mm
C603C.2A
2116 1628

25mm
DRAWING REFERENCES.
2405 1850
23270020-GC-O9260049_0
29mm
No.

2795 2150
23270020-GC-O9260050_0

32mm 23270020-GC-O9260051_0
3088 2375
23270020-GC-O9260052_0

LIST-U LIST-V 36mm 3478 2675 23270020-GC-O9260053_0


LIST-S (TYP @ 2 PLCS) LIST-T (TYP @ 2 PLCS)
23270020-GC-O9260054_0
(S1) 2x1 N29 N29A164 @200mm T2 (T1) 2x3 N29 N29A321 @200mm T2 (U1) 1 N29 N29A168 @200mm T2 (V1) 1 N29 N29A19 @200mm T2
2x1 N29 N29A319 @200mm T2 1 N29 N29A169 @200mm T2 1 N29 N29A293 @200mm T2
(T6) 2x3 N29 N29A167 @200mm T2
1 N29 N29A170 @200mm T2 1 N29 N29A294 @200mm T2 ISSUED FOR:
2x1 N29 N29A165 @200mm T2 CONSTRUCTION
2x1 N29 N29A320 @200mm T2 1 N29 N29A171 @200mm T2 1 N29 N29A295 @200mm T2
(S5) 2x1 N29 N29A166 @200mm T2 1 N29 N29A172 @200mm T2 1 N29 N29A296 @200mm T2
1 N29 N29A173 @200mm T2 1 N29 N29A296 @200mm T2
DATE:

1 N29 N29A174 @200mm T2 1 N29 N29A296 @200mm T2 Approved - Date -


1 N29 N29A139 @200mm T2 1 N29 N29A299 @200mm T2 REVISED AS PER REDLINES

LIST-R (TYP @ 2 PLCS) 1 N29 N29A141 @200mm T2 1 N29 N29A300 @200mm T2 Approved (MAIL DT. ON 05.13.22) Date 16 MAY 22
1 N29 N29A322 @200mm T2 1 N29 N29A301 @200mm T2 UNDERGROUND - GBC
REVISED AS PER REDLINES
(R1) 2x1 N29 N29A286 @200mm T2 1 N29 N29A146 @200mm T2 1 N29 N29A302 @200mm T2
Approved (MAIL DT. ON 03.21.22) Date 25 MAR 22 GBC CRUSHER 23-CR-0603
2x1 N29 N29A287 @200mm T2 1 N29 N29A323 @200mm T2 1 N29 N29A303 @200mm T2
2x1 N29 N29A288 @200mm T2 1 N29 N29A324 @200mm T2 1 N29 N29A304 @200mm T2 CRUSHER FOUNDATION REINFORCEMENT DETAILS
2x1 N29 N29A289 @200mm T2 (U14) 1 N29 N29A291 @200mm T2 (V14) 1 N29 N29A305 @200mm T2 Approved FOR APPROVAL Date 06 JAN 22

(R5) 2x1 N29 N29A290 @200mm T2


ARCHITECT: - DRAWN BY: *BD/NNN
ESR No.
-
BY:

LAST EDIT CUSTOMER APPROVAL


- ENGINEER: CHECKED BY: *BD/BKN
-
EDIT DATE
-
FIRE GROUP PROJECT OWNER PROJECT REP 1 PROJECT REP 2 OTHERS SCALE: 1:50 DATE: 06 JAN 22
ALL REINFORCING BARS SNI 2052
GRADE BjTS 520 DEFORMED BARS. - - - - - DWG. NO.
23270020-GC-O9260554 0
- - - - -

No. No. BY: DATE: No. BY: DATE: No. BY: DATE: No. DATE: No. BY: DATE:
No.

You might also like