Professional Documents
Culture Documents
RK - Process Flow 1st Oct
RK - Process Flow 1st Oct
Delivery
Challen &
Invoice
1G
8G 8G 21G 15G 23 G 4G 20 G 20 G 2G
Inventory Store / Purchase QC for Incomng Material Sub - Contracting Random QC In House Machining Product Assembly Seat Leakage Test Painting & Finishing Accessories Mounting Final Calibration & Testing Packaging & Despatch
Incoming Semi-finished Drilling & Hydro Test - Body
Valve (Body + Bonnet + Trim) (Valve Assembly+Actuator) Daily Despatch Plan
Inventory Stock Verifications material. Bonnet. Seat Leakage Test Ready Valves (14G)
Invoice / GRN - Verification & Machining are assembled together. Painted Product Labeling each product Credit / Proforma Invoice
Control Valve - 3" Indent Generation Generate Inspection Report - Hard Facing (Welding M/c) (Valve Assembly+Actuator)
Clearence - (ERP) & Sign on Tuming / Drilling / Milling / Actualtor + Accessories (Paint paremeters updated in a Accessories Mounting Approval.
Body Bonnet Flow Material Vendor PO Body&Bonnet only. CNC - Critical Dimensions
hard copy. Welding Assembly. Register) Packing slip.
Material Inward (ERP) - GRN SC GRN Verification clearence Final Processesed Material -
Processed Material Prepare LR / Eway Bill
(ERP) (Trim).
After QC or
Subcontracting
15 G 23 G 4G 20 G 20 G 14 G 2G
Product Assembly Seat Leakage Test Painting & Finishing Accessories Mounting Final Calibration & Testing Ready Valve Area Packaging & Despatch
Valve Assembly Daily Despatch Plan
Seat Leakage Test
(V10CJNAB 4F2 & Valve (Body + Bonnet + Trim) (Valve Assembly+Actuator) Labeling each product All part mounting & make Credit / Proforma Invoice
(Valve Assembly+Actuator)
1 TACA 20C1F0220) Assembly. Painted Product Accessories Mounting Valve Ready Stoarage Approval.
Processed Material Packing slip.
Prepare LR / Eway Bill
1G 8G 7G 16G 4G 15 G 23 G
Inventory / Purchase QC for Incomng Material Drilling Hydro Manual Painting & Finishing Product Assembly
Q Plan.
Body & Bonnet in Inventory Stock Verifications Valve (Body + Bonnet + Trim)
Invoice / GRN - Verification & (Valve Assembly+Actuator)
Indent Generation Actualtor + Accessories Moved for seat leakage
2 Machine condition Material Vendor PO
Clearence - Sign. Drilling & Tapping Hydro Testing Table Painted Product
Assembly. along with trim.
Generate Inspection Report
Material Inward (ERP) - GRN Processed Material
(ERP)
1G 8G 21 G 9G 15 G
Inventory / Purchase QC for Incomng Material Welding M/c Lathe M/c Product Assembly
Q Plan.
Plug & Seat in Inventory Stock Verifications Valve (Body + Bonnet + Trim)
Invoice / GRN - Verification & Hard Facing (Welding M/c)
Indent Generation Actualtor + Accessories Moved for seat leakage
3 Machined condition Material Vendor PO
Clearence - Sign. 2 M/cs's with different capaity
Assembly. along with Body & Bonet.
Generate Inspection Report
Material Inward (ERP) - GRN Processed Material
(ERP)
1G 8G 3F 11 G
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) CNC
Q Plan.
Locking Ring & Cage Inventory Stock Verifications
Invoice / GRN - Verification & Inward Qty Confirmation (ERP)
Indent Generation Casting code changes. Then
4 Casting Material Vendor PO
Clearence - Sign. Material Requisition Machining.
fixed inside parent part.
Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN
(ERP)
1G 8G 3F 15 G
Body Join / Glant / Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Product Assembly
Glant Packing / Glant Q Plan.
Inventory Stock Verifications Valve (Body + Bonnet + Trim)
Invoice / GRN - Verification & Inward Qty Confirmation (ERP)
Flange / Glant Studs Indent Generation Actualtor + Accessories
5 Clearence - Sign. Material Requisition
and Nuts / Packing Material Vendor PO Assembly.
Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN Processed Material
Spacer / Locking Ring / (ERP)
1G 8G 3F 20 G
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Final Calibration & Testing
Air Filter Regulator Q Plan.
Inventory Stock Verifications
(FPR) Invoice / GRN - Verification & Inward Qty Confirmation (ERP) All part mounting & make
Indent Generation Mounted to the valve & then
6 Bought out Clearence - Sign. Material Requisition Valve Ready
Material Vendor PO moved to 14 G.
Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN
(ERP)
Directly Bought Material
1G 8G 3F 2S 7G
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Lathe M/c Drilling M/C
Pilot Relay Investment Q Plan.
Casting Inventory Stock Verifications
Invoice / GRN - Verification & Inward Qty Confirmation (ERP)
Indent Generation
7 (part of an accessory - Material Vendor PO
Clearence - Sign. Material Requisition Changs to Parent
valve position) Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN
(ERP)
Directly Bought Material
1G 8G 3F 6F
Hex Nut 5/8" / Lower Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Actuator Assembly
Travel stop / Adjusting Q Plan. Part of Actuators assembled in
Inventory Stock Verifications
Invoice / GRN - Verification & Inward Qty Confirmation (ERP) to actuator.
sleeve / Actuator stem Indent Generation
8 Clearence - Sign. Material Requisition Moved to Seat Leakage.
/ Spring cover plate / Material Vendor PO
Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN
Diaform collar / Collar (ERP)
Directly Bought Material
1G 8G 3F 7S
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Valve Positioner Assembly
Bought out items used Q Plan.
Inventory Stock Verifications
for Valve Positioner Invoice / GRN - Verification & Inward Qty Confirmation (ERP) Valve Positioner Assembled
Indent Generation Items Moved to 3F - issue to
9 Assembly Clearence - Sign. Material Requisition and tested accuracy and
Material Vendor PO production
Generate Inspection Report (Body+Bonnet+Trim) performance.
Material Inward (ERP) - GRN
(ERP)
Directly Bought Material
1G 8G 3F
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Sub - Contracting
Bell Crank Lever / Q Plan.
Stroke Lever / Inventory Stock Verifications
Invoice / GRN - Verification & Inward Qty Confirmation (ERP) Machining
Indent Generation
10 Manifold for VP Material Vendor PO
Clearence - Sign. Material Requisition Tuming / Drilling / Milling /
Casting Generate Inspection Report (Body+Bonnet+Trim) Welding
Material Inward (ERP) - GRN
(ERP)
Directly Bought Material
1G 8G 3F 3S
Inventory / Purchase QC for Incomng Material Main Store (1st Floor) Drilling M/c
Q Plan.
Bell Crank Lever / Inventory Stock Verifications
Invoice / GRN - Verification & Inward Qty Confirmation (ERP)
Indent Generation
11 Stroke Lever Material Vendor PO
Clearence - Sign. Material Requisition Drilling & Tapping
Generate Inspection Report (Body+Bonnet+Trim)
Material Inward (ERP) - GRN
(ERP)
1G 8G 4G 6F 8F
Yoke M/C, Spring Inventory / Purchase QC for Incomng Material Painting & Finishing Actuator Assembly Ready Actuators
Tube Assembly, DIAP Q Plan. Part of Actuators assembled in
Inventory Stock Verifications
Invoice / GRN - Verification & (Valve Assembly+Actuator) to actuator.
Case Asmbly, Indent Generation
12 Clearence - Sign. Painted Product Store Ready Actuators
Adjusting NUT, Material Vendor PO
Generate Inspection Report
Material Inward (ERP) - GRN
Covering Plate (ERP)
1G 8G 7G 9G 15 G
Inventory / Purchase QC for Incomng Material Drilling Lathe M/c Product Assembly
Q Plan.
Inventory Stock Verifications Valve (Body + Bonnet + Trim)
Invoice / GRN - Verification &
Cage Indent Generation Actualtor + Accessories
13 Clearence - Sign. Drilling & Tapping 2 M/cs's with different capaity
Material Vendor PO Assembly.
Generate Inspection Report
Material Inward (ERP) - GRN Processed Material
(ERP)
1G 8G 7S
1G 8G 7S 1G 8G 7S
Inventory / Purchase QC for Incomng Material Valve Positioner Assembly Sub - Contracting Inventory / Purchase QC for Incomng Material Valve Positioner Assembly
1G 8G
Body Cast, Norm Bont Inventory / Purchase QC for Incomng Material Sub - Contracting
Cast, Gland INV Q Plan.
Inventory Stock Verifications
Invoice / GRN - Verification & Machining
Casting, Packing Indent Generation
16 Clearence - Sign. Tuming / Drilling / Milling /
Spacer, Round Bar, Material Vendor PO
Generate Inspection Report Welding
Material Inward (ERP) - GRN
Yoke Casting, Spring (ERP)
1G 8G 1G 8G 3S 7S
Inventory / Purchase QC for Incomng Material Sub - Contracting Inventory / Purchase QC for Incomng Material Drilling M/c Valve Positioner Assembly
Q Plan. Q Plan.
Inventory Stock Verifications Inventory Stock Verifications
Cover for VP Invoice / GRN - Verification & Machining Invoice / GRN - Verification & Valve Positioner Assembled
Indent Generation Indent Generation
17 Clearence - Sign. Tuming / Drilling / Milling / Clearence - Sign. Drilling & Tapping and tested accuracy and
Material Vendor PO Material Vendor PO
Generate Inspection Report Welding Generate Inspection Report performance.
Material Inward (ERP) - GRN Material Inward (ERP) - GRN
(ERP) (ERP)
1G 8G 1G 8G 1G 8G 7S
Inventory / Purchase QC for Incomng Material Sub - Contracting Inventory / Purchase QC for Incomng Material Sub - Contracting Inventory / Purchase QC for Incomng Material Valve Positioner Assembly
Q Plan. Q Plan. Q Plan.
Inventory Stock Verifications Inventory Stock Verifications Inventory Stock Verifications
Base Plate for VP Invoice / GRN - Verification & Machining Invoice / GRN - Verification & Machining Invoice / GRN - Verification & Valve Positioner Assembled
Indent Generation Indent Generation Indent Generation
18 Clearence - Sign. Tuming / Drilling / Milling / Clearence - Sign. Tuming / Drilling / Milling / Clearence - Sign. and tested accuracy and
Material Vendor PO Material Vendor PO Material Vendor PO
Generate Inspection Report Welding Generate Inspection Report Welding Generate Inspection Report performance.
Material Inward (ERP) - GRN Material Inward (ERP) - GRN Material Inward (ERP) - GRN
(ERP) (ERP) (ERP)
20G 14G 2G
7S
7S 3F 20G 14G 2G
Valve Positioner Assembly Main Store (1st Floor) Accessories Mounting Final Calibration & Testing Packaging & Despatch
Daily Despatch Plan
Allumenium Bracket Valve Positioner Assembled Inward Qty Confirmation (ERP) Labeling each product Ready Valves Credit / Proforma Invoice
21 and tested accuracy and Material Requisition Accessories Mounting Approval.
performance. (Body+Bonnet+Trim) Packing slip.
Prepare LR / Eway Bill
8F 23 G 4G 20G 14G 2G
Ready Actuators Seat Leakage Test Painting & Finishing Accessories Mounting Final Calibration & Testing Packaging & Despatch
Daily Despatch Plan
Seat Leakage Test
ACT A2 (Valve Assembly+Actuator) Labeling each product Ready Valves Credit / Proforma Invoice
(Valve Assembly+Actuator)
22 Store Ready Actuators Painted Product Accessories Mounting Approval.
Packing slip.
Prepare LR / Eway Bill