Name of the Project :Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G

(Khammam- Vijayawada) from V. Venkatayapalem village at Design Ch. 220.480 Km to Brahmanapalli (K)
village at Design Ch. 250.400 Km (total length 29.920 Km) under other Economic Corridor (NH (O)) programme
on Hybrid Annuity Mode in the State of Telangana (Package - I).

Note for Approval Date-28-02-2024


Details of Fund Requirement for Land Acquistion(CALA/RDO/MRO Authorities)
S.no Designation Fund Requirement Remarks
1 RDO 60000
2 DA 10000
3 DT 10000
4 LA-Section Incharge 15000 CALA+RDO-Khammam
5 Assistant-1 5000
6 Assistant-2 5000
7 Misc (Driver/Clerks etc) 5000
Total 110000
8 MRO 40000
9 RI 15000
10 DT 10000
11 Surveyor 5000 Chintakani MRO Office
12 Clerk 2000
13 SI 10000
Total 82000
14 MRO 40000
15 RI 45000
16 Surveyor 10000
17 Recor Asst 5000 Bonnakal MRO Office
18 DT 5000
19 Misc (Driver/Clerks etc) 2000
Total 107000
Local Police Station
20 ACP 50000
Vandanam & Kodumuru
21 CI 10000
22 CI/SI 10000 Bonakal
Total 70000
NHAI-Team
23 Site Engineer 25000
NHAI
24 Office Asst/Stenographer 10000
Total 35000
Grand Total 404000