SUBMISSION ® &
OF asaya ae
PTS SASED.KUAIR. peo
Contractor ENGINEERING CONSULTANTS
sean KASED KHAIR Esa
Ne Sig Time
Issued by an en :
Contractor AHMED ANANY 1201
tice
Received by ER 23 | os | 22 2 on
ost Sitosal Dito 53 pK Note
gate eet ‘ecient i
‘Work Activity a
ere
NB: Package 1 Only (Package 2 via Aconex)
THE FOLLOWING DOCUMENTS ARE ATTACHED FOR REVIEW
Item Document No: Revision Title Number of
Sheets
1 09 oO ITP PLAN For Excavation
2
a
3
"
3
3
Comments by: ‘Comments by
«Paley fo comments an sy aaced
APPROVAL STATUS
Organisation Name, Sign Date AAWCR
contracor Anak Avy Le 7
Deslener
GARB *
'
ER A lohman Ihess ee soeronf AWE
NAT
ligament rages) Cavers ony
ils SUB Submision of Boumente9 Fev 00 Page To0EENGINEERING CONSULTANTS GROUP s.&
eo ECGHt ARs le
=e = =e
ea Ea ieee pon
ee
L ae ee ee |< vem
: =
calibration certificate in date Manufacturer He)PH! 7 HW | cccord
Recommendation)
ee [pone | eee? |e ea
ee |
e eae ss Me
‘2.1 | Pre-excavation ‘Inspection ] Consultant Site ‘One, HR H | W | Activity Start
line ity Request work Engineer ‘Checklist and
Fie Nava reneavon TOO Page 35@® ECG Mawel fs
ENGINEERING CONSULTANTS GROUP sa.
==-— KASER.AHAIR ase |
[ Document Number: | tsswe Date: TTP Tite; EXCAVATION
“Engineers Representative (ER) to be notified 24 Hours before Inspection Readiness for Hold or Witness
“H= Hold Point = W=Witness Point — R=Record Review
contractor
Verification
‘checkto be
Documents
tox | Workttem eee spec | Clause | Acceptance Crteria Frequency
Contractor
aac
ed
R
Nar
‘and grades to
construct
building
pavements, |
walkways and
roadways
necessary to
construct
walkways and
roadways
Contr
responsibilities
23 | carefully inspection [3.2.7 tarth
| | protect Request work
bench marks, specs
property
comers,
monuments
cor other
Fis Nome P-wrenaton 20a) Page TTSECG Ao Werr fas
ENGINEERING CONSULTANTS GROUP s.a.
Bseea Coes Se
Danae [ieee TP Tas EXCAVATION
Engineers Representative (ER) to be notified 24 Hours before Inspection Readiness for Hold or Witness
10K ‘Work Soe ss cl A Crit Frequenc 2 8lel|s verticaion |
nam | acktabe pec | Ce |accaptanca Cet worn (8/8) 8] 5/5) toca
cE
pce
= = eS A
et specs IN
Fie Name iP excavation doarS
@®
==S-— KASED.MHAIR
ECGui WoW
ENGINEERING CONSULTANTS GROLP s..
a.
‘Document Number:
Issue Date:
ITP Title: EXCAVATION
Engineers Representative (ER) to be notified 24 Hours before Inspection Readiness for Hold or Witness
= Hold Point— W=Witness Point — R=Record Review
contractor Bis
tox workitem cee 5 Clause | Acceptance Crtera | Responsible | Frequen Perse S|. setae
Performes Pee Accent a sae) |e sie Z| documents
Za [incase ofrock it | lnternaliR | 3.2.7 Tank | Contractor Ste One TR [NAD |W
shall be classified | work | responsibilities Engineer R
and.eross specs
sectioned by |
architec.
TE] Rock excavation | Intemnali® [3.27 Tarth | Contractor Site Gnetoreach fH [R [NA DW Tw
includes removal work | responsibilities Engineer | activity fal
ofrock, Rock shall specs
be removed to
lines and sub
grade elevations
ae S BE
ay Sart 85.4 | Documented auality vty Start
commencement | Notice 's09001:2015 | 8's | approvals Engineer For Each ITP H | R |N/A hh w Netlce
Records comolete
32 | Work Execution | Indexed ]
Records complete | records Inspection
signed ssosoon.z0is | 85:4 | Complete Set ofITP | Quality | ror each TP nf afnval| a | w] chectistana
855 Records | Engineer
Approved record
Cleor Copy \
Fie Wome reat OTS TeesGD ECG bers ae
ENGINEERING CONSULTANTS GROUP s.
JSASEDISHANR. . SSS
vonecescm
Tica [iss Dae [ine as ERCAVATION
ae eSNG (ER) is ned ours sore inspec Readiness for Hol or Wines
HE pea Wein: Paint ReRecord Review
conircor a], ,
10x Work!tem Sea Spee Cause | Acceptance Criteria | Responsible Frequency #)$|glels ereatoy
Performed | 3\2 S| decumens
| oe i
35 Sania comple BTS i
woworans| #54 |Gueoaunser [Sl rotane fx fa] # | # |W] oe
referenced work —— record
TP Records | Storage : 1 Taspection
tored in Suitable | Location 1309001:2015 eae ecu ie Gualky For Each ITP HY] R |N/A} H)W Checklist and.
225 | “Teton [Ere
record
maT
Fie ae P- eaaion va Te