This machining center is designed to precision machining. Be careful to transport and store this
machining center. Any improper transportation or storage will cause machine damage and
decrease machine accuracy.
For the detail information related to environment for machine storage and installation, refer to
the item D in Chapter 2.
The actual package size and weight of this machining center will be decided by the machine
models and accessories. Before shipment, please contact your dealer and manufacturer to
confirm the actual package size and weight to plan the loading ability of lifting and transportation
devices.
Weight list as below. Unit: kg
Model Net weight Gross weight with Pallet Gross weight with wooden case
X5-450-UNI 8100 8300 9100
Note: Actual weight is depending on actual package status.
On the packing cases, there are many warning and caution marks, such as “Keep dry”, “This way
up”. When transporting these cases, follow these caution marks to prevent machine damage or
person injury resulted from mis-transportation. The drawing below shows the marks in
transportation. The locations of these marks are depending on the actual packing status.
15
Transportation & storage
D. UNPACKING
Before lifting the machine, make sure the loading capacity of lifting device (crane, hoist, and
forklift) is proper. All the lifting device must be operated by qualified personnel.
16
Transportation & storage
Note:
The fork length has to
exceed the 2/3 of the
machine body.
- Crane
Please use two hanging rings which dia. over 50mm to lift the machine, one put in the
front of base and the other across column, as drawing.
Note: Before machine starting, remove the rings first to prevent machine damage
resulted from machine crash.
17
Transportation & storage
F. LEVEL ADJUSTING
5. Level the machine with 3 jack bolts on the corner and 2 assistant jack bolts.
6. Lock two adjunct jack bolts on the corner
7. Adjust foundation bolt until spirit bubble moves to the center of level gauge.
8. Move the table on X axis direction and level the machine.
9. Move the table on Y axis direction and level the machine.
10. Repeat several times after level adjusting is finished.
11. Set jack bolts with same load.
12. Check and re-adjust the machine level every 6 months.
13. Make sure foundation nuts are fixed firmly.