You are on page 1of 1
Wh of ROC Gator wineut Water Preoting Conceptual Drawing of End Gutter Beam RO. BEAM, RCC. BEAM WATER PROOFING Width of RCC Gutter Without Water Proofing Conceptual Drawing of Center Gutter Beam GENERAL NOTES: RCC Beam/Gutter should be in ine & level Waterproofing work is to be completed by work. Water proofing and Plastering work must not be done on sloping surface of RCC beam. @ Degree co-ofecient/ slope of RCC beam must be mai design standard to avoid undulation in roofing work lex roofing nt before starrting Pr ed as per Proflex um 207 mm.@ + Sleping enath of RCC beam i . ‘exposed reinforcement should be removed from RCC slope beam@ &© Strength of concrat is required more than 20 NVSq, mm. + Quaity of concrete should be checked with hammer test. * RCC slope bean Guttor should be projected minmum 300mm trom outer most face of gable wal, ® f A ein sek | Bare ana Ta ~O o— PROFLEX SYSTEMS sea sane 80 Deere 1 a 3, het Sty, en et ope it~ 04 {TYPICAL LAYOUT AT GUTTER BEAM LEVEL cunt ‘ue slope oo-sffictent shall vary as per the radius of the penet fecirox | = conceptual Gutter Beam Detail ib a eth et be a ey few [=—— [ari mi ed f

You might also like