M/S. SARTHI CONSTRUCTION & INFRA PVT. LTD.

WATER SUPPLY SHHEME ,MORENA,PIN-476001,


SUB: HDPE PIPE ABSTRAC
MRR INVOICE HDPE PIPE-12MTR
SL NO VENDER NAME VEHICLE NO UOM RECD QTY CUM RECD REMARKS
DATE NO NO DATE 110MM 125MM 140MM 160MM 180MM 200MM 225MM 250M 280MM 315MM
1 10/17/2022 1 SANGIR PLASTI SPIN/00295/2223 10/17/2022 RJ01GA6782 MTR 5880 5880 5880
2 10/18/2022 2 SANGIR PLASTI SPIN/00296/2223 10/18/2022 RJ01GB7692 MTR 5400 5400 11280
3 10/18/2022 3 SANGIR PLASTI SPIN/00297/2223 10/18/2022 RJ20GB0777 MTR 2244 1980 1992 6216 17496
4 10/18/2022 4 SANGIR PLASTI SPIN/00298/2223 10/18/2022 RJ48GA5215 MTR 3156 1572 1584 6312 23808
5 10/19/2022 5 SANGIR PLASTI SPIN/00299/2223 10/19/2022 RJ06GC3866 MTR 5928 5928 29736
6 10/20/2022 8 SANGIR PLASTI SPIN/00303/2223 10/20/2022 RJ01GB3585 MTR 2460 816 1884 5160 34896
7 10/21/2022 9 SANGIR PLASTI SPIN/00306/2223 10/21/2022 RJ01GA5308 MTR 5640 5640 40536
8 10/22/2022 10 SANGIR PLASTI SPIN/00308/2223 10/22/2022 RJ01GA7073 MTR 4632 4632 45168
9 10/29/2022 11 SANGIR PLASTI SPIN/00316/2223 10/29/2022 RJ01GA7073 MTR 1948 976 248 276 224 3672 48840
10 11/12/2022 12 SANGIR PLASTI SPIN/05951/2223 11/12/2022 RJO1GA8701 MTR 768 768 768 2304 51144
11 11/13/2022 13 SANGIR PLASTI SPIN/05959/2223 11/13/2022 RJ23GA5231 MTR 828 828 828 2484 53628
12 11/16/2022 14 SANGIR PLASTI SPIN/06026/2223 11/16/2022 GJ15AT2792 MTR 600 600 600 600 2400 56028
13 11/19/2022 15 SANGIR PLASTI SPIN/06124/2223 11/19/2022 GJ15AT2792 MTR 516 600 600 600 2316 58344
14 12/8/2022 16 SANGIR PLASTI SPIN/00361/2223 12/8/2022 RJ01GC6593 MTR 6264 6264 64608
15 12/9/2022 17 SANGIR PLASTI SPIN/00365/2223 12/9/2022 MP09HF2596 MTR 6000 6000 70608
16 12/17/2022 18 SANGIR PLASTI SPIN/00379/2223 12/17/2022 RJO1GA7071 MTR 2556 276 576 1992 180 5580 76188
17 12/31/2022 79 SANGIR PLASTI SPIN/00415/2223 12/31/2022 RJ01GA7073 MTR 532 28 392 644 600 600 2796 78984
18 1/1/2023 80 SANGIR PLASTI SPIN/00414/2223 12/29/2022 MP33H1840 MTR 1369 1369 80353
19 12/19/2022 88 SANGIR PLASTI SPIN/00381/2223 12/19/2022 RJ01GB7514 MTR 2028 84 2004 36 2088 6240 86593
20 12/21/2022 89 SANGIR PLASTI SPIN/00392/2223 12/21/2022 RJ01GA772 MTR 1260 3408 84 4752 91345
21 12/22/2022 90 SANGIR PLASTI SPIN/00396/2223 12/22/2022 MP07GA0181 MTR 1200 1200 92545
22 12/22/2022 91 SANGIR PLASTI SPIN/00397/2223 12/22/2022 MP13H1140 MTR 1200 1200 93745
23 12/22/2022 92 SANGIR PLASTI SPIN/00398/2223 12/22/2022 mp09gf9974 MTR 1190 1190 94935
24 12/22/2022 93 SANGIR PLASTI SPIN/00395/2223 12/22/2022 MP09GE5085 MTR 1200 1200 96135
25 12/22/2022 94 SANGIR PLASTI SPIN/00402/2223 12/22/2022 MP07GA3053 MTR 1200 1200 97335
26 12/22/2022 95 SANGIR PLASTI SPIN/00400/2223 12/22/2022 MP06GA1165 MTR 1228 1228 98563
27 12/23/2022 96 SANGIR PLASTI SPIN/00404/2223 12/23/2022 MP09GE8160 MTR 1024 1024 99587
28 12/25/2022 100 SANGIR PLASTI SPIN/00408/2223 12/25/2022 RJ09GA4518 MTR 384 456 840 1680 101267
29 12/26/2022 101 SANGIR PLASTI SPIN/00409/2223 12/26/2022 RJ09GD3750 MTR 756 756 1512 102779
30 12/28/2022 104 SANGIR PLASTI SPIN/00412/2223 12/28/2022 RJ01GC1375 MTR 300 120 600 4 600 1624 104403
31 10/19/2022 6 SANGIR PLASTI SPIN/00301/2223 10/19/2022 RJ01GB7514 MTR 4368 4368 108771
32 10/20/2022 7 SANGIR PLASTI SPIN/00302/2223 10/20/2022 RJ01GB5699 MTR 2640 2640 5280 114051
33 12/24/2022 98 SANGIR PLASTI SPIN/00405/2223 12/24/2022 RJ01GA7514 MTR 828 2508 828 888 5052 119103
34 12/23/2022 97 SANGIR PLASTI SPIN/07096/2223 12/23/2022 RJ09GA4518 MTR 840 840 119943
35 12/24/2022 99 SANGIR PLASTI SPIN/07147/2223 12/24/2022 RJ09GD3750 MTR 756 756 120699
36 12/26/2022 102 SANGIR PLASTI SPIN/07181/2223 12/26/2022 RJ01GA9568 MTR 4 600 604 121303
37 12/26/2022 103 SANGIR PLASTI SPIN/07157/2223 12/26/2022 RJ01GC1375 MTR 600 600 121903
38 12/12/2022 106 SANGIR PLASTI SPIN/00368/2223 12/12/2022 RJ01GA7073 MTR 6108 6108 128011
39 12/22/2022 107 SANGIR PLASTI SPIN/00394/2223 12/12/2022 MP09GF3393 MTR 1189 1189 129200
40 12/22/2022 108 SANGIR PLASTI SPIN/00401/2223 12/12/2022 MP07GA0508 MTR 1200 1200 130400
41 12/18/2022 105 SANGIR PLASTI SPIN/00380/2223 12/18/2022 RJ01GC6592 MTR 756 1920 2668 5344 135744
42 3/21/2023 130 SANGIR PLASTI SPIN/00632/2223 3/17/2023 RJ06GA5306 MTR 300 1248 300 1248 300 3396 139140

Page 1 of 29
M/S. SARTHI CONSTRUCTION & INFRA PVT. LTD.
WATER SUPPLY SHHEME ,MORENA,PIN-476001,
SUB: HDPE PIPE ABSTRAC
MRR INVOICE HDPE PIPE-12MTR
SL NO VENDER NAME VEHICLE NO UOM RECD QTY CUM RECD REMARKS
DATE NO NO DATE 110MM 125MM 140MM 160MM 180MM 200MM 225MM 250M 280MM 315MM
43 3/21/2023 131 SANGIR PLASTI SPIN/00634/2223 3/18/2023 GJ12BW0074 MTR 108 48 1056 1296 2508 141648
44 3/23/2023 132 SANGIR PLASTI SPIN/00642/2223 3/20/2023 RJ01GA8975 MTR 1596 240 1596 360 3792 145440
45 3/23/2023 133 SANGIR PLASTI SPIN/00643/2223 3/21/2023 RJ01GB8243 MTR 288 2124 288 216 216 3132 148572
46 3/27/2023 112 SANGIR PLASTI SPPL/09822/2223 3/23/2023 RJ09GB2290 MTR 660 660 149232
47 3/27/2023 113 SANGIR PLASTI SPIN/00654/2223 3/24/2023 RJ09GB2290 MTR 660 0 660 660 1980 151212
48 3/27/2023 114 SANGIR PLASTI SPPL/09855/2223 3/24/2023 RJ09GB4078 MTR 660 660 151872
49 3/27/2023 115 SANGIR PLASTI SPIN/00658/2223 3/25/2023 RN09GB4078 MTR 516 144 516 144 516 144 1980 153852
50 3/28/2023 116 SANGIR PLASTI SPPL/09740/2223 3/21/2023 RJ09GB4078 MTR 852 852 154704
51 3/28/2023 117 SANGIR PLASTI SPIN/00653/2223 3/24/2023 RJ01GC6111 MTR 228 120 384 768 1500 156204
52 3/29/2023 118 SANGIR PLASTI SPIN/00659/2223 3/26/2023 RJ01GC6111 MTR 36 264 516 660 1476 157680
53 3/29/2023 119 SANGIR PLASTI SPPL/09852/2223 3/24/2023 RJ01GC6111 MTR 660 660 158340
54 3/29/2023 120 SANGIR PLASTI SPIN/00664/2223 3/27/2023 RJ01GA7008 MTR 84 468 588 588 1728 160068
55 3/29/2023 121 SANGIR PLASTI SPPL/09858/2223 3/24/2023 RJ01GA7008 MTR 588 588 160656
56 3/29/2023 122 SANGIR PLASTI SPPL/09851/2223 3/24/2023 RJ09GC6031 MTR 660 660 161316
57 3/29/2023 123 SANGIR PLASTI SPIN/00665/2223 3/27/2023 RJ09GC6031 MTR 336 504 660 0 1500 162816
58 3/30/2023 124 SANGIR PLASTI SPPL/09899/2223 3/25/2023 RJ01GC1199 MTR 588 588 163404
59 3/30/2023 125 SANGIR PLASTI SPIN/00667/2223 3/28/2023 RJ01GC1199 MTR 288 72 468 588 1416 164820
60 3/30/2023 126 SANGIR PLASTI SPPL/09896/2223 3/25/2023 RJ09GB9214 MTR 768 768 165588
61 3/30/2023 127 SANGIR PLASTI SPIN/00666/2223 3/28/2023 RJ09GB9214 MTR 48 48 706 768 1570 167158
62 3/30/2023 128 SANGIR PLASTI SPPL/09909/2223 3/26/2023 RJ01GB4568 MTR 84 504 588 167746
63 3/30/2023 129 SANGIR PLASTI SPIN/00668/2223 3/29/2023 RJ01GB4568 MTR 48 134 96 156 384 818 168564
64 3/31/2023 134 SANGIR PLASTI SPIN/00671/2223 3/30/2023 MP09GE9500 MTR 1400 1400 169964
65 3/31/2023 135 SANGIR PLASTI SPIN/00670/2223 3/30/2023 MP09GF4203 MTR 1389 1389 171353
66 3/31/2023 136 SANGIR PLASTI SPIN/00669/2223 3/29/2023 RJ01GA7073 MTR 2640 2340 4980 176333
67 4/1/2023 137 SANGIR PLASTI SPIN/00675/2223 3/30/2023 MP09GF1950 MTR 1400 1400 177733
68 4/2/2023 138 SANGIR PLASTI SPIN/00678/2223 3/31/2023 MP09GH4717 MTR 1400 1400 179133
69 4/27/2023 142 SANGIR PLASTI SPIN/00025/2324 4/26/2023 RJ01GA7073 MTR 5996 5996 185129
70 4/28/2023 143 SANGIR PLASTI SPIN/00029/2324 4/26/2023 RJ01GB6518 MTR 1836 876 12 948 970 4642 189771
71 4/28/2023 144 SANGIR PLASTI SPIN/00026/2324 4/26/2023 RJ01GB7270 MTR 1236 1272 1267 3775 193546
72 4/29/2023 145 SANGIR PLASTI SPIN/00033/2324 4/27/2023 RJ09GA7096 MTR 5550 5550 199096
73 4/30/2023 146 SANGIR PLASTI SPIN/00034/2324 4/28/2023 RJ48GA0615 MTR 1068 1068 1068 3204 202300
74 5/1/2023 147 SANGIR PLASTI SPIN/00036/2324 4/29/2023 MH40AK5752 MTR 1080 1080 1080 3240 205540
75 5/1/2023 148 SANGIR PLASTI SPIN/00037/2324 4/29/2023 RJ46GA4303 MTR 3684 156 156 156 180 129 192 4653 210193
76 5/13/2023 150 SANGIR PLASTI SPIN/00070/2324 5/13/2023 RJ01GA7073 MTR 4294 132 24 24 12 34 4520 214713
77 6/18/2023 180 SANGIR PLASTI SPPL/02371/2324 6/14/2023 RJ01GA8701 MTR 660 660 215373
78 6/18/2023 180 SANGIR PLASTI SPIN/00162/2324 6/16/2023 RJ01GA8701 MTR 660 660 660 1980 217353
79 6/19/2023 181 SANGIR PLASTI SPPL/02424/2324 6/15/2023 GJ15AT5547 MTR 660 660 218013
80 6/19/2023 181 SANGIR PLASTI SPIN/00163/2324 6/17/2023 GJ15AT5547 MTR 12 648 12 648 660 1980 219993
81 6/21/2023 184 SANGIR PLASTI SPPL/02408/2324 6/15/2023 RJ01GB6527 MTR 660 660 220653
82 6/21/2023 184 SANGIR PLASTI SPIN/00164/2324 6/18/2023 RJ01GB6527 MTR 360 300 336 324 432 227 1979 222632
83 6/22/2023 185 SANGIR PLASTI SPPL/02506/2324 6/17/2023 RJ01GB6527 MTR 840 840 223472
84 6/22/2023 185 SANGIR PLASTI SPIN/00168/2324 6/19/2023 RJ01GB6527 MTR 708 132 684 156 540 2220 225692

Page 2 of 29
M/S. SARTHI CONSTRUCTION & INFRA PVT. LTD.
WATER SUPPLY SHHEME ,MORENA,PIN-476001,
SUB: HDPE PIPE ABSTRAC
MRR INVOICE HDPE PIPE-12MTR
SL NO VENDER NAME VEHICLE NO UOM RECD QTY CUM RECD REMARKS
DATE NO NO DATE 110MM 125MM 140MM 160MM 180MM 200MM 225MM 250M 280MM 315MM
85 6/22/2023 186 ASM INDUSTRI 2023-24/117 6/21/2023 HR73B1116 MTR 1016 1016 226708
86 6/22/2023 187 ASM INDUSTRI 2023-24/117 6/21/2023 HR73B5480 MTR 1000 1000 227708
87 6/24/2023 188 SANGIR PLASTI SPPL/02591/2324 6/20/2023 RJ01GB4568 MTR 840 840 228548
88 6/24/2023 188 SANGIR PLASTI SPIN/00180/2324 6/22/2023 RJ01GB4568 MTR 696 840 840 2376 230924
89 6/29/2023 189 SANGIR PLASTI SPIN/00181/2324 6/27/2023 RJ01GB4568 MTR 1644 1644 1248 396 4932 235856
90 6/30/2023 190 SANGIR PLASTI SPIN/00187/2324 6/28/2023 MP07GA3136 MTR 1233 1233 237089
91 6/30/2023 191 SANGIR PLASTI SPIN/00183/2324 6/28/2023 MP07GA0508 MTR 1394 1394 238483
92 6/30/2023 192 SANGIR PLASTI SPIN/00185/2324 6/28/2023 MP07GA2238 MTR 1306 1306 239789
93 6/30/2023 192 SANGIR PLASTI SPIN/00184/2324 6/28/2023 MP07GB0449 MTR 1384 1384 241173
94 7/1/2023 193 SANGIR PLASTI SPIN/00189/2324 6/29/2023 RJ14GC9584 MTR 2628 648 732 96 636 4740 245913
95 7/3/2023 194 SANGIR PLASTI SPIN/00190/2324 6/30/2023 RJ01GA6668 MTR 3012 444 684 144 540 4824 250737
96 7/3/2023 195 SANGIR PLASTI SPIN/00194/2324 6/30/2023 RJ47GA1072 MTR 3360 684 684 4728 255465
97 7/10/2023 196 SANGIR PLASTI SPIN/00213/2324 7/6/2023 MH06AQ6184 MTR 4272 1524 264 6060 261525
98 7/10/2023 197 SANGIR PLASTI SPIN/00203/2324 7/5/2023 RJ01GA7073 MTR 4476 360 384 5220 266745
99 7/12/2023 199 SANGIR PLASTI SPIN/00214/2324 5/2/2023 UP53DT9786 MTR 4548 1664 6212 272957
100 7/22/2023 200 SANGIR PLASTI SPIN/00269/2324 7/21/2023 MP33H1840 MTR 411 411 273368
101 7/22/2023 201 SANGIR PLASTI SPIN/00270/2324 7/21/2023 MP33H1840 MTR 279 279 273647
102 7/22/2023 202 SANGIR PLASTI SPPL/03521/2324 7/22/2023 RJ01GC1970 MTR 331 81 412 274059
103 7/24/2023 203 SANGIR PLASTI SPIN/00283/2324 7/25/2023 RJ01GC1970 MTR 1704 488 179 245 42 131 62 2851 276910
104 9/24/2023 1066 SANGIR PLASTI SPIN/00478/2324 9/20/2023 MTR 1285 1285 278195
105 10/1/2023 1140 SANGIR PLASTI SPIN/00519/2324 9/29/2023 MTR 1400 1400 279595
106 10/1/2023 1141 SANGIR PLASTI SPIN/00530/2324 9/30/2023 MTR 1365 1365 280960
107 10/1/2023 1142 SANGIR PLASTI SPIN/00531/2324 9/30/2023 MTR 1385 1385 282345
108 10/1/2023 1147 SANGIR PLASTI SPIN/00526/2324 9/29/2023 MTR 1400 1400 283745
109 10/1/2023 1148 SANGIR PLASTI SPIN/00521/2324 9/29/2023 MTR 1415 1415 285160
110 10/1/2023 1149 SANGIR PLASTI SPIN/00522/2324 9/29/2023 MTR 1400 1400 286560
111 10/1/2023 1150 SANGIR PLASTI SPIN/00523/2324 9/29/2023 MTR 1403 1403 287963
112 10/1/2023 1151 SANGIR PLASTI SPIN/00520/2324 9/29/2023 MTR 1376 1376 289339
113 10/8/2023 1199 SANGIR PLASTI SPIN/00535/2324 10/3/2023 MTR 1400 1400 290739
114 10/14/2023 1253 SANGIR PLASTI SPIN/00546/2324 10/9/2023 MTR 1400 1400 292139
115 10/26/2023 1406 SANGIR PLASTI SPIN/00549/2324 10/10/2023 MTR 1405 1405 293544
116 10/26/2023 1407 SANGIR PLASTI SPIN/00550/2324 10/10/2023 MTR 1336 1336 294880
117 10/26/2023 1408 SANGIR PLASTI SPIN/00551/2324 10/10/2023 MTR 1402 1402 296282
118 10/26/2023 1409 SANGIR PLASTI SPIN/00552/2324 10/11/2023 MTR 1400 1400 297682
119 10/26/2023 1410 SANGIR PLASTI SPIN/00553/2324 10/11/2023 MTR 1399 1399 299081
120 10/26/2023 1411 SANGIR PLASTI SPIN/00554/2324 10/11/2023 MTR 1391 1391 300472
121 10/26/2023 1412 SANGIR PLASTI SPIN/00555/2324 10/11/2023 MTR 1390 1390 301862
122 10/26/2023 1413 SANGIR PLASTI SPIN/00556/2324 10/11/2023 MTR 1400 1400 303262
123 10/26/2023 1414 SANGIR PLASTI SPIN/00557/2324 10/12/2023 MTR 1344 1344 304606
124 10/26/2023 1415 SANGIR PLASTI SPIN/00558/2324 10/12/2023 MTR 1329 1329 305935
125 10/26/2023 1416 SANGIR PLASTI SPIN/00545/2324 10/9/2023 MTR 1400 1400 307335
126 10/26/2023 1417 SANGIR PLASTI SPIN/00544/2324 10/9/2023 MTR 1400 1400 308735

Page 3 of 29
M/S. SARTHI CONSTRUCTION & INFRA PVT. LTD.
WATER SUPPLY SHHEME ,MORENA,PIN-476001,
SUB: HDPE PIPE ABSTRAC
MRR INVOICE HDPE PIPE-12MTR
SL NO VENDER NAME VEHICLE NO UOM RECD QTY CUM RECD REMARKS
DATE NO NO DATE 110MM 125MM 140MM 160MM 180MM 200MM 225MM 250M 280MM 315MM
127 10/26/2023 1418 SANGIR PLASTI SPIN/00561/2324 10/14/2023 MTR 1018 1018 309753
128 10/28/2023 1433 SANGIR PLASTI SPIN/00582/2324 10/26/2023 MTR 1342 1342 311095
129 1/2/2024 1886 SANGIR PLASTI SPIN/00797/2324 12/30/2023 531 MTR 6372 6372 317467
130 1/2/2024 1887 SANGIR PLASTI SPIN/00799/2324 12/30/2023 530 MTR 6360 6360 323827
131 1/2/2024 1888 SANGIR PLASTI SPIN/00800/2324 12/30/2023 530 MTR 6360 6360 330187
132 1/3/2024 206 SANGIR PLASTI SPIN/00810/2324 12/31/2023 MTR 1400 1400 331587
133 1/3/2024 207 SANGIR PLASTI SPIN/00814/2324 1/1/2024 MTR 1400 1400 332987
134 1/4/2024 208 SANGIR PLASTI SPIN/00808/2324 12/31/2023 MTR 1380 1380 334367
135 1/5/2024 209 SANGIR PLASTI SPIN/00821/2324 1/3/2024 MTR 815 815 335182
136 1/5/2024 210 SANGIR PLASTI SPIN/00822/2324 1/3/2024 MTR 566 566 335748
137 1/5/2024 211 SANGIR PLASTI SPIN/00824/2324 1/3/2024 MTR 1395 1395 337143
138 1/5/2024 212 SANGIR PLASTI SPIN/00825/2324 1/3/2024 MTR 1396 1396 338539
139 1/6/2024 213 SANGIR PLASTI SPIN/00804/2324 12/31/2023 MTR 1402 1402 339941
140 2/11/2024 217 SANGIR PLASTI SPIN/00942/2324 2/10/2024 MTR 1400 1400 341341
141 2/11/2024 218 SANGIR PLASTI SPIN/00946/2324 2/10/2024 MTR 1358 1358 342699
142 2/12/2024 219 SANGIR PLASTI SPIN/00943/2324 2/10/2024 MTR 1402 1402 344101
143 2/12/2024 220 SANGIR PLASTI SPIN/00945/2324 2/10/2024 MTR 1400 1400 345501
144 2/13/2024 221 SANGIR PLASTI SPIN/00950/2324 2/12/2024 MTR 1398 1398 346899
145 2/13/2024 222 SANGIR PLASTI SPIN/00952/2324 2/12/2024 MTR 1400 1400 348299
146 2/14/2024 223 SANGIR PLASTI SPIN/00951/2324 2/12/2024 MTR 1401 1401 349700
147 2/14/2024 224 SANGIR PLASTI SPIN/00953/2324 2/12/2024 MTR 1304 1304 351004
148 2/14/2024 225 SANGIR PLASTI SPIN/00964/2324 2/13/2024 MTR 1336 1336 352340
149 2/17/2024 226 SANGIR PLASTI SPIN/00980/2324 2/16/2024 MTR 1400 1400 353740
150 2/17/2024 227 SANGIR PLASTI SPIN/00981/2324 2/16/2024 MTR 1371 1371 355111
151 2/18/2024 228 SANGIR PLASTI SPIN/00997/2324 2/17/2024 MTR 1291 1291 356402
152 2/19/2024 229 SANGIR PLASTI SPIN/00998/2324 2/17/2024 MTR 1425 1425 357827
153 2/19/2024 230 SANGIR PLASTI SPIN/00982/2324 2/16/2024 MTR 1307 1307 359134
154 2/19/2024 231 SANGIR PLASTI SPIN/00999/2324 2/17/2024 MTR 1283 1283 360417
155 2/19/2024 232 SANGIR PLASTI SPIN/01000/2324 2/17/2024 MTR 1330 1330 361747
156 2/20/2024 233 SANGIR PLASTI SPIN/01007/2324 2/19/2024 MTR 1380 1380 363127
157 2/20/2024 234 SANGIR PLASTI SPIN/01008/2324 2/19/2024 MTR 1230 1230 364357
158 2/20/2024 235 SANGIR PLASTI SPIN/01009/2324 2/19/2024 MTR 1400 1400 365757
159 2/28/2024 237 SANGIR PLASTI SPIN/01025/2324 2/26/2024 MTR 1061 1061 366818
160 2/28/2024 238 SANGIR PLASTI SPIN/01026/2324 2/26/2024 MTR 76 76 366894
161 2/28/2024 239 SANGIR PLASTI SPIN/01027/2324 2/26/2024 MTR 1237 1237 368131
162 3/3/2024 242 SANGIR PLASTI SPIN/01038/2324 2/29/2024 MTR 1400 1400 369531
163 3/4/2024 243 SANGIR PLASTI SPIN/01043/2324 3/1/2024 MTR 1400 1400 370931
164 3/10/2024 244 SANGIR PLASTI SPIN/01057/2324 3/9/2024 MTR 1299 1299 372230
165 3/11/2024 245 SANGIR PLASTI SPIN/01059/2324 3/9/2024 MTR 1400 1400 373630
166 3/11/2024 246 SANGIR PLASTI SPIN/01060/2324 3/9/2024 MTR 1384 1384 375014
167 3/12/2024 247 SANGIR PLASTI SPIN/01054/2324 3/8/2024 MTR 1400 1400 376414
168 3/12/2024 248 SANGIR PLASTI SPIN/01061/2324 3/11/2024 MTR 1223 1223 377637

Page 4 of 29
M/S. SARTHI CONSTRUCTION & INFRA PVT. LTD.
WATER SUPPLY SHHEME ,MORENA,PIN-476001,
SUB: HDPE PIPE ABSTRAC
MRR INVOICE HDPE PIPE-12MTR
SL NO VENDER NAME VEHICLE NO UOM RECD QTY CUM RECD REMARKS
DATE NO NO DATE 110MM 125MM 140MM 160MM 180MM 200MM 225MM 250M 280MM 315MM
169 3/12/2024 249 SANGIR PLASTI SPIN/01062/2324 3/11/2024 MTR 173 173 377810
170 3/13/2024 250 SANGIR PLASTI SPIN/01055/2324 3/8/2024 MTR 1400 1400 379210
171 3/13/2024 251 SANGIR PLASTI SPIN/01064/2324 3/11/2024 MTR 1268 1268 380478
172 3/13/2024 252 SANGIR PLASTI SPIN/01065/2324 3/12/2024 MTR 1389 1389 381867
173 3/13/2024 253 SANGIR PLASTI SPIN/01066/2324 3/12/2024 MTR 1328 1328 383195
174 3/13/2024 254 SANGIR PLASTI SPIN/01069/2324 3/12/2024 MTR 1343 1343 384538
175 3/13/2024 255 SANGIR PLASTI SPIN/01070/2324 3/12/2024 MTR 1396 1396 385934

TOTAL HDPE PIPE RECEIVED AS ON 24/01/2024 :- MTR 250408 24940 20351 22137 17542 10979 16758 6539 7499 8781 385934

Page 5 of 29
SARTHI CONSTRUCTION
WATER SUPPLY SCHEME(AMRUT) PROJECT -MORENA

MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 161.00 1932
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 1.33 16 HDPE PIPE 110MM 8M
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 3 HDPE PIPE 125MM-12MTR MTR 0.33 4 HDPE PIPE 125MM 4M
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 4 HDPE PIPE 125MM-12MTR MTR 81.00 972 HDPE PIPE 125MM-12
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 5 HDPE PIPE 140MM-12MTR MTR 20.00 240 HDPE PIPE 140MM-12
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 6 HDPE PIPE 140MM-12MTR MTR 0.67 8 HDPE PIPE 140MM-8M
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 7 HDPE PIPE 160MM-12MTR MTR 16.00 192 HDPE PIPE 160MM-12
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 8 HDPE PIPE 160MM-12MTR MTR 3.50 42 HDPE PIPE 160MM -7M
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 9 HDPE PIPE 160MM-12MTR MTR 1.75 21 HDPE PIPE 160MM -10
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 10 HDPE PIPE 160MM-12MTR MTR 0.79 9.5 HDPE PIPE 160MM 9.5
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 11 HDPE PIPE 160MM-12MTR MTR 0.42 5 HDPE PIPE 160MM 5M
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 12 HDPE PIPE 160MM-12MTR MTR 0.54 6.5 HDPE PIPE 160MM 6.5
10/31/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 13 HDPE PIPE 180MM-12MTR MTR 18.67 224 11MTR-01,10MTR-01,0
11/5/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/6/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 4 HDPE PIPE 125MM-12MTR MTR 20.00 240
11/6/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 5 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/7/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/7/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
11/8/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/8/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/10/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
11/10/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 5.00 60
11/11/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/11/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 5.00 60
11/11/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 2.00 24
11/11/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 140MM-12MTR MTR 10.00 120
11/12/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
11/13/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 10.00 120
11/13/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 10.00 120
11/13/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 10.00 120
11/13/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/14/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/15/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/17/2022 N/A PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/16/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
11/17/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/17/2022 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 125MM-12MTR MTR 7.00 84
11/17/2022 N/A PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 160MM-12MTR MTR 10.00 120

Page 6 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

11/18/2022 51 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 16.00 192
11/18/2022 51 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/18/2022 52 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/18/2022 54 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 160MM-12MTR MTR 10.00 120
11/19/2022 56 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 160MM-12MTR MTR 20.00 240
11/19/2022 57 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 42.00 504
11/20/2022 58 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/20/2022 58 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 125MM-12MTR MTR 10.00 120
11/20/2022 59 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/21/2022 60 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 160MM-12MTR MTR 16.00 192
11/21/2022 60 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/21/2022 61 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 125MM-12MTR MTR 20.00 240
11/21/2022 62 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/22/2022 63 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/22/2022 64 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/22/2022 65 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/23/2022 66 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
11/23/2022 67 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 10.00 120
11/24/2022 68 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/24/2022 69 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 4.00 48
11/24/2022 69 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/24/2022 70 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
11/24/2022 70 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 125MM-12MTR MTR 3.00 36
11/24/2022 70 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 3 HDPE PIPE 140MM-12MTR MTR 3.00 36
11/25/2022 71 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/25/2022 72 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 4.00 48
11/25/2022 72 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 125MM-12MTR MTR 20.00 240
11/25/2022 72 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 3 HDPE PIPE 110MM-12MTR MTR 6.00 72
11/25/2022 73 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 125MM-12MTR MTR 10.00 120
11/25/2022 73 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/26/2022 74 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
11/27/2022 75 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
11/27/2022 76 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 15.00 180
11/27/2022 77 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/28/2022 78 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/28/2022 79 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 17.00 204
11/29/2022 80 PROJECT R.K. INFRA CONTRACTER NANDE KA PURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
11/29/2022 81 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/29/2022 82 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
11/30/2022 83 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
11/30/2022 83 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 180MM-12MTR MTR 10.00 120
11/30/2022 84 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240

Page 7 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

11/30/2022 85 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 180MM-12MTR MTR 12.00 144
12/1/2022 86 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 180MM-12MTR MTR 22.00 264
12/1/2022 87 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
12/1/2022 88 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
12/1/2022 88 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 5.00 60
12/2/2022 89 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 125MM-12MTR MTR 6.00 72
12/2/2022 89 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 14.00 168
12/3/2022 90 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
12/3/2022 91 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 160MM-12MTR MTR 15.00 180
12/3/2022 92 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 125MM-12MTR MTR 15.00 180
12/4/2022 94 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/4/2022 95 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/5/2022 99 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/5/2022 100 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 8.00 96
12/5/2022 301 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/6/2022 302 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
12/6/2022 306 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
12/7/2022 307 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
12/7/2022 308 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 12.00 144
12/7/2022 308 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 3.00 36
12/7/2022 310 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
12/8/2022 311 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 5.00 60
12/8/2022 311 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 125MM-12MTR MTR 1.00 12
12/8/2022 311 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 3 HDPE PIPE 160MM-12MTR MTR 6.00 72
12/8/2022 313 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/9/2022 314 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
12/9/2022 315 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/9/2022 316 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/9/2022 316 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
12/10/2022 318 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/10/2022 320 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 6.00 72
12/10/2022 320 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 4.00 48
12/10/2022 321 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
12/11/2022 322 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
12/11/2022 323 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/12/2022 324 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/12/2022 325 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
12/13/2022 326 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/13/2022 327 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 5.00 60
12/13/2022 327 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 125MM-12MTR MTR 10.00 120
12/13/2022 328 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
12/14/2022 329 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240

Page 8 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

12/14/2022 330 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 110MM-12MTR MTR 9.00 108
12/14/2022 330 PROJECT R.K. INFRA CONTRACTER BICHALI ROAD 1 HDPE PIPE 125MM-12MTR MTR 7.00 84
12/14/2022 331 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/14/2022 332 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/15/2022 333 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 20.00 240
12/17/2022 335 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/17/2022 336 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 6.00 72
12/17/2022 336 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 200MM-12MTR MTR 18.00 216
12/17/2022 337 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/17/2022 338 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 5.00 60
12/17/2022 338 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
12/18/2022 340 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 180MM-12MTR MTR 18.00 216
12/18/2022 340 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 160MM-12MTR MTR 22.00 264
12/18/2022 340 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 200MM-12MTR MTR 1.00 12
12/19/2022 341 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
12/19/2022 341 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 225MM-12MTR MTR 13.00 156
12/19/2022 342 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/19/2022 343 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/20/2022 344 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/20/2022 345 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 225MM-12MTR MTR 30.00 360
12/22/2022 346 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/22/2022 347 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 125MM-12MTR MTR 40.00 480
12/23/2022 348 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/23/2022 348 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 14.00 168
12/23/2022 349 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 5.00 60
12/24/2022 350 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 7.00 84
12/24/2022 501 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 280MM-12MTR MTR 15.00 180
12/24/2022 501 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 225MM-12MTR MTR 2.00 24
12/24/2022 501 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 3 HDPE PIPE 280MM-12MTR MTR 15.00 180
12/24/2022 502 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/25/2022 503 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 16.00 192
12/25/2022 504 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
12/26/2022 505 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 17.00 204
12/26/2022 506 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 280MM-12MTR MTR 17.00 204
12/27/2022 507 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
12/27/2022 508 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 280MM-12MTR MTR 8.00 96
12/27/2022 508 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 30.00 360
12/27/2022 508 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 3 HDPE PIPE 225MM-12MTR MTR 10.00 120
12/28/2022 509 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/28/2022 510 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 1.00 12
12/28/2022 510 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 125MM-12MTR MTR 6.00 72
12/28/2022 511 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 22.00 264

Page 9 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

12/29/2022 512 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
12/29/2022 513 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 225MM-12MTR MTR 20.00 240
12/29/2022 513 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 60.00 720
12/29/2022 513 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 3 HDPE PIPE 125MM-12MTR MTR 5.00 60
12/29/2022 514 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 9.00 108
12/30/2022 516 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 17.00 204
12/30/2022 516 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 5 HDPE PIPE 110MM-12MTR MTR 9.00 108
12/30/2022 517 PROJECT JEETU CONTRACTER CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 15.00 180
12/30/2022 518 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/2/2023 520/3107 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 28.00 336
1/2/2023 521/3106 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
2 HDPE PIPE 125MM-12MTR MTR 40.00 480
1/2/2023 522/3001 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/3/2023 523/3108 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
3 HDPE PIPE 110MM-12MTR MTR 16.00 192
1/3/2023 524/3109 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 10.00 120
1/3/2023 524/3109 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 13.00 156
1/4/2023 524/3112 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 13.00 156
1/3/2023 525/3002 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/3/2023 526/3003 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/4/2023 526/3005 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
1/4/2023 527/3111 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/5/2023 528/3113 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 140MM-12MTR MTR 7.00 84
1/5/2023 528/3113 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 140MM-12MTR MTR 22.00 264
1/5/2023 529/3114 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 160MM-12MTR NO 16.00 192
1/5/2023 529/3114 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
2 HDPE PIPE 110MM-12MTR NO 24.00 288
1/6/2023 530/3115 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 225MM-12MTR MTR 12.00 144
1/6/2023 530/3115 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 180MM-12MTR MTR 3.00 36
1/6/2023 531/3006 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 140MM-12MTR MTR 11.00 132
1/6/2023 531/3006 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 2 HDPE PIPE 125MM-12MTR MTR 8.00 96
1/6/2023 531/3006 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 8 HDPE PIPE 110MM-12MTR MTR 10.00 120
1/7/2023 532/3007 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/7/2023 533/3117 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/8/2023 534/3008 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTERZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/8/2023 535/3118 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 250MM-12MTR MTR 22.00 264
1/9/2023 537/3120 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/9/2023 538/3121 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/10/2023 540/3122 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/11/2023 541/3123 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 3.00 36
1/11/2023 541/3123 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 140MM-12MTR MTR 33.00 396
1/11/2023 541/3123 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 7 HDPE PIPE 110MM-12MTR MTR 19.00 228
1/11/2023 542/3125 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/11/2023 543 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
1/12/2023 544/3126 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 20.00 240

Page 10 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

1/12/2023 544/3126 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 140MM-12MTR MTR 8.00 96
1/13/2023 546/3128 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 34.00 408
1/13/2023 546/3128 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
2 HDPE PIPE 125MM-12MTR MTR 6.00 72
1/13/2023 545/3127 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 110MM-12MTR MTR 41.00 492
1/15/2023 547/3129 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/15/2023 547/3129 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 2 HDPE PIPE 125MM-12MTR MTR 12.00 144
1/16/2023 549/3131 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 4 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/16/2023 549/3131 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 5 HDPE PIPE 125MM-12MTR MTR 7.00 84
1/16/2023 550/3140 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 125MM-12MTR MTR 9.00 108
1/16/2023 548/3014 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/17/2023 451/3141 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/17/2023 452/3015 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 55.00 660
1/17/2023 453/3133 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 1 HDPE PIPE 125MM-12MTR MTR 22.00 264
1/17/2023 453/3133 PROJECT BANKE BIHARI INTERPRISES CONTRACTER MUNSI KA BAAG 2 HDPE PIPE 110MM-12MTR MTR 6.00 72
1/18/2023 455/3016 PROJECT CHANCHAL CONTRUCTION CONTRACTER EMILIYA ROAD 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/18/2023 456/3011 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 15.00 180
1/18/2023 454/3134 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
1/19/2023 458/3135 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/19/2023 457/3013 PROJECT JMK CONSTRUCTION CONTRACTER SYADD 1 HDPE PIPE 280MM-12MTR MTR 12.00 144
1/19/2023 457/3013 PROJECT JMK CONSTRUCTION CONTRACTER SYADD 2 HDPE PIPE 280MM-12MTR MTR 12.00 144
1/20/2023 459/3137 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 225MM-12MTR MTR 9.00 108
1/20/2023 459/3137 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
2 HDPE PIPE 200MM-12MTR MTR 9.00 108
1/20/2023 459/3137 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
3 HDPE PIPE 180MM-12MTR MTR 9.00 108
1/20/2023 459/3137 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
4 HDPE PIPE 110MM-12MTR MTR 3.00 36
1/20/2023 461/3021 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
1/20/2023 460/3139 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 48.00 576
1/21/2023 465/3024 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
1/21/2023 462/3022 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 62.00 744
1/21/2023 463/3134 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/22/2023 464/3023 PROJECT CHANCHAL CONTRUCTION CONTRACTER EMILIYA ROAD 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/22/2023 466/3145 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 46.00 552
1/22/2023 466/3145 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 140MM-12MTR MTR 6.00 72
1/22/2023 467/3018 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
1/22/2023 470/3144 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
1 HDPE PIPE 180MM-12MTR MTR 12.00 144
1/22/2023 470/3144 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
2 HDPE PIPE 160MM-12MTR MTR 12.00 144
1/22/2023 470/3144 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER
DAUJI VIHAR COLONY WORD-7 , ZONE2&4
3 HDPE PIPE 125MM-12MTR MTR 3.00 36
1/23/2023 468/5209 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 4 HDPE PIPE 110MM-12MTR MTR 10.00 120
1/23/2023 469/3025 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 23.00 276
1/23/2023 469/3025 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 2 HDPE PIPE 125MM-12MTR MTR 7.00 84
1/23/2023 472/3026 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
1/23/2023 471/3019 PROJECT CHANCHAL CONTRUCTION CONTRACTER EMILIYA ROAD 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
1/24/2023 474/3027 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 22.00 264

Page 11 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

1/24/2023 473/3020 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
1/24/2023 473/3020 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
1/24/2023 480/3033 PROJECT JMK CONSTRUCTION CONTRACTER SYADD 1 HDPE PIPE 200MM-12MTR MTR 30.00 360
1/25/2023 475/3028 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
1/26/2023 476/3029 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 1 HDPE PIPE 125MM-12MTR MTR 7.00 84
1/26/2023 476/3029 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 2 HDPE PIPE 110MM-12MTR MTR 3.00 36
1/26/2023 478/3030 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 2 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/26/2023 480/3034 PROJECT JMK CONSTRUCTION CONTRACTER SYADD 1 HDPE PIPE 200MM-12MTR MTR 50.00 600
1/27/2023 483/3031 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 2 HDPE PIPE 140MM-12MTR MTR 10.00 120
1/27/2023 483/3031 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 3 HDPE PIPE 110MM-12MTR MTR 30.00 360
1/28/2023 481/3147 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 32.00 384
1/28/2023 482/3035 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 2 HDPE PIPE 140MM-12MTR MTR 20.00 240
1/28/2023 482/3035 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 3 HDPE PIPE 110MM-12MTR MTR 95.00 1140
1/28/2023 479/3032 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
1/28/2023 479/3032 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 3 HDPE PIPE 125MM-12MTR MTR -1.00 -12 RETURN
1/29/2023 485/3149 PROJECT BANKE BIHARI INTERPRISES CONTRACTERSHIVNAGER/MS ROAD 1 HDPE PIPE 110MM-12MTR MTR 28.00 336
1/29/2023 486/3037 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
1/31/2023 487/3036 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER ZONE-16 DOMPURA 5 HDPE PIPE 110MM-12MTR MTR 14.00 168
1/31/2023 0 PROJECT GIRIRAJ CONTRACTER(DEEVAN) CONTRACTER SUKLA COLONY 1 HDPE PIPE 110MM-12MTR MTR 11.25 RETURN-11PIPE
135 & 2CUTTING PCS -0
2/1/2023 489/3038 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 20.00 240
2/1/2023 491/3039 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 5 HDPE PIPE 110MM-12MTR MTR 19.00 228
2/1/2023 491/3039 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 6 HDPE PIPE 160MM-12MTR MTR 19.00 228
2/2/2023 495/3042 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 30.00 360
2/2/2023 496/3041 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 16.00 192
2/2/2023 496/3041 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 16.00 192
2/2/2023 494/3153 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
2/2/2023 493/3152 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 26.00 312
2/3/2023 201/3156 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/3/2023 497/3154 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/3/2023 497/3154 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 250MM-12MTR MTR 7.00 84
2/3/2023 497/3154 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 100.00 1200
2/3/2023 497/3154 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 200MM-12MTR MTR 2.00 24
2/4/2023 498/3158 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 2.00 24
2/4/2023 498/3158 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 44.00 528
2/4/2023 202/3157 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/4/2023 500/3159 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/2/2023 203/3045 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 16.00 192
2/3/2023 205/3044 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 100.00 1200
2/5/2023 207/3046 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 95.00 1140
2/5/2023 207/3046 PROJECT JMK CONSTRUCTION CONTRACTER N/A 2 HDPE PIPE 200MM-12MTR MTR 11.00 132
2/5/2023 207/3046 PROJECT JMK CONSTRUCTION CONTRACTER N/A 3 HDPE PIPE 180MM-12MTR MTR 9.00 108
2/5/2023 206/3160 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 26.00 312

Page 12 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

2/5/2023 206/3160 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 9.00 108
2/5/2023 208/3161 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 22.00 264
2/3/2023 499/3048 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 7.00 84
2/3/2023 499/3048 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/5/2023 214/3047 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 6 HDPE PIPE 250MM-12MTR MTR 10.00 120
2/5/2023 214/3047 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 7 HDPE PIPE 110MM-12MTR MTR 10.00 120
2/5/2023 213/3049 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/6/2023 212/3051 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/6/2023 210/3162 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/6/2023 211/3167 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 11.00 132
2/6/2023 211/3167 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 225MM-12MTR MTR 7.00 84
2/6/2023 211/3167 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 61.00 732
2/6/2023 215/3168 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 45.00 540
2/7/2023 216/3052 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/7/2023 218/3052 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 7.00 84
2/7/2023 218/3052 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 225MM-12MTR MTR 16.00 192
2/7/2023 218/3052 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 4 HDPE PIPE 140MM-12MTR MTR 4.00 48
2/7/2023 216/3052 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 5 HDPE PIPE 110MM-12MTR NO 52.00 624
2/7/2023 217/3164 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 16.00 192
2/7/2023 217/3164 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 38.00 456
2/8/2023 219/3169 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 280MM-12MTR MTR 20.00 240
2/8/2023 219/3169 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 19.00 228
2/8/2023 219/3169 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 140MM-12MTR MTR 13.00 156
2/8/2023 220/3166 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 12.00 144
2/8/2023 220/3166 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 7.00 84
2/8/2023 220/3166 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 20.00 240
2/8/2023 220/3166 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 4 HDPE PIPE 140MM-12MTR MTR 1.00 12
2/8/2023 221/3053 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 35.00 420
2/9/2023 222/3054 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 35.00 420
2/9/2023 222/3054 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
2/8/2023 223/3055 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 12.00 144
2/8/2023 223/3055 PROJECT JMK CONSTRUCTION CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 22.00 264
2/9/2023 224/3059 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 14.00 168
2/10/2023 226/3057 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 4.00 48
2/10/2023 226/3057 PROJECT SURAJ CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 6.00 72
2/10/2023 225/3056 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 7.00 84
2/10/2023 225/3056 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 8.00 96
2/10/2023 225/3056 PROJECT SURAJ CONTRACTER N/A 5 HDPE PIPE 180MM-12MTR MTR 4.00 48
2/10/2023 236/3060 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 16.00 192
2/10/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
2/10/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 4.00 48
2/11/2023 227/3170 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360

Page 13 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

2/11/2023 229/3062 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
2/12/2023 237/3061 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 10.00 120
2/12/2023 237/3061 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 180MM-12MTR MTR 4.00 48
2/12/2023 237/3061 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 160MM-12MTR MTR 3.00 36
2/12/2023 237/3061 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 4 HDPE PIPE 140MM-12MTR MTR 2.00 24
2/12/2023 237/3061 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 5 HDPE PIPE 125MM-12MTR MTR 3.00 36
2/12/2023 n/a PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
2/12/2023 232/3065 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/12/2023 230/3063 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 8.00 96
2/12/2023 230/3063 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 17.00 204
2/12/2023 228/3171 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 20.00 240
2/12/2023 228/3171 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 250MM-12MTR MTR 15.00 180
2/12/2023 228/3171 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 180MM-12MTR MTR 1.00 12
2/12/2023 228/3171 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 9 HDPE PIPE 110MM-12MTR MTR 22.00 264
2/13/2023 235/3172 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/13/2023 235/3172 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 20.00 240
2/13/2023 239/3069 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/14/2023 241/3173 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
2/15/2023 242/3174 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 250MM-12MTR MTR 8.00 96
2/15/2023 242/3174 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 21.00 252
2/15/2023 242/3174 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 40.00 480
2/15/2023 N/A PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 3.00 36
2/16/2023 246/3177 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 60.00 720
2/16/2023 246/3177 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 10.00 120
2/16/2023 246/3177 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 280MM-12MTR MTR 8.00 96
2/17/2023 247/3178 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 13.00 156
2/17/2023 247/3178 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 280MM-12MTR MTR 14.00 168
2/17/2023 247/3178 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 250MM-12MTR MTR 1.00 12
2/16/2023 552/3074 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 8.00 96
2/16/2023 552/3074 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 3.00 36
2/16/2023 552/3074 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 7.00 84
2/16/2023 552/3074 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 4 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/17/2023 250/3071 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 41.00 492
2/17/2023 250/3071 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 6.00 72
2/17/2023 250/3071 PROJECT SURAJ CONTRACTER N/A 3 HDPE PIPE 140MM-12MTR MTR 5.00 60
2/17/2023 554/3076 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR NO 14.00 168
2/17/2023 551/3073 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 35.00 420
2/17/2023 551/3073 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
2/17/2023 554/3076 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 14.00 168
2/18/2023 555/3180 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 250MM-12MTR MTR 19.00 228
2/18/2023 555/3180 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 200MM-12MTR MTR 25.00 300
2/18/2023 556/3183 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360

Page 14 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

2/18/2023 557 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/18/2023 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 15.00 180
2/19/2023 558/3078 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 25.00 300
2/19/2023 559/3077 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
2/19/2023 563/3079 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/19/2023 563/3079 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 10.00 120
2/20/2023 560/3080 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
2/20/2023 561/3184 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/20/2023 561/3185 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 25.00 300
2/20/2023 561/3184 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 250MM-12MTR MTR 27.00 324
2/21/2023 564 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 16.92 203
2/21/2023 564 PROJECT JMK CONSTRUCTION CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 6.42 77
2/21/2023 564 PROJECT JMK CONSTRUCTION CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 12.50 150
2/21/2023 564 PROJECT JMK CONSTRUCTION CONTRACTER N/A 4 HDPE PIPE 110MM-COIL MTR 7.67 92
2/21/2023 565 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
2/21/2023 565 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 11.67 140
2/21/2023 566 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 14.00 168
2/21/2023 566 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
2/21/2023 568 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 7.42 89
2/21/2023 568 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 8.33 100
2/21/2023 568 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 12.50 150
2/21/2023 568 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 4 HDPE PIPE 110MM-COIL MTR 12.50 150
2/21/2023 569 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 37.50 450
2/22/2023 570/575/3187 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 36.00 432
2/22/2023 575/3187 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 32.00 384
2/19/2023 577/3081 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
2/17/2023 249/3179 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 35.00 420
2/21/2023 567/3186 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
2/24/2023 576/3082 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 12.50 150
2/23/2023 572 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 6.00 72
2/23/2023 572 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 15.00 180
2/23/2023 574 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 23.00 276
2/23/2023 574 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-6MTR MTR 19.00 228
2/23/2023 N/A PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 25.00 300
2/24/2023 579 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
2/24/2023 579 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 11.67 140
2/24/2023 579 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 12.50 150
2/24/2023 580 PROJECT CHANCHAL CONTRUCTION CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 11.00 132
2/24/2023 581 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
2/24/2023 581 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 9.00 108
2/24/2023 581 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 4.33 52
2/24/2023 582 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 37.50 450

Page 15 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

2/24/2023 582 PROJECT JMK CONSTRUCTION CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 8.33 100
2/25/2023 585 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 13.00 156
2/25/2023 586 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 6.58 79
2/25/2023 586 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 6.08 73
2/25/2023 586 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 12.50 150
2/25/2023 587 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 15.00 180
2/25/2023 588 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 7.42 89
2/25/2023 588 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 12.50 150
2/25/2023 588 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 110MM-COIL MTR 12.50 150
2/25/2023 589 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 3.00 36
2/25/2023 589 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 37.50 450
2/25/2023 589 PROJECT SURAJ CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 15.00 180
2/25/2023 589 PROJECT SURAJ CONTRACTER N/A 4 HDPE PIPE 140MM-12MTR MTR 2.00 24
2/26/2023 591 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 37.50 450
2/26/2023 591 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 315MM-12MTR MTR 25.00 300
2/26/2023 N/A PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 10.50 126
2/26/2023 N/A PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 50.00 600
2/27/2023 592 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
2/27/2023 592 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 20.00 240
2/27/2023 592 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 160MM-12MTR MTR 16.00 192
2/27/2023 592 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 4 HDPE PIPE 200MM-12MTR MTR 16.00 192
2/28/2023 594 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 15.00 180
2/28/2023 595 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 12.00 144
3/1/2023 597 PROJECT JMK CONSTRUCTION CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 13.00 156
3/1/2023 597 PROJECT JMK CONSTRUCTION CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 13.00 156
3/1/2023 597 PROJECT JMK CONSTRUCTION CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 7.00 84
3/1/2023 598 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 5 HDPE PIPE 140MM-12MTR MTR 20.00 240
3/1/2023 598 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 6 HDPE PIPE 125MM-12MTR MTR 6.00 72
3/1/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
3/1/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 10.50 126
3/1/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 11.67 140
3/1/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
3/2/2023 600 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 26.00 312
3/2/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 50.00 600
3/3/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 25.00 300
3/4/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 75.00 900
3/5/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 37.50 450
3/5/2023 N/A PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 11.58 139
3/3/2023 353 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 25.00 300
3/3/2023 354 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 315MM-12MTR MTR 15.00 180
3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 8.00 96
3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 2 HDPE PIPE 180MM-12MTR MTR 4.00 48

Page 16 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 11.00 132
3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 4 HDPE PIPE 110MM-12MTR MTR 13.00 156
3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 5 HDPE PIPE 250MM-12MTR MTR 6.00 72
3/15/2023 357 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 6 HDPE PIPE 200MM-12MTR MTR 1.00 12
3/13/2023 358 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
3/14/2023 359 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 50.00 600
3/15/2023 360 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
3/15/2023 360 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 6.00 72
3/16/2023 362 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 6 HDPE PIPE 125MM-12MTR NO 35.00 420
3/16/2023 362 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 7 HDPE PIPE 110MM-COIL MTR 25.00 300
3/16/2023 363 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 110MM-COIL NO 25.00 300
3/18/2023 364 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 12.00 144
3/18/2023 364 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 200MM-12MTR MTR 4.00 48
3/18/2023 364 PROJECT SURAJ CONTRACTER N/A 3 HDPE PIPE 160MM-12MTR MTR 15.00 180
3/19/2023 365 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
3/20/2023 366 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 22.00 264
3/20/2023 366 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 200MM-12MTR MTR 40.00 480
3/21/2023 368 PROJECT SURAJ CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR NO 5.00 60
3/21/2023 368 PROJECT SURAJ CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR NO 15.00 180
3/22/2023 369 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 74.00 888
3/22/2023 373 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 15.00 180
3/22/2023 373 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 8.00 96
3/23/2023 374 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 13.00 156
3/23/2023 374 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 225MM-12MTR MTR 17.00 204
3/25/2023 376 PROJECT RAJ CONTRACTER(JEETU SHARM CONTRACTER N/A 1 HDPE PIPE 250MM-12MTR MTR 25.00 300
3/25/2023 377 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR NO 10.00 120
3/24/2023 378 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 9.00 108
3/24/2023 378 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 15.00 180
3/24/2023 378 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 225MM-12MTR MTR 9.00 108
3/24/2023 378 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 4 HDPE PIPE 200MM-12MTR MTR 10.00 120
3/24/2023 378 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 5 HDPE PIPE 125MM-12MTR MTR 24.00 288
3/20/2023 383 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 12.50 150
3/20/2023 383 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-COIL MTR 37.50 450
3/24/2023 384 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 36.00 432
3/26/2023 385 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 28.00 336
3/26/2023 385 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 15.00 180
3/25/2023 387 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 51.00 612
3/25/2023 387 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 14.00 168
3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 280MM-12MTR MTR 10.00 120
3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 7.00 84
3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 250MM-12MTR MTR 7.00 84
3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 4 HDPE PIPE 180MM-12MTR MTR 17.00 204

Page 17 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 5 HDPE PIPE 160MM-12MTR MTR 3.00 36
3/28/2023 389 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 6 HDPE PIPE 200MM-12MTR MTR 6.00 72
3/28/2023 390 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 25.00 300
3/29/2023 391 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 5 HDPE PIPE 125MM-12MTR MTR 20.00 240
3/29/2023 391 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 6 HDPE PIPE 160MM-12MTR MTR 7.00 84
3/29/2023 391 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 7 HDPE PIPE 140MM-12MTR MTR 3.00 36
3/31/2023 392 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
4/2/2023 288 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
4/2/2023 288 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 160MM-12MTR MTR 7.00 84
4/3/2023 101 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 225MM-12MTR MTR 16.00 192
4/4/2023 102 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 125MM-12MTR NO. 20.00 240
4/4/2023 102 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 140MM-12MTR NO. 3.00 36
4/5/2023 103 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 3 HDPE PIPE 110MM-12MTR MTR 21.00 252
4/10/2023 105 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
4/11/2023 106 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 125MM-12MTR MTR 20.00 240
4/11/2023 106 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 2 HDPE PIPE 140MM-12MTR MTR 5.00 60
4/11/2023 107 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350
4/13/2023 108 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 12 HDPE PIPE 110MM-COIL MTR 29.17 350
4/12/2023 110 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 140MM-12MTR MTR 6.00 72
4/15/2023 111 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 125MM-12MTR MTR 35.00 420
4/15/2023 111 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 110MM-COIL MTR 43.75 525
4/15/2023 112 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 125MM-12MTR MTR 10.00 120
4/15/2023 112 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 2 HDPE PIPE 110MM-COIL MTR 14.92 179
4/15/2023 112 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 3 HDPE PIPE 110MM-COIL MTR 14.58 175
4/16/2023 113 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350
4/16/2023 113 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 2 HDPE PIPE 180MM-12MTR MTR 9.00 108
4/16/2023 113 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 3 HDPE PIPE 160MM-12MTR MTR 5.00 60
4/16/2023 114 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 180MM-12MTR MTR 14.00 168
4/16/2023 114 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 160MM-12MTR MTR 6.00 72
4/16/2023 114 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 3 HDPE PIPE 140MM-12MTR MTR 23.00 276
4/18/2023 115 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350
4/18/2023 116 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 6 HDPE PIPE 140MM-12MTR MTR 10.00 120
4/18/2023 116 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 7 HDPE PIPE 125MM-12MTR MTR 4.00 48
4/18/2023 117 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350
4/19/2023 118 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 7 HDPE PIPE 225MM-12MTR MTR 3.00 36
4/19/2023 118 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 8 HDPE PIPE 250MM-12MTR MTR 6.00 72
4/19/2023 118 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 9 HDPE PIPE 280MM-12MTR MTR 6.00 72
4/19/2023 118 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 10 HDPE PIPE 315MM-12MTR MTR 4.00 48
4/19/2023 119 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 14.58 175
4/19/2023 119 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 2 HDPE PIPE 110MM-12MTR MTR 5.00 60
4/20/2023 120 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 180MM-12MTR MTR 26.00 312
4/20/2023 121 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350

Page 18 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

4/20/2023 121 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 110MM-COIL MTR 13.42 161
4/20/2023 121 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 3 HDPE PIPE 110MM-COIL MTR 14.58 175
4/20/2023 122 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 14.58 175
4/22/2023 123 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 29.17 350
4/22/2023 123 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 2 HDPE PIPE 110MM-12MTR MTR 8.00 96
4/21/2023 124 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 58.33 700
4/22/2023 125 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 180MM-12MTR MTR 12.00 144
4/22/2023 125 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 160MM-12MTR MTR 11.00 132
4/22/2023 125 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 3 HDPE PIPE 140MM-12MTR MTR 10.00 120
4/22/2023 125 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 4 HDPE PIPE 125MM-12MTR MTR 8.00 96
4/24/2023 126 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 58.33 700
4/7/2023 127 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
4/8/2023 128 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 12.50 150
4/8/2023 128 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 110MM-12MTR MTR 14.58 175
4/22/2023 129 PROJECT SARTHI CONSTRUCTION AND INF COMPANY AAMPURA SITE 1 HDPE PIPE 315MM-12MTR MTR 12.00 144
4/22/2023 129 PROJECT SARTHI CONSTRUCTION AND INF COMPANY AAMPURA SITE 2 HDPE PIPE 280MM-12MTR MTR 1.00 12
4/26/2023 130 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 17.00 204
4/26/2023 131 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-COIL MTR 14.58 175
4/26/2023 131 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 2 HDPE PIPE 110MM-12MTR MTR 14.00 168
4/27/2023 132 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
4/27/2023 133 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 60.00 720
4/28/2023 134 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR. 20.00 240
4/28/2023 134 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 2 HDPE PIPE 125MM-12MTR MTR 8.00 96
4/28/2023 135 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 160MM-12MTR MTR 8.00 96
4/28/2023 135 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 2 HDPE PIPE 140MM-12MTR MTR 15.00 180
4/29/2023 136 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 315MM-12MTR MTR 18.00 216
4/29/2023 137 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
4/29/2023 137 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER SITE 2 HDPE PIPE 125MM-12MTR MTR 11.00 132
4/30/2023 138 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 1 HDPE PIPE 140MM-12MTR MTR 13.00 156
4/30/2023 138 PROJECT BANKE BIHARI INTERPRISES CONTRACTER SITE 2 HDPE PIPE 125MM-12MTR MTR 13.00 156
5/2/2023 139 PROJECT NEERAJ MISHRA CONTRACTER
GADORAPURA WORD 475 HDPE PIPE 110MM-12MTR MTR 32.00 384
5/2/2023 139 PROJECT NEERAJ MISHRA CONTRACTER
GADORAPURA WORD 476 HDPE PIPE 125MM-12MTR MTR 3.00 36
5/2/2023 140 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 10.00 120
5/2/2023 140 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
5/3/2023 141 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO. 30.00 360
5/3/2023 143 PROJECT NEERAJ MISHRA CONTRACTER
GADORAPURA WORD 471 HDPE PIPE 110MM-12MTR MTR 130.00 1560
5/5/2023 144 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
5/5/2023 145 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 7.00 84
5/5/2023 145 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 7.00 84
5/5/2023 145 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 125MM-12MTR MTR 8.00 96
5/6/2023 146 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO. 25.00 300
5/6/2023 146 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR NO. 4.00 48

Page 19 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

5/7/2023 147 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO. 50.00 600
5/7/2023 148 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/8/2023 149 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/8/2023 150 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
5/8/2023 150 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 4 HDPE PIPE 140MM-12MTR MTR 3.00 36
5/9/2023 151 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO. 30.00 360
5/10/2023 152 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/10/2023 153 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 17.00 204
5/10/2023 153 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 17.00 204
5/10/2023 153 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/11/2023 154 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 140MM-12MTR MTR 6.00 72
5/11/2023 154 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR NO. 5.00 60
5/11/2023 154 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 12.00 144
5/12/2023 155 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/13/2023 156 PROJECT MAA KALIKA (VIKASH BHARDWA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
5/13/2023 157 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/13/2023 158 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-12MTR MTR 13.00 156
5/14/2023 159 PROJECT NEERAJ MISHRA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 70.00 840
5/15/2023 160 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/15/2023 161 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
5/16/2023 162 PROJECT NEERAJ MISHRA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 70.00 840
5/16/2023 163 PROJECT MAA KALIKA (VIKASH BHARDWA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
5/16/2023 163 PROJECT MAA KALIKA (VIKASH BHARDWA CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 1.00 12
5/17/2023 164 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 8.00 96
5/17/2023 164 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 5.00 60
5/18/2023 165 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/20/2023 167 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO. 50.00 600
5/20/2023 168 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
5/21/2023 169 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/21/2023 170 PROJECT NEERAJ MISHRA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/21/2023 170 PROJECT NEERAJ MISHRA CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 9.00 108
5/22/2023 171 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/22/2023 172 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 35.00 420
5/24/2023 173 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
5/26/2023 175 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/28/2023 176 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 4 HDPE PIPE 160MM-12MTR MTR 12.00 144
5/28/2023 176 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 6 HDPE PIPE 110MM-12MTR MTR 10.00 120
5/28/2023 177 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 50.00 600
5/28/2023 177 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR MTR 6.00 72
5/28/2023 177 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 180MM-12MTR MTR 20.00 240
5/29/2023 178 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 2.00 24
5/29/2023 178 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 17.00 204

Page 20 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

5/29/2023 178 PROJECT KRISHNA (RAVI SHARMA) CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 10.00 120
5/31/2023 181 PROJECT JMK CONSTRUCTION CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 32.00 384
6/1/2023 182 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
6/3/2023 183 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 9.00 108
6/5/2023 185 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
6/5/2023 186 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 200MM-12MTR MTR 7.00 84
6/5/2023 186 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 2 HDPE PIPE 250MM-12MTR NO. 9.00 108
6/5/2023 188 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
6/7/2023 190 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 16.00 192
6/7/2023 190 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER SITE 5 HDPE PIPE 225MM-12MTR MTR 15.00 180
6/7/2023 192 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 24.00 288
6/6/2023 193 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
6/8/2023 194 PROJECT JMK CONSTRUCTION CONTRACTER SITE 1 HDPE PIPE 280MM-12MTR MTR 31.00 372
6/16/2023 195 PROJECT RAVI SHARMA CONTRACTER SITE 1 HDPE PIPE 160MM-12MTR MTR 19.00 228
6/16/2023 195 PROJECT RAVI SHARMA CONTRACTER SITE 2 HDPE PIPE 140MM-12MTR MTR 8.00 96
6/16/2023 195 PROJECT RAVI SHARMA CONTRACTER SITE 3 HDPE PIPE 125MM-12MTR MTR 9.00 108
6/17/2023 196 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 1 HDPE PIPE 110MM-12MTR MTR 10.00 120
6/17/2023 196 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 2 HDPE PIPE 160MM-12MTR MTR 2.00 24
6/17/2023 196 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 3 HDPE PIPE 180MM-12MTR MTR 3.00 36
6/17/2023 196 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 4 HDPE PIPE 280MM-12MTR MTR 11.00 132
6/17/2023 197 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 1 HDPE PIPE 125MM-12MTR MTR 3.00 36
6/17/2023 197 PROJECT SARTHI CONSTRUCTION AND INF CONTRACTER WORD NO30 2 HDPE PIPE 110MM-12MTR MTR 5.00 60
6/19/2023 198 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 15.00 180
6/15/2023 199 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
6/22/2023 451 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 18.00 216
6/22/2023 451 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 4.00 48
6/23/2023 452 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 250MM-12MTR MTR 17.00 204
6/25/2023 454 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR NO. 4.00 48
6/25/2023 454 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 140MM-12MTR NO. 6.00 72
6/25/2023 454 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 180MM-12MTR NO. 11.00 132
6/26/2023 455 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 20.00 240
6/29/2023 456 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 10.83 130
6/29/2023 456 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 2.00 24
6/29/2023 456 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 140MM-12MTR MTR 13.00 156
7/1/2023 457 PROJECT TAYAL STORE SHOPE N/A 1 HDPE PIPE 315MM-12MTR MTR 1.00 12
7/1/2023 457 PROJECT TAYAL STORE SHOPE N/A 2 HDPE PIPE 280MM-12MTR MTR 1.00 12
7/1/2023 457 PROJECT TAYAL STORE SHOPE N/A 3 HDPE PIPE 250MM-12MTR MTR 2.00 24
7/1/2023 457 PROJECT TAYAL STORE SHOPE N/A 4 HDPE PIPE 180MM-12MTR MTR 3.00 36
7/1/2023 457 PROJECT TAYAL STORE SHOPE N/A 5 HDPE PIPE 125MM-12MTR MTR 3.00 36
7/3/2023 459 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
7/4/2023 460 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 31.00 372
7/2/2023 461 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240

Page 21 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

7/6/2023 463 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 4.00 48
7/6/2023 463 PROJECT RAVI SHARMA CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 1.00 12
7/6/2023 463 PROJECT RAVI SHARMA CONTRACTER N/A 3 HDPE PIPE 140MM-12MTR MTR 17.00 204
7/6/2023 463 PROJECT RAVI SHARMA CONTRACTER N/A 4 HDPE PIPE 180MM-12MTR MTR 3.00 36
6/28/2023 464 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 11.00 132
7/7/2023 465 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 40.00 480
7/10/2023 466 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 22.00 264
7/10/2023 466 PROJECT RAVI SHARMA CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 2.00 24
7/10/2023 467 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
7/14/2023 469 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 8.00 96
7/14/2023 470 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 3.00 36
7/14/2023 470 PROJECT RAVI SHARMA CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 30.00 360
7/14/2023 470 PROJECT RAVI SHARMA CONTRACTER N/A 3 HDPE PIPE 180MM-12MTR MTR 5.00 60
7/15/2023 471 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 180MM-12MTR MTR 4.00 48
7/15/2023 472 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 15.00 180
7/15/2023 473 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
7/1/2023 439 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-COIL MTR 14.58 175
7/16/2023 475 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR NO 30.00 360
7/18/2023 476 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 125MM-12MTR MTR 8.00 96
7/18/2023 476 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR MTR 20.00 240
7/18/2023 477 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 25.00 300
7/18/2023 477 PROJECT RAVI SHARMA CONTRACTER N/A 2 HDPE PIPE 125MM-12MTR MTR 2.00 24
7/18/2023 478 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 12.00 144
7/18/2023 478 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 110MM-12MTR NO 15.00 180
7/21/2023 479 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 200MM-12MTR MTR 4.00 48
7/21/2023 479 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 2 HDPE PIPE 160MM-12MTR MTR 12.00 144
7/21/2023 479 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 3 HDPE PIPE 110MM-12MTR MTR 15.00 180
7/23/2023 480 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
7/25/2023 482 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 160MM-12MTR MTR 12.00 144
7/24/2023 483 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 280MM-12MTR MTR 3.00 36
7/24/2023 483 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 2 HDPE PIPE 180MM-12MTR MTR 10.00 120
7/24/2023 483 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 3 HDPE PIPE 110MM-12MTR MTR 13.00 156
7/24/2023 483 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 4 HDPE PIPE 125MM-12MTR MTR 4.00 48
7/25/2023 484 PROJECT RAVI SHARMA CONTRACTER N/A 1 HDPE PIPE 225MM-12MTR MTR 16.00 192
7/25/2023 485 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 160MM-12MTR MTR 12.00 144
7/26/2023 486 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30.00 360
7/30/2023 487 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
7/30/2023 488 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 22.00 264
7/30/2023 488 PROJECT BANKE BIHARI INTERPRISES CONTRACTER N/A 2 HDPE PIPE 200MM-12MTR MTR 5.00 60
7/21/2023 420 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 20.00 240
7/23/2023 481 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTER N/A 1 HDPE PIPE 110MM-12MTR MTR 30 360
8/1/2023 489 PROJECT RAVI SHARMA CONTRACTOR N/A 1 HDPE PIPE 200MM-12MTR MTR 3 36

Page 22 of 29
MIV
Designation/ Nos. of QUANTITY IN
MIV Date No/GATE TYPE Requestor / Contractor name WBS Element SL.No Item Description UNIT REMARKS
Equipment Pipe MTR
PASS NO.

8/1/2023 489 PROJECT RAVI SHARMA CONTRACTOR N/A 2 HDPE PIPE 125MM-12MTR MTR 5 60
8/1/2023 489 PROJECT RAVI SHARMA CONTRACTOR N/A 3 HDPE PIPE 110MM-12MTR MTR 20 240
8/10/2023 491 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 1 HDPE PIPE 180MM-12MTR MTR 20 240
8/12/2023 492 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 1 HDPE PIPE 180MM-12MTR MTR 20 240
8/12/2023 494 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-12MTR MTR 7 84
8/13/2023 495 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTOR N/A 1 HDPE PIPE 125MM-12MTR MTR 20 240
8/13/2023 495 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTOR N/A 2 HDPE PIPE 140MM-12MTR MTR 13 156
8/13/2023 495 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTOR N/A 3 HDPE PIPE 110MM-12MTR MTR 24 288
8/16/2023 498 PROJECT YADAV CRANE SERVICE(NAHAR CONTRACTOR N/A 1 HDPE PIPE 280MM-12MTR MTR 20 240
8/17/2023 500 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-12MTR MTR 14 168
8/17/2023 500 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 2 HDPE PIPE 160MM-12MTR MTR 6 72
8/17/2023 500 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 3 HDPE PIPE 140MM-12MTR MTR 2 24
8/24/2023 555 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR 2 350
8/25/2023 557 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-12MTR MTR COIL 300 2 COIL
8/26/2023 559 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 1 HDPE PIPE 250MM-12MTR MTR 12 144
8/26/2023 559 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 2 HDPE PIPE 110MM-12MTR MTR 7 84
8/27/2023 561 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 1 HDPE PIPE 250MM-12MTR MTR 16 192
9/3/2023 7348 PROJECT BANKE BIHARI INTERPRISES CONTRACTOR N/A 1 HDPE PIPE 110MM-12MTR MTR 20 240
9/4/2023 2446 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 250MM-12MTR MTR 1 12
9/4/2023 2446 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 2 HDPE PIPE 180MM-12MTR MTR 3 36
9/4/2023 2446 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 3 HDPE PIPE 160MM-12MTR MTR 4 48
9/4/2023 2446 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 4 HDPE PIPE 140MM-12MTR MTR 4 48
9/4/2023 2446 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 5 HDPE PIPE 110MM-12MTR MTR 7 84
9/5/2023 7351 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR COIL 175
9/5/2023 7350 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR COIL 230
9/6/2023 7352 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR COIL 350
9/7/2023 7353 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR COIL 300
9/10/2023 7355 PROJECT SARTHI CONSTRUCTION AND INF COMPANY N/A 1 HDPE PIPE 110MM-COIL MTR COIL 960

Page 23 of 29
SARTHI CONSTRUCTION & INFRA PVT LTD
WSS MORENA PROJECT
MONTH OF NOVEMBER 2023 TO FEBRUARY 2024
UNIT HDPE PIPE
SR.NO. MONTH TOTAL
CONTRACTER NAME MM 110 125 140 160 180 200 225 250 280 315
TOTAL ISSUE QTY= MTR 194155 18025 7478 9211 7296.2 6342 8187 3786 3413 2484 260376
TOTAL RECIEVED QTY= MTR 250408 24940 20351 22137 17542 10979 16758 6539 7499 8781 385934
TOTAL BALANCE QTY= MTR 56253 6915 12874 12926 10246 4637 8571 2753 4086 6297 125558

STORE ISSUED QTY UP TO FEB-2024


UNIT HDPE PIPE
SR.NO. UPTO CONTRACTER NAME
MM 110 125 140 160 180 200 225 250 280 315 TOTAL
1 2/28/2024 BANKE BIHARI ENTERPRISES MTR 32762 5713 1251 1896 1874 1584 2412 1962 516 408 50378
2 2/28/2024 CHANCHAL (PARDEEP SHARMA) MTR 2964 60 96 204 0 0 0 0 0 0 3324
3 2/28/2024 GIRIRAJ CONTRACTER (DEEVAN) MTR 441 132 0 0 0 0 0 0 0 0 573
4 2/28/2024 JMK (KALLI) MTR 4416 84 156 264 108 1608 0 0 660 0 7296
5 2/28/2024 KRISHNA KCC (RAVI SHARMA) MTR 19056 1628 1320 1152 804 264 324 144 72 540 25304
6 2/28/2024 MAA KALIKA (VIKASH BHARDWAJ MTR 300 12 0 0 0 0 0 0 0 0 312
7 2/28/2024 N.S. SIKARWAR CONT MTR 144 0 0 0 0 0 0 0 0 0 144
8 2/28/2024 NEELKANTH ASSOCIATES MTR 2856 0 0 0 0 0 0 0 0 0 2856
9 2/28/2024 NEERAJ MISHRA MTR 4224 144 0 0 0 0 0 0 0 0 4368
10 2/28/2024 R.K. INFRA MTR 6080 491 0 180 399 0 0 0 0 0 7150
11 2/28/2024 RADHIKA CONSTRUCTION MTR 0 0 156 0 8 0 180 0 0 0 344
12 2/28/2024 RAJ (JEETU) MTR 8304 1632 396 528 252 324 348 492 504 0 12780
13 2/28/2024 RAMIR CONSTRUCTION MTR 360 0 0 0 0 0 0 0 0 0 360
14 2/28/2024 RR CONSTRUCTION MTR 7522 668 586 735 390 457 -5 0 185 0 10538
15 2/28/2024 RUDRA CONSTRUCTION MTR 12111 84 72 96 72 48 207 252 0 0 12942
16 2/28/2024 S.P. CONSTRUCTION CO. MTR 5644 0 0 0 0 0 0 0 0 0 5644
17 2/28/2024 SAI SHRADDHA AGENCY MTR 20518 0 0 0 0 0 0 0 0 0 20518
18 2/28/2024 SARTHI CONSTRUCTION MTR 6488 426 423 382 540 48 72 84 444 420 9327
19 2/28/2024 SARTHI MAU SITE TRANFER MTR 90 0 0 0 24 0 0 12 0 0 126
20 2/28/2024 SHRI LAXMINARAYAN MTR 2087 0 0 0 0 0 0 0 0 0 2087
21 2/28/2024 SURAJ MTR 3924 324 228 408 192 48 0 0 0 0 5124
22 2/28/2024 TAYAL MTR 0 36 0 0 36 0 0 24 12 12 120
23 2/28/2024 YADAV CRANE SERVICE MTR 53863 6591 2794 3366 2598 1961 4649 816 1020 1104 78761
TOTAL ISSUE QTY MTR 194155 18025 7478 9211 7296 6342 8187 3786 3413 2484 260376

Page 24 of 29
Stor
HDPE PIPE HDPE PIPE 110MM-
S.No. Particular
110MM-COIL 12MTR

1 YADAV CRANE SERVICE(NAHAR SINGH) 6,245.00 35,249.00


2 R.K. INFRA - 6,168.00
3 BANKE BIHARI INTERPRISES 4,111.00 22,932.00
4 JEETU CONTRACTER - -
5 RAJ CONTRACTER(JEETU SHARMA) - 8,460.00
6 CHANCHAL CONTRUCTION - 2,964.00
7 JMK CONSTRUCTION 1,072.00 1,668.00
8 GIRIRAJ CONTRACTER(DEEVAN) - 711.00
9 KRISHNA (RAVI SHARMA) 4,324.00 7,346.00
10 SURAJ 1,500.00 1,560.00
11 SARTHI CONSTRUCTION AND INFTA PVT. LTD. - 492.00
12 NEERAJ MISHRA - 4,224.00
13 MAA KALIKA (VIKASH BHARDWAJ) - 300.00
14 RAVI SHARMA - 3,480.00
15 TAYAL STORE - -
Total 17,252.00 95,554.00
Store Issued Qty. Till July Month
HDPE PIPE 125MM- HDPE PIPE 140MM- HDPE PIPE 160MM- HDPE PIPE 180MM- HDPE PIPE 200MM-
12MTR 12MTR 12MTR 12MTR 12MTR

5,740.00 2,120.00 2,496.00 1,580.00 1,008.00


504.00 - 180.00 408.00 -
3,948.00 1,392.00 1,404.00 1,656.00 1,332.00
180.00 - - - -
1,584.00 396.00 528.00 300.00 336.00
60.00 96.00 204.00 - -
84.00 156.00 264.00 108.00 1,608.00
132.00 - - - -
1,176.00 900.00 432.00 276.00 -
324.00 228.00 408.00 192.00 48.00
84.00 - 168.00 156.00 -
144.00 - - - -
12.00 - - - -
168.00 300.00 648.00 144.00 36.00
36.00 - - 36.00 -
14,176.00 5,588.00 6,732.00 4,856.00 4,368.00
HDPE PIPE 225MM- HDPE PIPE 250MM- HDPE PIPE 280MM- HDPE PIPE 315MM-
Total
12MTR 12MTR 12MTR 12MTR

3,636.00 516.00 780.00 1,056.00 60,426.00


- - - - 7,260.00
1,524.00 996.00 - 612.00 39,907.00
- - - - 180.00
444.00 564.00 504.00 - 13,116.00
- - - - 3,324.00
- - 660.00 - 5,620.00
- - - - 843.00
36.00 72.00 72.00 48.00 14,682.00
- - - - 4,260.00
- - 180.00 144.00 1,224.00
- - - - 4,368.00
- - - - 312.00
192.00 - - - 4,968.00
- 24.00 12.00 12.00 120.00
5,832.00 2,172.00 2,208.00 1,872.00 160,610.00
SCIPL-WSS PROJECT MORENA
HDPE PIPE DETAILS
PHISICAL STOCK
SL NO DESCRIPTION UOM RECEIVED QTY TOTAL RECD AS PER ISSUE
CAMP

1 HDPE PIPE 110 MM MTR 141384.00 141384 117247


2 HDPE PIPE 125 MM MTR 24940.00 24940 14476
3 HDPE PIPE 140 MM MTR 20351.00 20351 5816
4 HDPE PIPE 160 MM MTR 22137.00 22137 6852
5 HDPE PIPE 180 MM MTR 17542.00 17542 5372
6 HDPE PIPE 200 MM MTR 10979.00 10979 4404
7 HDPE PIPE 225 MM MTR 16758.00 16758 5832
8 HDPE PIPE 250 MM MTR 6539.00 6539 2520
9 HDPE PIPE 280 MM MTR 7499.00 7499 2448
10 HDPE PIPE 315 MM MTR 8781.00 8781 1872
TOTAL RECD QTY :- MTR 276910.00 276910 166839 0
MORENA

PHISICAL STOCK ACTUAL ACTUAL


TOTAL PHYSICAL TO BE
OTHER CONSUMPTI STK IN
STOCK BALANCED
LOCATION ON HAND
24137
10464
14535
15285
12170
6575
10926
4019
5051
6909
110071