1. Introduction
ADO is going to support the dialysis center in Abs under the SIRY project. .
The scope of the work shall include any other works required to ensure a well-functioning Diesel
Generator and other equipment but not explicitly mentioned shall be the responsibility of the bidder:
1. Supply of adequately rated cables, lugs, connectors, screws, nut bolts etc. required for retrofitting and
other accessories, which are necessary for satisfactory operation of the DG though not individually or
specifically mentioned herein.
2. All Civil and electromechanical works as per CIVIL Specification required for correct mounting and
installation of DG and other equipment, taking in consideration the existing generator is placed on
paved ground and concrete blocks and other existing equipment which must be dismantled safely.
3. The unit shall be automatically and manually start and stop. The power supply system shall be complete
in all respect for supply, installation and should be deliver ready for operation, complete with necessary
fuel, coolant and lubricant to run the unit for 72 hours.
2
below table summarized the main requirement.
3
Civil work Electrical work
N0 Well#
Block FENCE Control STEEL CHAMBER RCC GENERATOR leveling GENSET PANELS AREIAL
Wall Room GATE COVERING FOUNDATIONS SHED ATS NETWORK
1 M30 NO NO NO NO No Yes Yes Yes Yes Yes NO
4
Program of work
The Contractor is to provide a construction program for Civil and Electromechanical works which has the
following information:
• Sequence of work.
• Holidays.
• Activity inter-relationships.
• Periods within which various stages or parts of the work are to be executed. Time scale: Working
days.
Update the program weekly. Identify changes since the previous version, and show the estimated
percentage of completion for each item of work.
2.3.1. Inspection
The generator set and materials shall be subject to inspection by the ADO engineer, at any stage of
project on site prior installation.
Approval by any of the above inspectors shall not relieve the contractor of his commitments under
the terms of the reference and this specification.
2.3.2. Factory Testing
The generator set manufacturer shall perform a complete operational test on the generator set prior
to shipping from the factory, for which a certified test report shall be provided. All testing shall be
performed with calibrated metering. This factory testing may be witnessed by the client, given a
minimum of two weeks’ notice.
Generator set factory tests on the equipment shall be performed at rated load and rated power
factor, as well as 1.0 power factor. Tests shall include, but are not limited to: run at full load, maximum
power, voltage regulation, transient and steady-state governing, and function of safety shutdowns.
A certified test report, in English, shall be provided documenting the results of these tests.
2.7. Submittals
Bidders shall submit data sheets for the proposed materials with detailed technical specifications of the
DG and system components such as control panels, cables etc
Submittals for approval for DG shall be include but not be limited following:
- Component List - A breakdown of all components and options.
- Technical Data - Manufacturer produced generator set specification or data sheet identifying make
and model of engine and generator, and including relevant component design and performance
data.
- Auxiliary Equipment - Specification or data sheets, including, transfer switch, battery charger,
jacket water heater, main circuit breaker etc.
- Drawings - General dimensions drawings showing overall generator set measurements, mounting
location, and interconnect points for load leads, fuel, exhaust, cooling and drain lines.
- Warranty Statements - Warranty verification published by the manufacturer.
Bidders shall include in their offers system maintenance for One year’s/ 8000hrs, bidders shall provide
necessary equipment and components to run the system safely for such period including replacement of
components when needed at his own expense.
Bidders shall also carry out periodic preventive maintenance visits, the frequency, scope and nature of
such visits shall be consulted and agreed with ADO engineer, but it shall include the following as
minimum:
2.9.1. Training
1. The contractor will be responsible for providing training course focusing on system operating,
maintenance and management, the scope of training and schedule shall be proposed by the
contractor and approved by ADO engineer.
2. The contractor shall also outline the content, and various levels, of their training courses.
Manuals, catalogues and drawings and any other documentation supplied shall be available in English
language, Service Manuals detailing operating instructions, a parts book, preventative maintenance
instructions, routine test procedures, troubleshooting chart and wiring diagrams shall be in the Arabic
Language, where possible. The following manuals and catalogues shall be supplied with each generating
set:
- Engine and alternator Manuals.
- Generating set operation Manual.
- Control installation and operation manual
- Maintenance Manual.
- Troubleshooting Manual.
- Workshop and Spare Parts service Manuals and catalogues.
In particular, the appended manuals should contain the following information:
The Instruction Manual shall include detailed Operating Instructions and, as a minimum, should cover
starting, stopping, protection of circuits, automatic controls, battery charging, safety considerations,
method of adjustment of speed, output voltage, control timers, etc.
Performance parameters of the generator set shall be detailed for the operator's guidance and as a
minimum should cover output voltage, frequency, load, engine temperature and oil pressure nominal
values and acceptable limits. Circuit drawings with component identifications shall be included for
reference purposes.
The contractor shall provide complete maintenance procedures for all the equipment supplied. Schedules
for maintenance to be affected on a daily, weekly, monthly, etc. or on hourly run basis should be included.
Guidelines for the selection of fuel oil, lubricating oil, use of water treatment additives and anti-freeze if
applicable.
2.9.4.3. Troubleshooting:
Troubleshooting procedures shall be available to enable the timely diagnosis of a defect considered
likely to occur in service. Reference outputs and conditions shall be quoted to facilitate diagnosis.
Note:
It is mandatory that Two set of above manuals, catalogues, and electrical drawing/diagram, general
arrangement drawings, pipe works & layout, terminal point's details, foundation drawing and single
line logic diagram shall be supplied under this contract for each category of the offered equipment is
supplied with the bid (electronic versions). Bids shall not be acceptable unless the offer includes these
items.
2.10. Experience:
✓ The contractor must have experience of installing and maintaining Diesel Generators
of a similar size and scope. The contractor must provide details of five reference
projects (With International Organization) within the last seven years;
✓ provider of Statement of Satisfactory Performance from the Top 3 Clients in terms
of Contract Value the past 7 year;