Professional Documents
Culture Documents
KEY PLAN:
A A
HIGHWAY
pipe
HIGHWAY
li
ne
LEGEND:
PLAN
B B
LUP
HIGHWAY
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE
PROFILE
T
STAR
NATURAL GROUND
HIGHWAY
END
DESIGN LEVEL
pipe
FILL
FILL
BACK DE ROAD DEVIDED
li
BACK
C C
D
HIGHWAY
ne
ND RO
SRA1 SINGLE DIRECTION ARROW
AT
T
S
SS1 SLOW WARMING SIGN
ND A
OIL
TART
A
EX
ON CKFI
ROPE
BA
MW1 MAN AT WORK WARMING SIGN
HIGHWAY
NJB E
IT
NJB S
P LL
I
SLS SPEED LIMIT SIGN 20 TO 70
P E L AREA
LUP
SLO
W
PD
PEDESTRAIN
HIGHWAY
HIGHWAY
E
HIGHWAY
WHE
N LO
UNDER
THEN ADED UNDER HERE
ROA ROA
PIPELI D 60 TO PIPELI D IN
CAUTIO NE N CAUTIO NE HSE INSEMERGENC
ENTR N: NOT N: TRUC Y
Y ON
LY
MOR TIONS
VEHI
E
CLE
ENT PERM
ITED
SOIL PIPE LINE
E
pipe
ENG/ALAM
R 20 REV/01 ISSUED FOR APPROVAL
ON
NJB E
LUP
SLOW
ON P
PURPOSE OF ISSUE:
BACK
NJB E
NJB S
line
FOR APPROVAL
HIGHWAY
BACK
ROPE
THIS IS AN UNIVERSAL TM
PEDE ICADED B
NOTE
BACKFILL ON PIPELINE
ND B
AS PER SITE CONDITION
BARR
TART
ND B
FILL A
A
STRA
ACKF
ND R
ACKF
REA
F
BACK
HIGHWAY
F
REA
IN RO Y ROPE AN
ILL EN
O
BECHTEL ENGINEERING COMPANY
pipe
ILL EN
D
DESIGN CONSULTANT: CONTRACTOR:
FILL S
AD
line
D
TART
HIGHWAY
ENG/ALAM
APPROVED ENG/SABEIL 29/02/2024 APPROVED
HIGHWAY
PROJECT NAME :
Logistic Facilities in the Connector
(CH 00+000 to CH 75+000)
Work Order No .1100001344/015
pipe
ENTRANCE AND EXIT VIEW UNIVERSAL TMP LAYOUT WITH PIPE LINE BACKFILL ORG
ASB
DISCIPLINE C. DOCUMENT TYPE
CIV SHD
SEQUENTIAL NUMBER
115179
REV NO.
01
1 2 3 4 5 6 7 8