Professional Documents
Culture Documents
X
150mm. G.I. GUTTER WITH
X
X
X
X
X
X
X
X
X
SCREEN
X
X
X
X
X
X
+9.60 +13.45
X
+12.45
T
CRIMSON
X
13180
PMEN
X
EQUI
SS ROOM
X
ACCE
X
GB
X
TWIN
X
GUES
X
-1 +4.10 +6.00
X
X
GC
X
TWIN
X
GUES
X
X
X
RESORT & SPA
-2
GC
X
TWIN
X
GUES
X
POOL
X
259 12667 259
A D
X
3
GA
X
-3
TWIN
R O
X
GUES
X
X
I C E
+4.15
X
OOD
X
SEAF
A
X
PLAZ
BORACAY
GRILL
R V
X
5
X
CLUB
S E
KID'S
X
7
6
X
BAR +18.50
X
4
IALTY
X
SPEC NT
5
K AURA
X
KIOS REST
X
X
X
1
X
+4.20 +10.00
X
0
X
2.1307
X
S
X
VILLA
X
GE
X
TWIN
X
GUES
X
MAIN
517 649 599 317 599 599 482 599 599 599 374 549 599 599 332 599 599 467 599 599 517
+3.50 POOL GD
X
POOL TWIN +22.65 AC C ES
X
GUES +24.00
TION
X
GE FUNC EN
X
TWIN GARD
X
GUES
X
Y
X
ENTR
BOH D HOUSE
X
X
-2
GUAR
X
X
100
X
X
PTION
X
RECE
X
-3 PAVIL
X
X
X
X
OWNER:
X
+5.80
X
+4.80
X
X
X
X
-4
214
X
OME
X
WELC #LayID
X
LION
X
PAVI
15.2821
X
X
10
X
X
X
100
X
X
X
X
X
X
X
GF
X
TWIN
X
10 TION GUES
X
FUNC N
X
IO
AV IL
T =1
6
-1 3
X
X
E=
N
X
7
= 25
X
X
38
B 31
X
X
M 9
09
X X X X X X X X X X X X X X X X X X X X X X X X
X
8
E
X
X
X
X
L EV
19
BORACAY SEASCAPES INC.
X
X
X
X
E
9
E
.89
V A
X
L
X
.4
A T
10
X
X
X
1
T IO
X
X
X
IO N
X
X
X
N =3
X
X
X
= .
X
X
X
3. 04
X X X X X X X X X X X X X X X X X X X X X X X X
57 0
DS TO TAP IN DS TO TAP IN DS TO TAP IN
1362
0 M
AREA DRAIN AREA DRAIN AREA DRAIN
M (
(M MS
L L)
L
KEYPLAN
W
)
NOTES:
1. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER THE
SCALE SHOWN ON PLANS, SECTIONS, AND DETAILS.
SLOPE TO GUTTER
2. ALL OMISSIONS AND CONFLICTS BETWEEN THE VARIOUS
ELEMENTS OF THE WORKING DRAWINGS AND OR
3- 6% SLOPE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT/DESIGNER IMMEDIATELY BEFORE
ALUMINUM CAPPING (VERIFY MANUFACTURER PROCEEDING WITH ANY WORK SO INVOLVED. NO CHANGES
1283
GI STRAP
C-PURLINS FRAMING
VERIFY BY STRUCTURAL
CANOPY
A TYPICAL BLOW-UP PLAN
A-1.200 SCALE 1:80
C-PURLINS FRAMING
SPECIFICATIONS:
VERIFY BY STRUCTURAL
4317
4006
UPPER GROUND
FLOOR
FFL +0.00M CAST-IN-PLACE CONCRETE PEDESTAL
200
SSL -0.05M
CAST-IN-PLACE CONCRETE PEDESTAL
EPDM GASKET
CANOPY PURLINS EPDM GASKET
PROJECT TITLE:
20MM THK. POLYCARB ROOFING A SOLID FASTENING DETAIL C-PURLIN (VERIFY STRUCTURAL PLAN) ADDITIONAL CANOPY
150
FLOOR PLAN
150MM X 50MM
50 C-PURLINS IN POWDER COAT FINISH
ELEVATION
SECTION
BLOW-UP DETAILS
VERIFY BY STRUCTURAL
200
EXISTING STRUCTURAL BEAM A BLOW-UP SECTION FENCE 1:50 (A3) JAN. 11, 2024
BIDP-CRSB--2023-AR--002--FLEL