You are on page 1of 6

ACL /3131N/ AR-LS/ C / M2/592046 A

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592037

X
X
300
NOTES: Intend Alighment G18B_2

X
X
G18B_3 300
Seawall G18B_4 300

30
1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000.
of GAS pipe under

X
0

X
W18_3

A landside haul road

X
37

X
2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
FUTURE CARGO STAGING AREA

X
X
3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001. (BY OTHERS)

X
X
G18C_1
4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.

X
X
X

X
00 X
SCREENING FACILITIES
3 X
G18C_2 (SUBJECT TO FUTURE PROVISION)
Dwg. No.

X X

0
30
G3A_5 G18E_27 G18C_7 G18C_3 X
G3A_6 G3A_4 G18E_28 G18C_8 G18C_6 X
G18E_26 G18C_4 W18_4
G3A_8 G18C_40 G18C_38 G18C_36 G18C_34 G18C_32 G18E_30 G18C_22 G18C_20 G18C_18 G18C_16 G18C_14 G18C_12 G18C_10 G18C_5 X X
3 7 5
0 300 30 300 3 3 0 300 300 X
30 00

X
300 300

X
300 00 300 30

0
0 300 X

30
00

30
W18_7 0 300 X
3 W18_11 W18_10 W18_9 0 W18_8 0 30 300 W18_6 0
30 W18_5

0
30 375 3 0 30 300 X

30
0 300 0 3 450 X
W3_13 3 0 300 0 0 450 375 375

300
00 300 X X

X
X
300 30 300 0 300 300 300

30
300 300 3 0 5 30 0 300 X X
75 G18E_29

0
G3A_7 G18C_39 G18C_37 G18C_35 G18C_33 G18C_31 4 G18C_21 G18C_19G18C_17 G18C_15 G18C_13 G18C_11 G18C_9 X
X X

450
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
G3A_3 X
G3A_2 G3A_1 G18E_23 X
G18E_24 X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
G18E_25 BY OTHER CONTRACT
AIRFIELD ACCESS ROAD

SECURITY FENCING (BY OTHERS)

WESTERN VEHICULAR TUNNEL (BY OTHERS)


MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592045

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592047
Original Alighment
of GAS pipe

TAXIWAY E
TAXIWAY F3

TAXIWAY F5
TAXIWAY F

TA
XIW
AY
F3

Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 8
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1BB
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1BB Drawing No. ACL/3131N/AR-LS/ C / M2/ 592046 CONSTRUCTION A
File Name: P:\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\DR\3310\DR_59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Tsang, Henry Plot Date: 29/11/2016 16:26:20
ACL /3131N/ AR-LS/ C / M2/592044 A

NOTES:
1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000.

2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
Dwg. No.

3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.

4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592045
G3A_95
G3A_99
300
G3A_100
30
G3A_101 0
3 0 0
300
G3A_103

300
0
30
G3A_96 X
X
0 300 G3A_97
G3A_105 300 3 0 X X
G3A_98
G3A_102X X
300 X X
G3A_111 G3A_107 X X

0
30
300 X X
G3A_112 0 G3A_104 X
30 30 X
G3A_113 0 X X
300 G3A_106X X
300 X X
G3A_115

0
300
G3A_108 X X

30
Intend Alighment 3 0 0
300 G3A_109
G3A_110
X
X
X
X

G3A_117 300
of GAS pipe under
X X
G3A_114X X
300 X X

landside haul road


G3A_119 X X

0
30
X X
0 G3A_116 X
G3A_121 300 30 X
X X
G3A_118X X
300 X X
G3A_123 X

0
X

30
X
G3A_120X
X
G3A_125 300 300 X
X
X
X
300 G3A_122 X
X X
G3A_127

300
G3A_131 X X
300 G3A_124 X X
G3A_132 0
G3A_133
30
0 30 X X
300 X X
G3A_126
X X
300
X X

300
300
G3A_135 X
G3A_128 X
Original Alighment
0 G3A_129
30 300G3A_130 X X
X X
G3A_137 300 X
X
of GAS pipe
G3A_134
300 X X SECURITY FENCING (BY OTHERS)
G3A_143 X X
OA D
G3A_139 R

0
X X S S

30
300 E
G3A_144
3 00
G3A_136
X X
D A CC
G3A_145300 00 3 X X
IE L
300 G3A_138
X
X
X
X
AIRF

300
X

300
G3A_147 X
G3A_140 X X
G3A_141
X X
0 300 G3A_142
G3A_149 300 30 X X
X X
300 G3A_146
X X

0
X

30
G3A_151 X
X
G3A_148 X
0 X X
30 X
G3A_153 300 X
X X
300 G3A_150
X X
300

G3A_155 X X
X X
G3A_152
X X
0
G3A_157300 30 X X
X X
G3A_163 300 G3A_154
X X
300
300

G3A_159 X X
G3A_164 X
3 G3A_156 X
G3A_165 00 0 X X
30
0 30 X X
X X
300
300

G3A_158
300

X X
G3A_167 G3A_160X X
G3A_162 G3A_161
X X
3 0 0 X 300 X
G3A_169 300 X X
X X
G3A_166 X
X
0

X X
30

0 X
30 G3A_168
X
X X
G3A_170X X
0
30

0 X X
0 30 G3A_171
X X
30 G3A_172X X
X X
X
X
X IW AY B
X X TAX
X
G3A_173 X
X X
X X
30

G3A_174 X
X
0
300

G3A_175 300
G3A_176
X
X

TAXIWAY B1
X
X
0
30

X
X
X
X

G3A_177
X
X
X
X
X
X

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592055

Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 6
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1AB
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1AB Drawing No. ACL/3131N/AR-LS/ C / M2/ 592044 CONSTRUCTION A
File Name: P:\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\DR\3310\DR_59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Tsang, Henry Plot Date: 29/11/2016 16:26:20
ACL /3131N/ AR-LS/ C / M2/592045 A

Intend Alighment
of GAS pipe under
landside haul road
Dwg. No.

G3A_55 300 G3A_41 300G3A_40 G3A_21


G3A_54 300
G3A_56 G3A_42 G3A_22 G3A_20
G3A_64 G3A_62 G3A_60 G3A_58 G3A_50 G3A_48 G3A_46 G3A_44 G3A_36 G3A_34 G3A_32 G3A_30 G3A_28 G3A_26 G3A_24 G3A_16 G3A_14 G3A_12 G3A_10 G3A_8
300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300

300
30

30

300
300

30
300

30

0
375

0
0
300 00
300 300 300 300 300

0
0
3 300

30

30
30
30
0

0
300 300 300

0
300 300 30 300 300 300 300 300

30
300 G3A_45 300

30
300 300 300 G3A_27 300

30
G3A_73 G3A_65
G3A_66 G3A_65AG3A_63 G3A_61 G3A_59 G3A_57 G3A_49 G3A_47 G3A_43 G3A_35 G3A_33 G3A_31 G3A_29 G3A_25 G3A_23 G3A_15 G3A_13 G3A_11 G3A_9 G3A_7

300
G3A_39

300
G3A_67 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X G3A_19
X X X X X X X X X X X X X X X
0 G3A_68 X X G3A_53 300 G3A_38 G3A_17
30 G3A_69 G3A_52 G3A_51 G3A_37 G3A_18
G3A_75 300 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
0
30 G3A_71XG3A_70 X
X X 300
300 G3A_72 X300 X
X X
G3A_81 G3A_77
X X AIRFIELD ACCESS ROAD

0
G3A_82

30
X X
G3A_83 300 G3A_74X
X
300 300 300 X X
G3A_76 X X
300 300 X X

300
0
30
X X
G3A_85 G3A_78
X X
SECURITY FENCING (BY OTHERS)
G3A_80G3A_79
G3A_87 30
0 300
X
X
X

X
X
X
Original Alighment
G3A_89
300 G3A_84 X
X X
X
of GAS pipe
0

X
30

X
G3A_86
X X
G3A_91 300 300 X X
G3A_88 X X
MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592044

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592046
300 X X
G3A_93 0 X X
30 X
300 G3A_90 X
X
300 X
X
X
G3A_92 X X
300 X X
X X
G3A_94 X X
X X CAD ANTENNA FARM
X X (BY OTHERS)
X
X

TAXIWAY E

IWAY B
T AX

TAXIWAY F1

TAXIWAY F2
TAXIWAY F

TAXIWAY F1

TAXIWAY F2
NOTES:
1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000.

2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.

3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.

4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.

Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 7
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1BA
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1BA Drawing No. ACL/3131N/AR-LS/ C / M2/ 592045 CONSTRUCTION A
File Name: P:\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\DR\3310\DR_59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Tsang, Henry Plot Date: 29/11/2016 16:26:20
ACL /3131N/ AR-LS/ C / M2/592055 A

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592044

X
X
30
0 G3A_178

X
X
X
300
X
X
X
G3A_179

X
X
NOTES:

X
X
1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000.
Intend Alighment

X
X
300 G3A_181
G3A_182 2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
of GAS pipe under

TAXIWAY B1
30 G3A_183
Dwg. No.

X
X
0
300
3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
landside haul road
300

X
X

X 4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.
G3A_184
X

X
X
0

300
30

G3A_186 G3A_185
X

AIRFIELD ACCESS ROAD


X
X
300
300

X
X

G3A_188 G3A_187
X

X
X

TAXIWAY B
X
X
0

30
30

G3A_190 G3A_189
X

LOCALIZER
X
X
300
300

ANTENNA
(BY OTHERS)
X
X

G3A_192 G3A_191
X

X
X
30

G3A_193
0

X
X
300

G3A_194
X
300

X
X

SECURITY FENCING (BY OTHERS)

TAXIWAY B2
G3A_195
X
X

300 300
X

G3A_196
X

30 G3A_197
0 G3A_198
X
X

X
X
300

X
X

RUNWAY END SAFETY AREA


X
X

G3A_199
X
X

X
X

CAD LOCALIZER BUILDING


(BY OTHERS)
X
X

300
X

G3A_200
X
X

30
X

0
X

X
X

G3A_201
X
X

X
X
30 X TAX
0 X IWAY
X
X B
G3A_202 X
X X
G3A_203 X 300 X
0
30 G3A_204 X X
G3A_205 X
300 300
X
X
X
G3A_206 X X
300 G3A_207 X X
X
0
30 G3A_208
X
300 X X
G3A_209 X X
300 X X
X
30 G3A_211 X
0 X X
G3A_210 300 X X
X
300 G3A_213 X
X X
G3A_212 300 X X
30 G3A_215 X X
0 300
X X
G3A_214 300 G3A_217G3A_218 X X

Original Alighment
0 X
30
X
G3A_219
AIRF
X
300
X
G3A_216 300 IELD
X X
300

ACC of GAS pipe


X
G3A_223
30

X
300
X
ESS
0

G3A_220
X
300 300 X X
ROA
G3A_221
G3A_222 300
G3A_225 X X
X D
X
G3A_224 X X
G3A_227 X X
300 X X
G3A_225A 300 X X
30 G3A_229
X
0
X
X X
G3A_226 300 300
X X
X
G3A_231 X
X
G3A_228 G3A_235 X
G3A_236
X
300 X
X
0 G3A_237
0
X
33000
30

X X
G3A_230 X
3000

X
30

300 G3A_239
X
300

X
G3A_232 X X
300
X
G3A_233 X
G3A_241
X
G3A_234 X
X
G3A_238 300
X
X X
30 300 G3A_243 X X
0
X
G3A_240 G3A_247 300 X
0 G3A_248
X
300 X
30
X
G3A_249 X
X
G3A_242 3 0 0 300
X
X

300
X
G3A_244 G3A_251 X X
X
300
X
G3A_245 300 300 G3A_253 X X
300 X X
G3A_246 X
G3A_250 300
X
X
G3A_255 X
X
G3A_252 0
X
X
30
X
X X
300 G3A_257 X X

30
X X

0
X
G3A_254 300 750 X
300 G3B_1A X X
X
G3A_256 W3_8
X
X
X
300 G3B_1C X

30
X
MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592066

0
Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 11
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1AD
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1AD Drawing No. ACL/3131N/AR-LS/ C / M2/ 592055 CONSTRUCTION A
File Name: P:\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\DR\3310\DR_59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Tsang, Henry Plot Date: 29/11/2016 16:26:20
ACL /3131N/ AR-LS/ C / M2/592066 A

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592055 300 G3B_1C
X
X

30
X
X

0
G3B_1B 30
X
0 750 X
0 G3B_2
G3B_1 X
X
30 00G3B_3
X
NOTES:
X
G3B_1D 3300
X
W3_7 300 X

300

300
X
X
G3B_7 X
1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000. G3B_4 X X
30 750
G3B_5300
X
0
X
G3B_9 X
G3B_6 0
X
30
X
2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001. G3B_8 W3_6
X
X

300
X
X X
G3B_10 30
3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
Intend Alighment
X X
0
750 X X
W3_5
G3B_11 300
4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.
of GAS pipe under
X

300
G3B_12 X
G3B_13 30
landside haul road 0
7
G3B_14 50
Dwg. No.

W3_4

300
G3B_15

Original Alighment
of GAS pipe

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592067
Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
p.p Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 14
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1CB
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1CB Drawing No. ACL/3131N/AR-LS/ C / M2/ 592066 CONSTRUCTION A
File Name: \\wsatkins.com\ProjectCN\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\Submission Record\3310 (3131N)\2021-05-20 DIS001\Tender\DR59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Yeung, Ivan Plot Date: 29/11/2016 16:26:20
ACL /3131N/ AR-LS/ C / M2/592067 A

TAXI
WAY
B

X
X

X X

X X
NOTES:
X X
Dwg. No.

W3_4 1. FOR GENERAL NOTES AND LEGENDS, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 590000.
X

2. FOR DETAILS OF GULLY AND MANHOLE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
X
X

X
X

75 3. FOR GULLY SPACING SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599001.
0
X
X

4. FOR MANHOLE SCHEDULE, REFER TO DRAWING NO. ACL / 3131N / AR-LS / C / DR / 599002.
W3_3
X

X
X

X
300

G3B_16
75

X
0

X
X

W3_2
300

G3B_17
X

X
X
MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592066

X
X

X
X

X
X

X
X

X
X

X
X

SECURITY FENCING (BY OTHERS)


X

X
X

X
X

X
X

X
X

Original Alighment
X

of GAS pipe
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

MATCH LINE - FOR CONTINUATION SEE DWG NO. ACL / 3131 / AR-LS / C / M2 / 592078

Rev. Date Description Checked Rev. Date Checked Rev. Date Checked Signatures for Approval
Notes :
1. Measurements are based on metric system. A 30/11/2020 ISSUED FOR TENDER DC Drawn Date Design Date
Consultant / Contractor Key Plan N
Hong Kong International Airport
2. All levels are in metres to Principal Datum (mPD) unless noted otherwise. CY CHOI 19/12/2016 JEFFREY LAI 19/12/2016
3. Do not scale drawing. Title
4. Figure dimensions are to be followed.
5. Do not use for construction unless expressly permitted.
Checkers
WILSON LAI
Date
19/12/2016
Plot Date
AIRFIELD FACILITIES
6. The Contractor shall verify all conditions on the Site & notify the Employer's
Representative of any variations from dimensions before construction. Design Supervisor Date LANDSIDE ROAD GULLY AND U-CHANNEL LAYOUT PLAN
REX LIU 09/03/2017 SHEET 15
Copyright in this document and all proprietary rights in the information it
contains belong to the AA. It is a condition of the supply of this document, ZONE : 1DA
in whatever form, that the recipient shall hold it in confidence and shall not Authorised Representative Date Scale Zone Originator Design Ref. Location Discipline Type Number Status Revision
duplicate or otherwise reproduce it in whole or in part, nor disclose its contents DAMIAN CREALLY 09/03/2017 Airport Authority HKIA Tower, 1 Sky Plaza Road, Hong Kong International Airport, Lantau, Hong Kong
without the written consent of the AA. Tel : (852) 2188 7111 Fax : (852) 2824 0717 1: 500 (in A0) 1DA Drawing No. ACL/3131N/AR-LS/ C / M2/ 592067 CONSTRUCTION A
File Name: P:\CNHKA\Project\5147164-Airfield_3131\24.00 BIM\24.10 WIP\CIV\DR\3310\DR_59\ACL-3131N-AR-LS-C-M2-592031 - 592067.dwg User Name: Tsang, Henry Plot Date: 29/11/2016 16:26:20

You might also like