Professional Documents
Culture Documents
N
Q
KEY PLAN:
*NOTE:-
REFER TO INTERIOR DRAWINGS AND SANITARY CUTSHEETS FOR SANITARY SELECTIONS.
35100
7a
2520
1 2 2
3 3001 3001 2001
2002 3620 470 1000 1000 1000 2480 9250 470 1000 1000 1000 1000 1000 530 470 1000 1000 1000 1000 1000 480 4620
6a
2530
F0y
F0y F0y
F0y F0y F0y
2 F0y
2002 LB LB LB LB LB 1
LB LB LB F0y
1150
17890
2230
2230
3100
5a 2
1580
1580
2280
+6.950 FFL
S1.1 F0y CATWALK LEVEL
-
880
+8.450FFL ACCESS LADDER ACCESS LADDER METAL RAILING F0y ACCESS LADDER
CAT LADDER F0y
1510
3510 5580CATWALK LEVEL 4810 1180 15270 11600 4550
3000
ACCESS LADDER
4a +8.450FFL
7540
F0y
2237
CATWALK LEVEL
14
3
3100
3a 18900
+4.30 FFL
60 +6.50 S.S.L T.O.PARAPET
70
CAT LADDER
3970
F0y
2a
4
10
S1.1
15
4
9420
14300
METAL RAILING
4150
5
0
MOTIONGATE EXPANSION
89
17 DUBAI, UAE
26 LEAD CONSULTANT:
2 30
1 OFFICE 2805 - 2810, CONCORD TOWER,
2002 MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
10
4410
+4.00S.S.L
B1 3390 ACCESS LADDER METAL ACCESS LADDER CAT LADDER ACCESS LADDER ROOF METAL RAILING ACCESS LADDER
F0y RAILING
6590
2336 3860 10370 1180 20050
0 2100
C1 +8.450FFL F0y +6.950 FFL
S1.1
+8.450FFL F0y +6.950 FFL
1960 CATWALK LEVEL CATWALK LEVEL - CATWALK LEVEL CATWALK LEVEL
1670
F0y
D1 3080
1580
2180
1840
7
2230
2240
3180
1550
E1 F0y LB LB LB
LB LB LB LB
F1 +6.950 FFL
CATWALK LEVEL
F0y
F0y F0y 8
F0y
F0y F0y
G1 F0y
F0y F0y
F0y
H1 4760 470 1000 1000 1000 2480 9250 480 1000 1000 1000 1000 1000 1000 1000 1000 8100
J1 1
2001
Stage:
DETAIL DESIGN
15/Apr/2020 AK OM A0
MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :
N
Q
KEY PLAN:
*NOTE:-
REFER TO INTERIOR DRAWINGS AND SANITARY CUTSHEETS FOR SANITARY SELECTIONS.
35100
7a
2520
1 2 2
3 3001 3001 2001
2002 +10.900 +12.300
+10.900
6a T.O PARAPET T.O PARAPET
2530
T.O PARAPET
+10.900 +12.300
T.O PARAPET T.O PARAPET
2
1
400
400
650
650
2002
250
SLOPE
SLOPE
SLOPE 2%
SLOPE 2%
SLOPE 2%
2%
2%
17890
1250
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
ROOF ROOF ROOF
3100
5a ROOF ROOF
2
1000
700
CORRUGATED SHEET CAT LADDER
1510
ROOFING BELOW
3000
4a
7540
F0y
2237
CATWALK LEVEL-2
14
3
3100
3a
54
+4.30 FFL
00 +6.50 S.S.L T.O.PARAPET
+12.450 FFL
CATWALK LEVEL-2
3970
F0y
11
2a 7 0
S1.1
CAT LADDER 4
10
-
15
PROJECT:
5
17
46
MOTIONGATE EXPANSION
0 DUBAI, UAE
26 LEAD CONSULTANT:
23
1 0
OFFICE 2805 - 2810, CONCORD TOWER,
2002 MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
10
4360
ROOF
B1 3390
CAT LADDER
6590
2336 CORRUGATED SHEET
0 2100 BELOW
C1 ROOFING
SLOPE 2%
SLOPE 2%
1960
ROOF
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
D1 3080
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
2230
ROOF ROOF ROOF
3180
7
E1
1550
250
650
400
400
F1 8
+10.900 +12.300 +10.900 +12.300 +10.900
G1 T.O PARAPET T.O PARAPET T.O PARAPET T.O PARAPET T.O PARAPET
J1 136580
2001
Stage:
DETAIL DESIGN
15/Apr/2020 AK OM A0
MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :
N
Q
KEY PLAN:
*NOTE:-
REFER TO INTERIOR DRAWINGS AND SANITARY CUTSHEETS FOR SANITARY SELECTIONS.
35100
7a
2520
1 2 2
3 3001 3001 2001
2002 +10.900 +12.300
+10.900
6a T.O PARAPET T.O PARAPET
2530
T.O PARAPET
+10.900 +12.300
T.O PARAPET T.O PARAPET
2
2002 1
SLOPE
SLOPE
SLOPE 2%
SLOPE 2%
SLOPE 2%
2%
2%
17890
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
ROOF ROOF ROOF
3100
5a ROOF ROOF
2
1510
ROOFING BELOW
3000
4a
7540
F0y
2237
3a
54
+4.30 FFL
00 +6.50 S.S.L T.O.PARAPET
+16.110 FFL
CATWALK LEVEL-2
3970
F0y
11
2a 70
S1.1
CAT LADDER 4
10
-
15
PROJECT:
5
17
46
MOTIONGATE EXPANSION
0 DUBAI, UAE
26 LEAD CONSULTANT:
2 30
1 OFFICE 2805 - 2810, CONCORD TOWER,
2002 MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
P.O. BOX: 79593
10
15
CAT LADDER
2336 CORRUGATED SHEET
0 2100 BELOW
C1 ROOFING
SLOPE 2%
SLOPE 2%
1960
ROOF
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
D1 3080
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
SLOPE 2%
2230
ROOF ROOF ROOF
3180
7
E1
F1 8
+10.900 +12.300 +10.900 +12.300 +10.900
G1 T.O PARAPET T.O PARAPET T.O PARAPET T.O PARAPET T.O PARAPET
H1
J1 136580
2001
Stage:
DETAIL DESIGN
15/Apr/2020 AK OM A0
MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
+ 19.900 LVL.
T.O.FACADE
1800
A-ASM-001
+ 18.100 LVL.
T.O.FACADE 1990
C-1.01
A-PP-01 KEY PLAN:
2550
+ 10.900 LVL.
T.O.FACADE
1150
19900
2800
2800
S-1.01 S-1.01
A-ASM-001
12300
12300
12300
FALSE CEILING & INTERNAL FINISHES ROOF SLAB FOR DETAILS
FALSE CEILING & INTERNAL FINISHES ROOF SLAB FOR DETAILS
FOR DETAILS REFER TO ID PACKAGE REFER TO STRUCTURAL PACKAGE GENERAL NOTES:
2950
FOR DETAILS REFER TO ID PACKAGE REFER TO STRUCTURAL PACKAGE
2950
1400
CONSULTANT, P.O.Box 79593, DUBAI. IT IS FORBIDDEN TO PRODUCE IT'S
1400
700
700
700
STATED DIMENSIONS ONLY ARE TO BE CONSIDERED.
4000
RESOLVED BY D.E.C. DYNAMIC ENGINEERING CONSULTANT BEFORE
4000
3700
3700
A-GL-03
3700
3700
COMMENCEMENT OF ANY WORK.
3000
3000
3000
2200
2200
2200
±0.00 F.F.L ±0.00 F.F.L FACILITY ELEC. OPERATOR BOOTH
CONTINENTAL CORRIDOR THE SOMMELIER ACCOUNTING LOWER LOUNGE
GROUND FLOOR EXIT RETAIL GROUND FLOOR ELV /AV ROOM Q-FAST
(QUEUE) DIMMER RIDER ELELC. (QUEUE)
(QUEUE) (QUEUE) -0.150 LVL.
150
-0.150 LVL.
PAVEMENT LVL.
150
PAVEMENT LVL.
FOR FINAL GRADE &FINISH SLAB ON GRADE FOR DETAILS FOR FINAL GRADE &FINISH
FOR FINAL GRADE &FINISH SLAB ON GRADE FOR DETAILS FOR FINAL GRADE &FINISH
REFER TO ADA PACKAGE REFER TO STRUCTURAL PACKAGE REFER TO ADA PACKAGE
REFER TO ADA PACKAGE REFER TO STRUCTURAL PACKAGE REFER TO ADA PACKAGE
SCHEDULE OF MATERIALS
SCHEDULE OF THEMATIC MATERIALS SCHEDULE OF NON-THEMATIC MATERIALS
1 SECTION 2 SECTION AS-MATERIALS AS-MATERIALS
* PLEASE REFER TO CUTSHEETS FOR MATERIAL PLEASE REFER TO EXTERIOR COLOR/GUIDE FOR
FINISHES FINISH AND COLOR OF ALL A-DESIGNATION
* FOR ITEMS NOT MENTIONED HERE -- MATERIALS.
REFER TO ARCHITECTURE PACKAGE / MATERIALS KEY NOTE DESCRIPTION
* FOR COLORS: SUBJECT TO FIELD ART WOOD
CREATIVES' DIRECTION
A-WD-01 WOOD DOOR AND FRAME
KEY NOTE DESCRIPTION
A-WW-02 WOOD WINDOW AND FRAME
FLOORING
A-WR-02 WOODEN RAIL
A-CC-01 COLOURED CONCRETE
A-WB-02 WOODEN BARRIER
A-SC-01 STAMPED CONCRETE
PAINT
I-TL-100 PORCELAIN TILES
A-PF-01 PAINT FINISH
I-EP-100 EPOXY PAINT
A-PP-01 PLASTER CEMENT WITH PAINT
I-FE-001 RAISED FLOORING SYSTEM
GLAZING
I-FC-101 VINYL COVERING
A-GL 001 INSULATED GLASS
WALL
A-GL 002 SPANDREL GLASS
A-PF-002 PAINT EMULSION ( EXTERIOR )
A-GL 003 MONOLITHIC, TEMPERED GLASS
A-PF-003 PAINT EMULSION ( INTERIOR )
A-GL 004 INSULATED GLASS - SHOPFRONT
A-FRP-001 FRP FACADE CLADDING
A-GL 005 FIRE-RESISTANT GLASS
A-FRP-002 FRP COLUMN CLADDING
LAMINATED GLASS
A-GL 006
A-FRP-003 FRP MARQUEE WITH NEON LIGHTS
A-GL 007 LAMINATED GLASS w/ COLORED
CEILING INTERLAYER
I-CT 002 ACOUSTIC CEILING TILE A-GL 008 POLYCARBONATE GLAZING
CIVIL CONSTRUCTION MATERIALS
G F E D C B A I-EC -- EXPOSED CEILING(SLAB/METAL DECK)
C-1.01 FIBRE CEMENT BOARD
A-CB-001 CEMENT BOARD CEILING
C-1.02 INTERMEDIATE STEEL SUPPORT
A-GYP-001 GYPSUM CEILING
C-1.03 16MM MARINE PLYWOOD
I-P-007 MOISTURE REPELLANT PRIMER
C-1.04 ALUMINIUM FLASHING
ROOFING
C-1.05 ALUMINIUM COUNTER FLASHING
A-CR-002 CORRUGATED SHEET - ROOFING
C-1.06 WATER PROOFING MEMBRANE A 06/05/2020 SH ISSUED FOR TENDER
A-PCB-001 POLYCARBONATE ROOFING
C-1.07 RIGID INSULATION
A-ASM-001 MISCELLANEOUS Rev: Date: Name: Description:
C-1.08 ROCK WOOL INSULATION
A-TPP-01 THEMED PLASTER WITH PAINT
C-1.09 CEMENT SCREED SLOPED TOWARDS PROJECT:
+ 19.900 LVL. A-WD-001 WOOD - DUMMY DOOR DRAIN POINT (MIN. 50mm)
T.O.FACADE
A-WD-002 WOOD - TRELLIS
C-1.10 CEMENT SCREED SLOPED LEVEL MOTIONGATE EXPANSION
1800
A-GL-03 GLASS
C-1.11 WEEP HOLE WITH WEEP HOLE PLUG DUBAI, UAE
+ 18.100 LVL. A-GL-01 GLAZING - DOOR DOUBLE GLAZED
C-1.12 CONTINUOUS ALUMINIUM PRESSURE
T.O.FACADE A-GL-02 GLAZING - WINDOW DOUBLE GLAZED BAR LEAD CONSULTANT:
A-GL-03 GLAZING - DUMMY WINDOWS OFFICE 2805 - 2810, CONCORD TOWER,
1990
1400
A-MH-01 METAL DOOR HARDWARE
+ 10.900 LVL. A-GL-03 C-1.23 INSULATED SANDWICH PANEL
A-MM-01 METAL MESH
T.O.FACADE C-1.24 CEMENT ROOFING TILE
STONE
1150
10900
A-ASM-001 AS-STONE MOULDINGS & CORBELS
2500
1400
S-1.06 GRAPHIC STEEL SUPPORT
ROOF A-ASS-001 AS-STONE STAIRS
+ 4.000 S.S.L
ROOF ITEM CODE
INTERIOR MISCELLANEOUS
PRP-10-00 PROP PACKAGE
700
700
3700
3700
ELE-10-00 ELECTRICAL PACKAGE
3000
3000
15/Apr/2020 AK JK A0
MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :
3a 4a 5a 6a
220 300
3100 3000 3100
TYP.
G1
8mm MS ANGLE
3
277.77 TYP.
4911 PU COATED STEEL CHANNEL
1100
UP REFER TO STRUCTURAL PACKAGE
+4.000 S.S.L. 8mm THICK GI CHECKER PLATE DXB PROJECT & MANAGEMENT SERVICES LLC
ROOF LVL. 01 02 03 04 05 06 07 4 300 AS PER SPECIFICATION
4911 TYP.
2030 1250
KEY PLAN:
3280
6
4911
GENERAL NOTES:
1. THIS DRAWING IS THE PROPERTY OF - D.E.C. DYNAMIC ENGINEERING
CONSULTANT, P.O.Box 79593, DUBAI. IT IS FORBIDDEN TO PRODUCE IT'S
CONTENTS IN ANY FORM, EXCEPT FOR THE INTENDED PURPOSE.
EQ.
50mmØ STEEL HANDRAIL
PU COATED
EQ.
3
+6.700 F.F.L 4911 8MM GI CHECKER PLATE
1100
UP TOP ROOF
+4.000 S.S.L.
ROOF LVL. 01 02 03 04 05 06 07 08 09 4
4911
8mm MS ANGLE
270 8 TREAD 1250
3280
PFC 260x90x35
4a 5a
50mm Ø MS STEEL HAND RAIL
(PU COATED)
50
50
300
1150
1150
700
100
300
+ 6.70 F.F.L
100
REFER STRUCTURAL
(9X277.77)=2500
4911
MOTIONGATE EXPANSION
1150
TREAD = 300 mm
RISER = 277.77mm 50mm Ø MS STEEL POST (PU COATED) DUBAI, UAE
+4.200 F.F.L
5 LEAD CONSULTANT:
4911
ROOF LEVEL
52°
5a 4a
50
300
1150
800
+ 6.70 F.F.L
TOP ROOF LEVEL
3850
REFER STRUCTURAL
9X277.77) = 2500
4911
TREAD = 300 mm Stage:
RISER = 277.77mm DETAIL DESIGN
+4.200 F.F.L
5
4911
52°
15/Apr/2020 SV JK A0
MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :
C 6 5 C 6
3012 3012 3012
5
A-ASM-001 3012
G F E D C B A
8a
7a
+ 12.300 6a
T.O.PARAPET
300
1
5a 2
550
4a
430 150
3a
WAR ROOM
±0.00 F.F.L A-ASC-001 2a
4572 REQUIRED 4
3277 RIDE
3340
1a
13
665
3850
3277 RIDE
5
ENVELOPE
DEC
3 A-GL-03
2 3012
6
A1
B1
C1
725
725
1555
D1
LB LB LB
1275
7
E1 1b
F1 8
G1 KEY PLAN:
H1
A-MT-001 J1
400
400
300
300
LIGHT BOX LIGHT BOX E2 D2 C2 B2 A2
200
80
1
200
+ 8.450 FFL
670
150
60
175 350 950 350 675 1000 1000 1000 500 PFC 260x90x35
1235
665
+1.895 FFL
1950
A-GL-03
LB LB LB
3400
-0.15
A-MT-001 - KEY PLAN
2515
1555
PAVEMENT LEVEL 3012
+ 6.50 SSL
UPPER ROOF A-MT-001
130
12300
55
150x150x5 typ
950
330
20
CAT WALK LEVEL
GENERAL NOTES:
A-ASC-001
125 75
1950 1. THIS DRAWING IS THE PROPERTY OF - D.E.C. DYNAMIC ENGINEERING
280
CONSULTANT, P.O.Box 79593, DUBAI. IT IS FORBIDDEN TO PRODUCE IT'S
CONTENTS IN ANY FORM, EXCEPT FOR THE INTENDED PURPOSE.
1550
6 4 5 25
3012 3012 3012 50 255 2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
SP UNLESS NOTED OTHERWISE. THIS DRAWING IS NOT TO BE SCALED. THE
A-MT-001 REAR OPERABLE LIGHTBOX UNITS WITH
535
300 STATED DIMENSIONS ONLY ARE TO BE CONSIDERED.
+ 4.00 SSL VENT HOLE AND BIRD'S SCREEN
ROOF 3. THE DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION AND
A-GL-03 LIGHT BOX INTERIOR THEMING SUBJECT TO RESOLVED BY D.E.C. DYNAMIC ENGINEERING CONSULTANT BEFORE
3070
ART DIRECTOR'S APPROVAL COMMENCEMENT OF ANY WORK.
LB LB
1 C-1.01
1 GROUND FLOOR PART PLAN 3012 PFC 260x90x35 A-PP-01
A-MT-001
LIGHT BOX S-1.01
2030
4000
1555
C A-GL-03
2060
LB LB
1655
SCHEDULE OF MATERIALS
A-GL-03 A-MT-001
SCHEDULE OF THEMATIC MATERIALS SCHEDULE OF NON-THEMATIC MATERIALS
100
±0.00 F.F.L 310
AS-MATERIALS AS-MATERIALS
150
GROUND FLOOR A-MT-001 PLEASE REFER TO EXTERIOR COLOR/GUIDE FOR
* PLEASE REFER TO CUTSHEETS FOR MATERIAL
PLATFORM FINISHES FINISH AND COLOR OF ALL A-DESIGNATION
-0.15
50
* FOR ITEMS NOT MENTIONED HERE -- MATERIALS.
PAVEMENT LEVEL CATWALK
+8.450LVL. REFER TO ARCHITECTURE PACKAGE / MATERIALS KEY NOTE DESCRIPTION
200
FOR STRUCTURAL SUPPORT DETAILS CAT WALK LEVEL * FOR COLORS: SUBJECT TO FIELD ART WOOD
535
CREATIVES' DIRECTION
55
REFER TO STRUCTURAL PACKAGE
A-WD-01 WOOD DOOR AND FRAME
KEY NOTE DESCRIPTION
220
REAR OPERABLE LIGHTBOX UNITS WITH S-1.01 A-ASM-001 A-WW-02 WOOD WINDOW AND FRAME
VENT HOLE AND BIRD'S SCREEN ROOF FLOORING
A-WR-02 WOODEN RAIL
+ 4.00 SSL A-CC-01 COLOURED CONCRETE
ROOF LVL. A-WB-02 WOODEN BARRIER
PFC 260x90x35 typ for stairs A-SC-01 STAMPED CONCRETE
PAINT
I-TL-100 PORCELAIN TILES
2 A-PF-01 PAINT FINISH
I-EP-100 EPOXY PAINT
CATWALK A-PP-01 PLASTER CEMENT WITH PAINT
4 PART ELEVATION 7 DETAIL I-FE-001 RAISED FLOORING SYSTEM
1000
300
300
LIGHT BOX LIGHT BOX LIGHT BOX A-PF-002 PAINT EMULSION ( EXTERIOR )
1 A-GL 003 MONOLITHIC, TEMPERED GLASS
310 90
LAMINATED GLASS
A-GL 006
+ 5.820 FFL A-FRP-003 FRP MARQUEE WITH NEON LIGHTS
A-GL 007 LAMINATED GLASS w/ COLORED
CEILING INTERLAYER
I-CT 002 ACOUSTIC CEILING TILE A-GL 008 POLYCARBONATE GLAZING
5400 CIVIL CONSTRUCTION MATERIALS
I-EC -- EXPOSED CEILING(SLAB/METAL DECK)
C-1.01 FIBRE CEMENT BOARD
1 2 1 2 A-CB-001 CEMENT BOARD CEILING
C-1.02 INTERMEDIATE STEEL SUPPORT
A-GYP-001 GYPSUM CEILING
A-ASM-001 C-1.04 C-1.03 16MM MARINE PLYWOOD
I-P-007 MOISTURE REPELLANT PRIMER
CORRUGATED SHEET CORRUGATED SHEET C-1.04 ALUMINIUM FLASHING
330 330
ROOFING
+ 12.300 + 12.300 C-1.05 ALUMINIUM COUNTER FLASHING
A-CR-002 CORRUGATED SHEET - ROOFING
T.O.PARAPET T.O.PARAPET C-1.06 WATER PROOFING MEMBRANE A 06/05/2020 SH ISSUED FOR TENDER
300
300
A-PCB-001 POLYCARBONATE ROOFING
C-1.07 RIGID INSULATION
7 150
7 150
MISCELLANEOUS Rev: Date: Name: Description:
550
550
VENT HOLE AND BIRD'S SCREEN VENT HOLE AND BIRD'S SCREEN C-1.08 ROCK WOOL INSULATION
3012 3012 A-TPP-01 THEMED PLASTER WITH PAINT
PROJECT:
C-1.09 CEMENT SCREED SLOPED TOWARDS
220 360 150
3850
VENT HOLE AND BIRD'S SCREEN VENT HOLE AND BIRD'S SCREEN A-GL-02 GLAZING - WINDOW DOUBLE GLAZED BAR LEAD CONSULTANT:
330 300 A-GL-03 330 300 A-GL-03 GLAZING - DUMMY WINDOWS OFFICE 2805 - 2810, CONCORD TOWER,
C-1.13 NOT USED
LIGHT BOX INTERIOR THEMING IS SUBJECT TO A-GL-04 GLAZING - DUMMY CURTAIN WALL MEDIA CITY, DUBAI, UNITED ARAB EMIRATES,
2 PLAN @+6.750 PART PLAN LIGHT BOX INTERIOR THEMING IS SUBJECT TO
2150
2150
2030
2030
ART DIRECTOR'S APPROVAL ART DIRECTOR'S APPROVAL
C-1.14 GEOTEXTILE MEMBRANE
METAL P.O. BOX: 79593
LIGHT LIGHT C-1.15 SS MESH PLASTER ACCESSORY
BOX BOX A-MT-001 DECORATIVE METAL RAILING TEL.: 04-2989220, FAX: 04-2989210
A-MT-001 A-MT-001 C-1.16 SS PLASTER TERMINATION
A-MT-002 DECORATIVE FIRE ESCAPE LADDER www.decengineering.net
ACCESSORY
200
200
310 C-1.01
150x150x5 typ 310 A-MT-003 ALUMINUM LASER-CUT SCREEN
C-1.01 C-1.17 SS PLASTER TERMINATION W/
+ 8.450 A-PP-01 + 8.450 A-PP-01 A-MT-004 ALUMINUM EXTRUDED SCREEN SHADOW GAP ACCESSORY
CAT WALK LEVEL CAT WALK LEVEL A-MT-005 ALUMINUM SCREEN WITH VERTICAL
220
220
60
60
MULLION C-1.18 SS PLASTER GROOVE ACCESSORY
C-1.19 CONTINOUS METAL GUTTER
540
540
REAR OPERABLE LIGHTBOX UNITS WITH REAR OPERABLE LIGHTBOX UNITS WITH A-MT-006 ALUMINUM DOOR GRILLS
C VENT HOLE AND BIRD'S SCREEN VENT HOLE AND BIRD'S SCREEN C-1.20 STEEL COMPOSITE ROOFING PANEL
A-MD-01 METAL DOOR AND FRAME
330 300
A-MT-001 330 300 C-1.21 STEEL COMPOSITE CLADDING PANEL
A-MW-01 METAL WINDOW AND FRAME
LIGHT BOX INTERIOR THEMING IS SUBJECT TO A-GL-03 C-1.22 ALUMINIUM LOUVRE
A-MH-01 METAL DOOR HARDWARE
2030
2030
2900
2900
ART DIRECTOR'S APPROVAL
LIGHT LIGHT S-1.01 C-1.23 INSULATED SANDWICH PANEL
BOX BOX A-MM-01 METAL MESH
1740
1740
A-GL-03 LIGHT BOX INTERIOR THEMING IS SUBJECT TO C-1.24 CEMENT ROOFING TILE
STONE
A-MT-001 ART DIRECTOR'S APPROVAL C-1.25 PROTECTION BOARD
310 310 A-ASC-001 AS-STONE CLADDING
12300
FOR STRUCTURAL SUPPORT DETAILS FOR STRUCTURAL SUPPORT DETAILS C-1.26 BITUMEN SHEET
REFER TO STRUCTURAL PACKAGE REFER TO STRUCTURAL PACKAGE A-ASC-002 AS-STONE CLADDING
C-1.27 BILLBOARD FRAME
A-ASC-003 AS-STONE CLADDING
30
30
220 260140 200
1550
540
LIGHT
BOX S-1.06 GRAPHIC STEEL SUPPORT
CAT WALK LEVEL
1275
2630
ITEM CODE
2540
ROOF SLAB DETAILS REFER TO ROOF SLAB DETAILS REFER TO INTERIOR MISCELLANEOUS
300
300
300
LIGHT BOX LIGHT BOX LIGHT BOX STRUCTURAL PACKAGE STRUCTURAL PACKAGE PRP-10-00 PROP PACKAGE
1 BH-GNRL- CA-10A OVERHEAD STORAGE CABINET
310 90
4000
+ 8.570 FFL A-MT-001
590
LIGHT
1450
BOX
A-GL-03 NOTES Stage:
DETAIL DESIGN
LIGHT BOX INTERIOR THEMING IS SUBJECT TO - All FOH exposed services to receive
ART DIRECTOR'S APPROVAL a thematic paint treatment to field art
WAR ROOM 2% SLOPE WAR ROOM direction approval. Drawing Title:
±0.00 F.F.L ±0.00 F.F.L
150
150
150
2% SLOPE
GROUND FLOOR GROUND FLOOR
- To receive field art direction 4-D FREELY COASTER (5-404)
-0.15 -0.15 approval for all mock-ups prior to
PAVEMENT LEVEL PAVEMENT LEVEL installation as well as approval of final WALL SECTION & DETAILS
installation.
SLAB ON GRADE FOR DETAILS SLAB ON GRADE FOR DETAILS
REFER TO STRUCTURAL PACKAGE REFER TO STRUCTURAL PACKAGE - Graphics & Marquee to be finalized Scale: Plot No./ Area:
6 4 5 PAVING DETAILS REFER TO PAVING DETAILS REFER TO as per final design intent
AREA DEVELOPMENT PACKAGE AREA DEVELOPMENT PACKAGE 1:50 5130106/ SAIH SHUAIB 1
3012 3012 3012 REGID INSULATION REGID INSULATION
Date: Drawn By: Checked By: Format:
15/Apr/2020 SV JK A0
3 PLAN @+10.000 PART PLAN 5 WALL SECTION 6 WALL SECTION MG4012 DEC DD
Zone : Venue : Discipline : Level No : Dwg No :