You are on page 1of 1

KEY PLAN

T. N.

A
__
90
PREV.
-
_____
____
WI N D THIS DRAWING
43^ P.N. T.N.
150 CRS P. N. 0 1 80
0
43
o

MAKKA

EL.+4.800 270 90

2 Nos-100 DIA GRADE 270


PVC DUCTS (TYP)
E. 67980.000 MAK K A 180

PREV.
WIND

EL.+3.800
EL.+3.700

450

DETAIL _
01
SECTION A
(SCALE 1:25)____
(SCALE ____
1:25)
OPEN RECTANGULAR TELECOM CHANNEL

28"-4FW-54058-Y1EA-NI
_
01

EL +3.150

28"-4FW-54058-Y1EA-NI
EL +3.150
-
_____
____

N. 45666.500
07

N. 45707.325
IP-C- IP-C- IP-C- IP-C- IP-C- NOTES
N.45755.000

N.45671.000
SM02-A3-DW-1173
_____

N 45687.050
0206 0164 FOR NEW INSTALLATION 0205 0163 0204
IP-C- CABLE TRENCH 03

DUCTS
DETAILS, SEE DWG. NOS.
0318 IP-C- 750 W x 1000 DP SM02-A3-DW-1172
SM80-A9-DW-5341 _____ B.O.T. 3.600
0335 1. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
ETHYLENE BATTERY

EXTENT OF DUCT BANK

EXTENT OF DUCT BANK


C

RELEVANT SPECIFICATIONS, STANDARDS AND DRAWINGS.

C
DRAWING LIMIT E.67980.000
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE

30" MANWAYS
E. 67978.145 NOTE-8 E. 67978.144 NOTED.

N 45700.000

N 45698.750

N 45695.300
03

N. 45643.004
N. 45644.909
N. 45646.500

N. 45639.900

N. 45638.500

N. 45630.500
8010
04 3 2
04 04 C DUCT BANK 02 3. ALL CO-ORDINATES ARE IN METRES RELATIVE TO SHARQ
SM40-A9-DW-1502
_____ 01 EL.+ 4.050 DATUM.
SM40-A9-DW-1502
_____
E.67972.775 SM02-A3-DW-1172
_____
SM40-A9-DW-1502
_____

PIV
SU-CF-116 SM02-A3-DW-1171
_____ EL.+ 3.600
03 4. ALL ELEVATIONS ARE RELATIVE TO THE PORT OF JUBAIL
E. 67973.300 E.67956.585 E. 67973.300
DATUM.
SM02-A3-DW-1170
_____ 4PIV-8009 E.67972.400
4PIV-8011 N.45741.650
450 W x 1100 DP
X

X
TYP. E. 67970.940 30"-4FW-54058-Y1EA-NI
E. 67970.900 C
5. REFER TO DRAWING No SM02-A3-DW-1166 FOR U/G

MATCHLINE N.45630.000 - FOR CONTINUATION REFER TO DRG. No. SM42-A9-DW-1525


30"-4FW-54058-Y1EA-NI E.67971.200 EL +3.400 SERVICES GENERAL NOTES.
C 900

X
E.67970.100 EL +3.400

N. 45669.375
1500 6. DETAILED ARRANGEMENT OF U/G PIPING SHOWN ON

N 45707.550
ISOMETRIC DRAWINGS No'S
MATCHLINE N.45760.000 - FOR CONTINUATION REFER TO DRG. No. SM42-A9-DW-1523

C 96"-4CWR-53015-Y1GA-NI
SM53-L6-IM-CFU1-CW53015-1
E.67966.600 EL +900
SM53-L6-IM-CFU1-CWR53015-1
SM54-L6-IM-CFU1-FW54058-01

7. HYDRANT/MONITOR TO BE SUPPLIED BY ETHYLENE CONTRACTOR.


C 96"-4CW-53015-Y1GA-NI

X
E.67962.000 EL +900
8. FOR NEW INSTALLATION DETAILS OF VALVE SEE

IP-C IP-C E. 67959.750 DWG. NO. SM40-A9-DW-1506 (FOR 30"),


C STORMWATER DITCH W = 1200 01 C STORMWATER DITCH W = 1200
SM40-A9-DW-1507 (FOR 20") AND
376 E.67956.590 375 E.67956.570
SM40-A9-DW-1501
_____
SM40-A9-DW-1508 (FOR VENT)
03
C

1000 DIA RCONC PIPE 1000 DIA RCONC PIPE 1000 DIA RCONC PIPE
E. 67954.500 E. 67954.500

N. 45689.250
E. 67954.500
ULTRASONIC METER PIT
REFER TO DRG. NO.
01 01 01
01 SM42-A2-DW-1381

N. 45654.000
N. 45735.000

MONITOR M17
MONITOR M20

IP-C-

N. 45700.000

MONITOR M19
SM40-A9-DW-1502
_____

HYDRANT/
HYDRANT/

SM40-A9-DW-1502
_____ SM40-A9-DW-1502
_____

HYDRANT/
SM02-A3-DW-1170
_____ 0274
C ROUTE D E.67949.000 REFERENCE DRAWING

NOTE 7
TYP.
SU-CF-117 SU-CF-118 SU-CF-119
E.67956.585 E.67956.570 E.67956.570
DRAWING No TITLE
N.45693.350 N.45657.400 N.45643.350

E.67942.250 SM00-A0-DW-1501 U/G SERVICES LAYOUTS KEYPLAN

SM02-A3-DW-1166 GENERAL NOTES AND LEGEND


E.67941.740
SM42-A9-DW-1525 U/G SERVICES LAYOUT

SM42-A9-DW-1523 U/G SERVICES LAYOUT


N. 45735.500

N. 45656.300
E. 67942.000

E. 67942.000
N. 45695.500

E. 67942.000
N. 45759.500

03 CABLE TRENCH 03 SM42-A2-DW-1381 ULTRASONIC METER PIT G.A.

SM02-A3-DW-1173
_____ 500 W x 1000 DP SM02-A3-DW-1172
_____
SM51-A4-DW-1155 ROAD LAYOUT
LTP

LTP

LTP
SM42-A4-DW-1524 PAVING AND GRADING LAYOUTS

EXISTING CABLE TRENCH SM40-A9-DW-1502 UNDERGROUND SERVICES FIREWATER DETAILS

SM02-A3-DW-1171 UNDERGROUND SERVICES PIPE BEDDING DETAILS


S

S
LINE OF EXISTING SECURITY LIGHTING

EXISTING CABLE TRENCH

DRAWING LIMIT E.67920.000

AS-BUILT

03 29.11.17 AS-BUILT AS PER AF-1312023 MSI SAB MAK


02 Z1 02.02.16 AS-BUILT AS PER AF-1112055 MM SPT MAK
0 5m 10m 15m 20m 01 Z1 09/07/09 AS-BUILT SKG KMS

0C S2 18/12/07 ISSUED FOR CONSTRUCTION MAS

0B S1 09/02/07 ISSUED FOR CONSTRUCTION MB CR

01 R2 AM CR CR
FW$FILENAME

08/08/06 ISSUED FOR CONSTRUCTION WITH HOLDS


SCALE 1:200
ISSUED FOR CONSTRUCTION FOR
00 R1 30/01/06 COOLING WATER ONLY AM
FW CLIENT
REV DATE DESCRIPTION BY CHK APP
REV APP
DOCUMENT CLASSIFICATION 2

DOCUMENT SEQ. No 3826 Saudi Basic Industries Corporation


FW$USERNAME CAD FILE:-

FWEL CONTRACT No 1-14-2460 Engineering and Project Management


Jubail. Kingdom of Saudi Arabia
FWEL CAD FILE NAME
SM42-A9-DW-1524
THIS DRAWING DOES/DOES NOT
CONTAIN HAND CHANGES EASTERN PETROCHEMICAL
COMPANY (SHARQ)
APPROVED FOR DESIGN
THIS DRAWING AND ALL INFORMATION THEREON IS THE PROPERTY OF 'EASTERN PETROCHEMICAL COMPANY (SHARQ)' AND SHALL NOT

BE REPRODUCED, COPIED, LOANED, EXHIBITED,DISCLOSED OR USED IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN THAT FOR

REV DATE DISCIPLINE SIGNATURE WHICH IT IS SPECIFICALLY FURNISHED WITHOUT THE PRIOR WRITTEN CONSENT OF 'SHARQ'. THIS DRAWING AND ANY COPIES THEREOF

(PARTIAL OR COMPLETE) SHALL BE RETURNED TO 'SHARQ'

S2 ELEC
PROJECT

S2 INSTR SHARQ 3rd EXPANSION PROJECT


FW$PLOTDATETIME$$

SAFETY
TITLE

S2 PIPING
U/G SERVICES LAYOUT
S2 CONSTRUCTION

SCALE AREA PROJECT NUMBER SIZE


APPROVED FOR CONSTRUCTION
1:200 CF AF-0412059 AO
REV DATE DISCIPLINE SIGNATURE
A.I.D. DRAWING No. SHT. No REV FW REV

Z1 09/07/09 CIVILS SM42-A9-DW-1524 03 Z1

You might also like