NO URAIAN PEKERJAAN
A INTERIOR WORKS
LANTAI 1
FLOOR
1 Floor screed leveling
2 Vynil tile type : 1
3 Vynil tile type : 2
4 Homogenous tile 600 x 600 mm type 1
5 Homogenous tile 600 x 600 mm type 2
6 Ceramic tile 500 x 500 mm type 1
7 Floor stopper
WALL & PARTITION WORKS
8 One sided gypsum partition, h = 3000 mm
9 Double sided gypsum partition, h = 3000 mm
10 Clear glass + frame partition, h = 3000 mm
11 Brick wall, h = 3000, to slab
12 Wiremesh M.10
13 Perbaikan dinding area pantry
14 Perbaikan Step nosing tangga
15 Perbaikan hand railing tangga
WALL FINISH WORKS
16 Wallpaint type 1
17 Wallpaper type 1
18 Wallpaper type 2
19 Sticker sandblast
20 Cornice works
21 Skirting works stainless
22 Backdrop logo - 1
23 Backdrop Queuing machine type 1
24 Backdrop showcase
25 Backdrop TV queuing type 1
26 Backdrop vending machine
27 Backdrop self service
28 Backdrop CS
29 Backdrop locket
30 Backdrop cashier
31 Backdrop TV Display 4 x2
32 Backdrop artwork meeting room - 1
DOOR WORKS
33 Single glass door
34 Single plywood door
35 Single toilet door
36 Camouflage door (800mm) + (pivot) + access card
37 Single steel door , for area Brandkas
38 Rolling Grile Stainles steel
39 Rolling steel Door
CEILING WORKS
40 Flat ceiling gypsum board, h = 3000 mm
41 Flat ceiling gypsum board, h = 3200 mm
42 Cove ceiling gypsum board, h = 3300 mm ; width = 50 mm
43 Main hole size. 600 x 600 mm
FURNITURE WORKS
44 Greeter counter
45 Bench 1
46 Bench 2
47 Bench table
48 Workstation 2 pax
49 Meeting table 4 pax
50 Meeting table 4 pax
51 Locket table
52 Cashier table
53 Administration cabinet
54 Planter
55 CS table
56 Credenza 2
CHAIR & SOFA
57 Manager Chair
58 Staff chair
59 Visitor Chair Manager
60 Break out Chair
61 CS & Guest Chair
62 Meeting Chair
63 Self service chair
TOILET AREA WORKS
64 Waterproofing floor
65 Waterproofing wall, h = 500 mm
66 Ceramic tile 300 x 300 mm type 2, Floor
67 Ceramic tile 300 x 600 mm type 2, Wall
68 Lavatory mirror
69 Plumbing toilet
70 Closet toilet
71 Shower spray
72 Wastafel toilet
73 Tissue holder
74 Floor drain
75 Hand dryer
76 Kran Wudulu
Samsul Yuriandika
(MR Butik Balik Papan) (Team Leader)
TABEL MONITORING PEKERJAAN
FITTING OUT BUTIK BALIKPAPAN
ANTAM Tbk UBPP LOGAM MULIA
BALIKPAPAN
STATUS PEKERJAAN
TARGET
CEKLIS 1 CEKLIS 2 CEKLIS 3
MK PROYEK
PT. UNISYSTEM UTAMA
Yuriandika
(Team Leader)
KETERANGAN
Balikpapan, 01 Agustus 2022
Dibuat oleh,
KONTRAKTOR
PT. VIRAJATI SURYA MANDIRI
Diperiksa Oleh,
Konsultan
Pengawas
PT UNISYSTEM
Riyan Haryanto UTAMA
(Team Leader)
(..........................
......)
Diperiksa Oleh, Diajukan Oleh,
Konsultan Kontraktor
Pengawas PT. VIRAJATI
PT UNISYSTEM SURYAMANDIRI
UTAMA
(..................................
(.......................... ..........)
......)
kan Oleh,
traktor
VIRAJATI
MANDIRI
....................
.......)