Methodology
Meeting/discussions with management staffs
of the utility to collect required data through
interviews, inspection of reports, records
System The average amount of water sold per month was 50,000
m3/month
• The source of the scheme is spring source having a safe yield of 50l/s. In addition to this,
there are also three existing springs, having a total capacity of 12l/s, but it is not connected
with the new system.
• Since the system fully comes to service by August 2015, the production capacity of the new
system for the past three months was 178,125 m3. The yearly production plan is 930,000 m3.
• By 2015, the annual production capacity of the old system was 300,000m3/year. But now,
only, the three-month water production of the new system has become more than 178,000
m3. Which is almost more than half of the previous year total production. Therefore, the new
system has increased the production capacity of the utility by 2.5-fold.
• These springs are found at 7km far from the town (service reservoir).
Reservoir
• There is a 100 m3 wet well near the spring, from where
water is pumped to 1000 m3 new reservoir which is
about 7km far from the source site
• The bottom edge of reservoir has leakage all round
• There is also a chlorine dozing room constructed at the
side of the reservoir
Transmission Line
• From the new spring source about 7km of HDPE
transmission line is laid
• The pipe size of the transmission is 315mm
• The transmission line crosses five kebeles before
entering 1000m3 service reservoirs
• In general, production and transmission of water is
working perfectly
Distribution Line
• When we come to the distribution system, about 30km of different size
distribution pipes are laid on the new system
• Newly laid distribution pipes are connected with the old system and
working perfectly; except, some pipes both from the old and the new
system got burst and the utility has managed it well
• The town is relatively flat in topography, the pipes are interconnected
• No head problem encountered to date
• There are 8 new PFs constructed in the town
• There is no illegal connection
• By 2015 NRW of the utility was 15%
• The utility has no leakage detection mechanism
• Coverage, after the construction of the new system, has become 24/
• Access to water in the town is more than 90%
Years Revenue from Revenue from Total revenue
water sales other source
2015 3,314,410 - 3, 314,410
million Birr million Birr
• The source of the scheme is spring source having a safe yield of more than 800l/s. the spring
is determined to serve both Asasa and Dodola town.
• Since the system fully comes to service by August 2014, the production capacity of the new
system is more than 103,000 m3/month for both towns. But currently, on average, the
monthly production rate of Asasa is around 50,000 m3.
• The spring has very high production capacity. The town has no shortage of water.
Source
The spring has very high production capacity
Financial analysis
Year Personnel & Operation Power Others Chemicals Total
s related and consumption Expense expenses expenditure
expenses Maintenanc expenses
e expenses
201 Estimated
5 - - - - 12,000,00
- 0 million
201 Up 1st
6 quarter
- - - - - 6,001,362
million
Major challenges of the
utility
• At the pumping stations, the anchor blocks are
suspended/or not fixed with the bottom slab and due to
this, the gaskets between those heavy-duty DCI pipes
are leaving their places and the pipes are displacing a
bit from their joints as a result of high pressure from
back water flow
• Leakage around valve chambers, in the system, in
general, was not well fixed and as a result leakage has
encountered almost in all the system
• The pipes in the system are not well installed/welded
• 2500 m3 reservoir, the chlorine dozing system is
installed but it is not working
• The contractor did not provide the final as built drawing
Strength and
weakness of the
utilities
Strength
• All the utilities have all inclusive board members including
youth and women
• All the utilities have created good operation and maintenance
crew that can solve any difficulty in the system
• All the utilities have both annual physical and financial plan
• All the utilities have good organizational set up filled with
professionals who have served the utility for long time
• Sagure town utility has strong commitment to pay the loan
• All the utilities have information about the history of the project
• The monthly operating income of all the utilities, we visited, is
positive
• The utilities working capital is also good
• They all have plan on creating additional revenue other than
water sell
Weakness
• They have weak document handling mechanism,
especially Asasa and Dodola
• Lack of commitment to pay the loan, especially
Asasa and Dodola
• Exaggeration of minor problems
• They don’t have well established office equipment
• They don’t have well documented as built drawing
and system layout that can help anyone to
understand the whereabout of major and minor
components
• The utilities did not start thinking on generation of
income out of sanitation service
Conclusion and
Recommendation
• Since the heads of the city's water and sewage
service organizations are changing and there is a
problem of operational transparency, we
recommend the awareness creation and
monitoring work is strengthened persistently
• If there is a regular discussion forum to solve the
problem of operation and transparency with water
service organizations that use loans, there are
projects under construction, those that are
preparing to return online, those that repay loans
properly, and water and sewage service
organizations that do not repay loans properly
Photography
Utility office at Sagure
Asasa and Dodola pmp satation
Pressure pipe offset at pmp station
Pmp station @ Asasa
Chemical Dozing Room @Sagure