MOMBASA SOUTHERN BYPASS ROAD AND KIPEVU NEW CONTAINER,
TERMINAL LINK ROAD
MOMBASA PORT AREA ROAD DEVELOPMENT PROJECT
Ref KEI/02/CS/PD/1372/04/2.16/Vol.7/FO/mo 28th September 2021
Project Manager,
Fujita Corporation - Mitsubishi Corporation Consortium
CChangamwe Aiport Ré, opposite Shel petro station
P.0..Box 42071-80100
MOMBASA
[Attention: Mr. Lau Jeck Deng ~ Project Manager
Subject: Mombasa Port Area Road Development Project Package 2 : Construction of Mwache
Junction ~ Teunza~ Meza Section
Contract No. KeNHA/RD/00/2807/2019 under JIA Loan KE-P29 and KE-P32
Re _: SHOP DRAWINGS|MWACHE BRIOGE| DECK SLAB REBAR DETAIL AND,
‘SCHEDULE TYPICAL DETAIL OF SLAB REBAR
[REQUEST FOR APPROVAL
Dear sir,
We refer your letter ref. MPARDP2-FITMC-KEI-ENG-SDS-02511.01 dated 14th September 2021,
submitting revised shop drawings for Mache Bridge deck slab rebar detall and schedule, typical
detail of slab rebar.
‘Yours faithfully,
Project Director
End ()
+ Approved Shop Drawings
Ce: Resident Engineer —PK2
Ober
Ta ee Fk Ran PBs 55 pa
‘eine 254 706 dt mapa con"BAR SCHEDULE AND ESTHATED QUANTTES
a
EHENSIONS OUTT CUT
alalalela a alelel
fall]
el 2118) |als)el ola al a
2) |B] alla) al | ella al
$ as Mitsubishi Corporation
FUUITA CORPORATION: MITSUBISHI CORPORATION CONSORTIUM!Q} 2 vessisicarain
FUITA CORPORATION MITSUBS CORPORATION CONSQD + sisrisicarain
[er [Ssarer | FUNTA CORPORATION /MsUsSH |CoRPORATION consonmune >= Galx Mitsubishi Corporation
ITA CORPORATION / MITSUBISHI CORPORATION CONSORTvaso 1
QaewFuLTA. CORPORATION / MITSUISH CORPORATION COW:nase
a z= Soa SEO ar now ORT mT
+ Q} +. visti cei