SCOPE OF WORKS FOR JUNIOR ENGINEER AT SITE-
STORE VERIFICATION:-
v
iii.
a
‘The verifications of JE store as per list provided shall be conducted for
the period as under:-
18 stock register:~ As on date of inspection.
2s stock register:- From 01.07.2017 to 31.07.2018
Inspection team will take all invoices/Gatepass issued to J.E from
01-07-2018 to till date of inspection.
.. The material for which verification shall be conducted, are as under:-
i. All types of Poles.
ii. All types of Cables (e.g. service cable. LT & HT Aerial Bunched Cable,
LT & HT Cable).
iii, All types of Conductors.
iv. Distribution Transformer.
The verification shall be carried out in the following manner:-
Total Stock Balance (scheme-wise) upto 01.07.2017 & as on date of
inspection.
Scheme-wise material received from store centre/other section
holders w.e-f. 01.07.2017 to till date. Matching of invoices & all gate
passes at store centre against the invoices issued to J.E.
Material issued w.e.f. 01.07.2017 to 31.07.2018 scheme-wise/head-
wise
. Comparison of material issued against the on-going & executed works
(semi turnkey & Business Plan) on the basis of executed
estimates/measurement book and mention any short/surplus material
in the report.
Physically (on site) verify the material issued against atleast 5% number
of all orders during the referred period in various developmental
schemes like business plan and work executed against semi-turnkey
orders.
. The material found short/surplus shall be categorically mentioned in
reports.Name of JE:-
Name of Sub-division:-
Name of Division:-
PROFORMA FOR STORE VERIFICATION OF JUNIOR EN
INEER (Distribution)
Annexer-1
(Period:- 01.07.2017 to 31.07.2018)
Material Accounted] Form 01.08.2018 to | Difference of
Material issued
Estimated Quantity for by JEon MB | date of inspection | Material after
Sl. | Name of | Name of. Unit from store center “i j Rena
uel Reoee eel eee — with page no. _|__ total transaction pez
rom 1-5 ti
Qty. Qty. MB No. |PageNo.| Receipt | Issued
= (Rs.) ui . E date of
1 2 3 4 5 6 7 9 10 11 2 3 14Annexer-2
PROFORMA FOR SITE VERIFICATION OF (5%) WORK JUNIOR ENGINEER (Distribution)
Name of JE:-
Name of Sub-division:-
Name of Division:-
(Period:- 01.07.2017 to 31.07.2018)
Material issued
Material Erected on
Material Accounted
Name'of sanctioned Estimated Quantity for on MB of JE with
sl. | work/ place of |Nameof} from store center | site as par M.B. acct Remarks for any
No. | work/Sanctioned | Material difference
scharia ay. [Amount] ay, [Amount] gy, [Amount] weno, | page No.
(Rs) | (R (Rs.)
i 2 3 4 5 é 7 8 9 10 il 2 B