INDUSTRIAL PLOT

TARIFF SUMMARY Updated, February 2023

1. Estate Management Fee USD 0.07/m 2/month of land area


(EMF) • 1st Year – 12 months payment in advance
• Quarter payment in advance for the following years
2. Utilities Tariffs
2.1 Water & Wastewater • Water USD$ 0.5 /m3
Charges • Wastewater USD$ 0.5 /m3 (calculated from 80% of water consumption)
• Payment Term: Payment within 14 days of invoice issue date

2.2 Water Connection Fee • Water Connection USD$ 300 /CMD


• Minimum 30 CMD or the equivalent of USD$ 10,000

2.3 Power Consumption Payment Term: Payment within 14 days of invoice issue date
(Monthly Payment) • Low Voltage (20kVA – 200kVA)
Peak Hour/Off Peak: Rp 1193 /kwh
• Medium Voltage (201kVA – 30,000 kVA)
Peak Hour/Off peak: Rp 1193 /kwh
• High Voltage (>30,000kVA)
Single Tariff: To be determined

2.4 Power Connection Fee • Low Voltage (20kVA – 200kVA): Rp 1275/VA


(One Time Payment) • Medium Voltage (201kVA – 30,000kVA): Rp 650/VA
• High Voltage (>30,000kVA): To be determined
• 15 days Deposit based on consumption capacity charge
(Rp 320,000/kVA)

2.5 Substation Charge • Capacity <1,600kVA: USD 35,000


• Capacity > 1,600kVA: USD 49,000
2.6 Power Capacity Charge • Low Voltage (20kVA – 200kVA) : Rp 37,000/kVA
(Monthly Payment) • Medium Voltage (201kVA – 30,000kVA) : Rp 35,000/kVA
• High Voltage (>30,000kVA): To be determined

3. Telecommunication Selection of providers:


(Monthly Payment) • Indosat (Start from Rp 4,750,000; Installation cost Rp 5,000,000)
• Icon+ (Start from Rp 2,662,538; Installation cost Rp 3,000,000)
• Biznet (Start from Rp 7,500,000; Installation cost Rp 2,000,000)
• Telkom Astinet (Start from Rp 3,939,000; Installation cost Rp 3,250,000)
• Powertel (Start from Rp 2,500,000; Installation cost Rp 3,000,000)

4. Rubbish Collection • Domestic Rubbish collection schedule five days a week


(Monday to Friday)
• Tariff at USD 0.08/Kg
5. Land Title (HGB) Transfer
Approximate 0.5% of Notary Fee based on Transaction Value
Process Fee (Notary)
6. Land & Building Tax
0.1% from taxable object value with reference to NJOP (Kendal)
(Pajak Bumi & Bangunan)
7. Road Cleaning within
construction period Rp. 165,- / m2 / month of land area
(Monthly Payment)
NOTE:
- All charges are subject to 11% VAT (prevailing rate is 11%) & Final tax according to Indonesia Tax Regulations*
(*Note: Except for business entities registered as Pelaku Usaha in Kendal SEZ, there is no VAT charged)
- Power consumption is not subject to 11% VAT
- All payments are quoted in USD must be paid in Rupiah Currency according to Bank Indonesia’s BI Regulation No 17/3/PBI/2015
- Due date for:
Utility: 30 days from the invoice issue date
Water connection and road cleaning: 14 days from the invoice issue date
- All tariff and charges are subject to be reviewed and revised annually