You are on page 1of 1

1 2 3 4 5 6 7 8 9

D D
F
F EE
D

M
A=45.00 A=50.00

ELEVATOR
TOILET
D
11 12 13 14 15 16 17 18 19 20

UP
10 9 8 7 6 5 4 3 2 1

E
ss

TOI
2A.1 A = 286.00
SQM
D D

ADMIN OFFICE
A=40.00 A=42.00
D
2A.2 A=24.00 D

17
16

14 D
13
R - 125 mm 12

UP TO 2ND FLR. B

A=37.00 A=37.00
11 10 9 8 7 6 5 4 3 2 1
C
OPEN A=24.00 D
A=35.00
BELOW
2A.3 A = 42.00
SQM

D
B

A=24.00 DN

A=23.65 A=25.85 A=30.65 A=40.00


PLEASE SEE DETAIL 2A.4
M.1
A= 120.15 SQM MEZZANINE AREA UP
A=37.60
A1

2A.5

A
A=170.00

SECOND LEVEL A
SCALE 1:250

R.A. 9266 SEC. 33


DESIGNER: PROJECT TITLE: OWNER: DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, SHEET CONTENT: DRAWN BY: Author
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE ARE THE INTELLECTUAL
PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH
DATE:
ABEDNEGO ROMEO E. ABLANG PROPOSED COMMERCIAL BUILDING THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO
DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF
AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE,
AS BUILT:
AUG. 15, 2020
CMP
C.M.PEREZ CONSTRUCTION
2F, Pearl Drive Commercial Center, Commonwealth Ave.,
ARCHITECT SKY 360 PLAZA Pluvial Enterprises
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS PROVISION IN ALL CONTRACT DOCUMENTS
AND OTHER INSTRUMENTS OF SERVICE.
FLOOR PLANS
CHECKED BY:
DATE: AUG. 15, 2020
A-4
Quezon City, Metro Manila 1102 PRC NO.: 33290 Validity: 8/30/2020
02-938-8562
LOCATION: NOTE: WRITTEN DIMENSIONS IN THIS DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS, APPROVED BY: CMP
T. Santiago St., Bgy. Lingunan, Valenzuela City
CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AT THE JOBSITE;

caloymperez@gmail.com PTR NO.: 2618560 Date Issued: 1/18/2018 QUEZON CITY THE DESIGNER MUST BE NOTIFIED IMMEDIATELY IN WRITTING OF ANY VARIATIONS FROM THE DIMENSIONS
AND THE CONDITIONS SHOWN BY THESE DOCUMENTS.

TIN NO.: Issued at:


DATE: AUG. 15, 2020
106-788-725 TAGUIG CITY

You might also like