List of PPA Executed by MSEDCL for Purchase of Solar Power as on 31.10.

2022 (Compettive bidding)

Date of Commissioned
Sr.No Project owner Name Name of location Capacity MW Date of Commissioning Voltage Level Name of Substation Name of scheme Rate/unit (Rs.) Remarks/Rate
EPA/MoU/PSA Capacity

M/s.MH Technique Solaire India Village Ratnapur, Tahsil. Manwath, Dist. Parbhani, State
1 20 27.07.2018 17.12.2019 20 33 33/132 KV Pathri S/s 2.71 Competitive Bidding by MSEDCL
Pvt. Ltd – Maharashtra
M/s. Adani Renewable Energy (RJ) Village Rawra, Bhiv Ji Ka Gaon and Hanuwant Nagar, 765/400/220kV Bhadla Pooling
2 200 27.07.2018 21.08.2019 200 220 2.71 Competitive Bidding by MSEDCL
Limited Tal.Bap, District Jodhpur, State-Rajasthan Station
Village Lalsar and Jamsar, Tal. Bikaner, Dist. Bikaner,
3 Renew Solar Power Pvt. Ltd. 250 27.07.2018 27.10.2019 250 220 400 kV Bikaner S/s.- 2.72 Competitive Bidding by MSEDCL
State –Rajasthan
Competitive bidding -RFS
Village Hari Singh Nagar, Akkadhana, Khetusar, Ranjeet
M/s. ACME Chittorgarh Solar 765/400/220kV Bhadla Pooling dated 09.04.2018
4 Nagar, Bagada, Rawara and Ranari, Tehsil Bap , Dist. 250 27.07.2018 01.01.2020 250 220 2.72 Competitive Bidding by MSEDCL
Energy Pvt. Ltd Station
Jodhpur, State – Rajasthan
765/400/220kV Bhadla Pooling
5 Tata Power Renewable Energy Ltd Chhayan-1, Tehsil Pokaran,.Jodhpur, Rajasthan 150 27.07.2018 30.08.2019 150 220 2.72 Competitive Bidding by MSEDCL
Station
M/s Azure Power Thirty Four Pvt. Village Hari Singh Nagar and Bagtawar Nagar, Taluka 765/400/220kV Bhadla Pooling
6 130 30.07.2018 06.09.2019 130 220 2.72 Competitive Bidding by MSEDCL
Ltd Bap , Dist. Jodhpur, State – Rajasthan Station
Village: Shirol and Lahe, Taluka: Shahapur, Dist.: Thane,
7 Krishita Multitrade Pvt.Ltd 50 24.10.2019 33 2.74 Competitive Bidding by MSEDCL
Maharashtra
Village: Mandhopura, Tehsil: Fatehgarh, Dist.: Jaisalmer,
8 M/s.Renew Sun Bright Pvt.Ltd 300 26.06.2019 15.11.2021 300 220 220 KV Fatehgarh-II(PS) 2.75 Competitive Bidding by MSEDCL
Rajasthan
100 MW Cpapacity commissioned
on 03.11.2021 ; 50 MW each on Competitive bidding -RFS
Village-Noorsar, Tal.Bikaner, Dist. Bikaner, State- 400 Kv Switchyard of
9 M/s.Avaada Sunce Energy Pvt.Ltd 350 26.06.2019 07.01.2022 ; 350 400 dated 05.12.2018(Phase- 2.75 Competitive Bidding by MSEDCL
Rajasthan Bikaner(PG) S/s
04.02.2022,25.02.2022, 17.03.2022 II)
and 08.04.2022

50 MW commissioned on 31.03.22,
ACME Heergarh Powertech
10 Village: Bhadla, Tehsil: Bap, Dist.: Jodhpur, Rajasthan 300 22.08.2019 50 MW on 15.04.22, 100 MW on 300 220 220 KV Bhadla-II pooling S/s 2.74 Competitive Bidding by MSEDCL
Private Limited
03.05.22 and 100 MW on 23505.22

11 MSPGCL Koudgaon, Osmanabad 50 21.11.2019 26.02.2022 50 33 220/33 KV Osmanabad MoU 2.92 MoU route
80 MW is commissioned on
M/s. Juniper Green Field Private Shirpur,Arni,Dist Yavatmal(80 MW) and 132 KV Arni and 132 KV Competitive bidding -
12 150 18.09.2020 01.06.2022 and 70 MW 150 132 2.89 Competitive Bidding by MSEDCL
Limited Tighra,Malkapur,Dist Buldhana(70 MW) Malkapur S/s (Phase-IV)
commisisoined on 08.08.2022
13 TP Kirnali Ltd Partur,Jalna 100 16.09.2020 26.05.2022 100 132 220/132/33 KV Parthur S/s 2.90 Competitive Bidding by MSEDCL
100 MW at Pangaon commissioned Competitive bidding -
M/s.Avaada MH Susainable Village Pangaon and Gheradi Dist.Solapur(100 MW) and on 06.08.2022 and 100 MW at (Phase-V) 2.45 (Ad- PPA signed at Ad-Hoc rate subject to final outcome of appeal
14 250 10.08.2021 200 220
Pvt.Ltd Dhamangaon,Dist .Amaravati(150 MW) Dhamangaon is commissioned on Hoc rate) pending before APTEL
03.09.2022
Maharashtra State Power 2.58 (including
15 Dondaicha Solar Park 250 11.01.2022 220 Solar Park Solar Park developed by MSPGCL
Generation Co.Ltd trading margin)
16 ACME Sikar Pvt Ld Bikaner ,Rajasthan 300 04.04.2022 220 Competitive bidding - 2.42 Competitive Bidding by MSEDCL
17 ReNew Dinkar urja Pvt.Ltd Kolayat, Bikaner,Rajasthan 200 04.04.2022 220 (Phase-VI) 2.43 Competitive Bidding by MSEDCL

Contracted Solar Capacity in MW 3300


Commissioned Solar Capacity in MW 2450 850

Solar Contracted Commissioned


Solar Interstate 2430 1930
Large Project Solar Intrastate 870 520
Total 3300 2450

Solar Contracted Commissioned


Solar Competative Bidding 3300 2450
Solar other than Compitative bidding excl. MSKVY 1128 1103
4428 3553
List of PPA Executed by MSEDCL for Purchase of Solar Power as on 31.10.2022 (Non-Competitive bidding)
Date of Rate/unit
Sr.No Project owner Name Name of location Capacity MW Date of Commissioning Commissioned Capacity Voltage Level Name of Substation Name of scheme Remarks/Rate
EPA/MoU/PSA (Rs.)
MSEDCL pays to generator at Rs.3.00 p.u and the generator claims
1 MSPGCL Chandrapur 1 31.08.2009 20.04.2010 1 11 66/11 KV TPS S/s GBI/MNRE Sheme 3.00
Rs.12.00 p.u GBI from IREDA
2 Clover Solar Pvt.Ltd Supa, Baramati 2 10.10.2011 2 33 132/33 KV Janai S/s 17.91
Bundled power to MSEDCL @ Rs.10.50 to 11/- p.u (solar
3 MSPGCL Chandrapur 4 15.10.2010 16.10.2011 4 11 66/11 KV TPS S/s Migration/ JNNSM Sheme 17.91
generators entered with NVVN at Rate Rs.17.91 )
4 Videocon Industries Warora , chandrapur 5 14.10.2011 5 33 220 KV Warora S/s 17.91
5 Dr.Babasaheb Amedkar SSKL Osmanabad 1 20.08.2010 16.08.2011 1 33 33/11 KV Keshegaon 18.41
MSEDCL pays to generators at Rs.18.41/- p.u and claims GBI from
6 Sepset Constructions Ltd Katol 2 20.08.2010 16.11.2011 2 11 33/11 KV Katol S/s RPSSGP/ JNNSM Sheme 18.41
IREDA at Rs.@12.24
7 Citra Real Estate Ltd Katol 2 20.08.2010 16.11.2011 2 11 33/11 KV Katol S/s 18.41
114.4 29.03.13 114.4 Project is delayed and commssioined in FY 2012-13 and 2013-14
8 MSPGCL Sakri, Dhule 05.01.2011 33 220/132/33 KV Shivajinagar MERC Preferential Tariff 17.91
10.6 02.04.2013 10.6 hence rate paid at Rs.15.63 p.u. (114 MW) and Rs. 11.16 p.u

9 MSPGCL Sakri,Dhule 15 15.03.2012 Not commissioned yet Not commissioned yet 33 220/132/33 KV Shivajinagar MERC Preferential Tariff 15.63

Sai Baba Green Energy Power


10 Osmanabad 5 11.02.2013 5 33 33/11 KV Dhanora MSEDCL S/s 8.73
projects Pvt.Ltd Bundled power (solar generators entered with NVVN at bidding
05.01.2012 JNNSM Phase-I, Batch-II
Firestone Trading Company rates i.e Rate Rs.8.73 and 10.95)
11 A'nagar 5 06.11.2012 5 33 132/33 KV Karjat S/s 10.95
Pvt.Ltd
36 19.12.2014 36 220/33 Kv Shirshuphal
12 MSPGCL Shirshufal, Baramati 31.08.2013 33 MERC Preferential Tariff 8.98 at MERC rate
14 31.03.2015 14 33/11 KV Shirshuphal (Temp)
13 MSPGCL Sakri,Dhule 10 29.03.2014 Not commissioned yet Not commissioned yet 33 220/132/33 KV MSETCL 8.98 at MERC rate
Sharda Constructions and
14 Latur 10 28.05.2015 10 33 33/11 KV Panchincholi substation 5.5
corporations Ltd
15 Vishwaj Energy Pvt.Ltd Solapur 10 28.04.2015 10 33 132/33 KV Mohol S/s 5.5 Solar Power generators have PPA with SECI and MSEDCL is
15.12.2014 JNNSM Phase-II (Batch-I) purchasing power from SECI at @ Rs.5.50/- per unit under JNNSM
16 Sunil Hitech Solar (Dhule ) Pvt.Ltd Solapur 5 29.06.2015 5 33 132/33 KV Karajagi S/s 5.5
Phase-II(Batch-I) scheme.
17 IL&FS Development Co.Ltd Madhya Pradesh 15 Nov-15 15 5.5
18 Today green Energy Pvt.Ltd Rajasthan 10 Nov-15 10 5.5
Village-Kombhalne, Tehsil-Akole, District-
19 BHAGERIA INDUSTRIES LIMITED 30 17.06.2017 30 33 132 kV Kombhalane 4.5
Ahmednagar.
Talettutayi Solar Projects Four
20 Vill: Chatgaon, Taluk: Telgaon, Dist: Beed 50 05.08.2017 50 132 132 kV Telgaon 4.5
Private Limited
Orange Suvaan Energy Private
21 Vill: Mhasale, Tal: Sakri, District: Dhule 100 16.06.2017 100 132 220/132/33 kV Shivajinagar 4.5
Limited
Plot No. C-1, Katol MIDC Area, Village
22 Sepset Constructions Limited Dongargaon & Salai, Taluka Katol, District 40 08.05.2017 40 33 132/33 KV Katol S/s 4.5
Nagpur
KRISHNA WINDFARMS Solar Power generators have PPA with SECI and MSEDCL is
23 Vill: Mohri, Dist. Ahmednagar 10 11.08.2017 10 33 132 /33 KV kharda S/s JNNSM Phase-II (Batch- 4.5
DEVELOPERS PVT. LTD. 04.11.2016 purchasing power from SECI at @ Rs.4.50/- per unit under JNNSM
III)
LILO on MSETCL 132 kV Phaltan Phase-II(Batch-III) scheme.
24 NVR Mahasolar Pvt Ltd Mograle, Man, Satara 50 15.07.2017 50 132 4.5
Dahiwadi line
Village: Saltek & Bhamer; Tal: Sakri, District:
25 Gale Solarfarms Private limited 50 10.01.2018 50 33 220/33 KV Jamde S/s 4.5
Dhule
Tornado Solarfarms Private Village: Saltek & Bhamer; Tal: Sakri, District:
26 20 10.10.2017 20 33 220/33 KV Jamde S/s 4.5
Limited Dhule.
Tata Power Renewable Energy
27 Vill-Palaswadi, Taluka- Maan, District Satara. 30 28.10.2017 30 132 132/33 KV Palaswadi S/s 4.5
Limited
Parampujya Solar Energy Private
28 Vill: Sayala, Tehsil: Parbhani, Dist: Parbhani 20 22.02.2018 20 33 132/33 KV Naldurg S/s 4.5
Limited
VIJAY PRINTING PRESS PRIVATE
29 Vill: Wagdari, Tal.Akkalkot, Dist .Solapur 10 24.01.2018 10 132 132 kV Wagdari S/s 4.5
LIMITED
30 SUKHBIR AGRO ENERGY LIMITED Wagdari,Tal.Akkalkot, Dist.Solapur 20 24.01.2018 20 132 132 kV Wagdari S/s 4.5

Solar Edge Power and Energy


31 Mhatargaon Tal.Parli, Dist.Beed 80 09.03.2018/ 23.03.2018 80 132 132 kV Pangri 4.5
Private Limited
Solar Edge Power and Energy
32 Muktainagar, Jalgaon 50 27.03.2018 50 132 132 kV Muktainagar 4.5
Private Limited
Lightsource Renewable Energy
33 Wagdari, Akkalkot, Solapur 50 26.02.2018 and 08.03.2018 50 33 132 kV Wagdari 4.5
Holdings Ltd.
Solar Power generators have PPA with SECI and MSEDCL is
JNNSM Phase-II (Batch-
M/s. JBM Solar Energy Pvt. Ltd. 01.12.2016 LILO on 132 kV Chalisgaon - purchasing power from SECI at @ Rs.4.50/- per unit under JNNSM
34 Bodhare, Chalisgaon, Jalgaon 100 18.04.2018 100 132 IV) 4.5
(M/s. Neel Metal Products Ltd.) Kannad S/C line Phase-II(Batch-IV) scheme.

Fermi Solar Farms Pvt.Ltd


(CANADIAN SOLAR ENERGY
35 Chalisgaon Taluka, Dist.Jalgaon 80 14.04.2018 80 132 220/132 KV Chalisgaon S/s 4.5
HOLDING SINGAPORE 2 PTE.
LTD.)
M/s. MH Parbhani Power Private Dhangar Moha,
36 40 23.12.2018 40 132 132 kV Gangakhed 4.5
Limited. Gangakhed, Parbhani
M/s. Flexirural Urja Jalgaon
37 Limited(Essel Green Energy Gangakhed, Parbhani 20 23.12.2018 20 132 132 kV Gangakhed 4.5
Private Limited)
38 RajBhavan Rajbhavan Pune Complex 1 06.10.2018 15.11.2017 1 11 22/11 KV Vidyapeeth S/s Preferential Tariff 5.13 Preferential Tariff by MERC

Contracted Solar Capacity in MW 1128


Commissioned Solar Capacity in MW 1103

Solar Contracted Commissioned


Solar Interstate 25 25
Large Project Solar Intrastate 1103 1078
Total 1128 1103
List of locations with capacity under 200MW contracted with M/s EESL

S No Circle Premises Location Capacity(MW) Commissioned


1 Nagpur MSEDCL Khapa 0.715 31.08.18
2 Nashik MSEDCL Wavi 0.5 14.09.18
3 Nagpur MSEDCL Butibori (P-7) 0.52 20.09.18
4 Latur MSEDCL Kingaon 0.715 02.12.18
5 Dhule MSEDCL MIDC Dhule 1.17 04.12.18
6 Wardha MSEDCL Anji 0.5 18.12.18
7 Wardha MSEDCL Sahur 0.515 19.12.18
8 Wardha MSEDCL Vijaygopal 0.7 28.12.18
9 Dhule MSEDCL Junvane 0.715 30.12.18
10 Dhule MSEDCL Boradi 0.78 31.12.18
11 Satara MSEDCL Wai MIDC 0.585 23.01.19
12 Aurangabad MSEDCL Chowka 0.455 02.02.19
13 Aurangabad MSEDCL Pachod 0.78 04.02.19
14 Aurangabad MSEDCL Devgaon Rangari 0.585 23.02.19
15 Pune MSEDCL Pait 1 25.02.19
16 Satara MSEDCL Talbid 1.56 26.02.19
17 Nashik MSEDCL Wani 0.5 01.05.19
18 Nashik MSEDCL Lasalgaon 1 01.05.19
19 Wardha MSEDCL Kharangana 0.54 16.05.19
20 Wardha MSEDCL Pimpalkhuta 0.63 16.05.19
21 Latur MSEDCL Bopala 0.715 30.05.19
22 Osmanabad MSEDCL Dhoki 0.63 03.06.19
23 Osmanabad MSEDCL Yedashi 0.5 04.06.19
24 Osmanabad MSEDCL Yenegoor 0.63 05.06.19
25 Amravati MSEDCL Badnera 1 11.06.19
26 Jalna MSEDCL Ner 0.715 11.06.19
27 Amravati MSEDCL Nandgaon Kh. 1 13.06.19
28 Ahmednagar MSEDCL Kolapewadi 0.8 12.06.19
29 Gondia MSEDCL Tiroda 0.585 16.06.19
30 Aurangabad MSEDCL Vihamnadwa, 0.585 06.07.19
31 Kolhapur MSEDCL Halkarni 0.595 09.07.19
32 Kolhapur MSEDCL Shinoli 0.455 09.07.19
33 Kolhapur MSEDCL Gadhinglaj 0.839 10.07.19
34 Beed MSEDCL Umapur 0.49 16.07.19
35 Aurangabad MSEDCL Walluj Garware 0.455 17.07.19
36 Latur MSEDCL Mamdapur 1 18.07.19
37 Nandurbar MSEDCL Khondamali 0.585 26.07.19
38 Beed MSEDCL ADAS 0.49 07.08.19
39 Washim MSEDCL Asegaon 0.5 29.08.19
40 Beed MSEDCL NATHRA 0.56 17.09.19
41 Beed MSEDCL BARDAPUR 0.42 20.09.19
42 Satara MSETCL Mhaswad 5.39 26.09.19
43 Yavatmal MSEDCL Ghonsa (Dahegaon) 0.63 02.10.19
44 Yavatmal MSEDCL Marwadi 0.5 05.10.19
45 Solapur MSEDCL Wadegaon 0.715 11.10.19
46 Amravati MSEDCL Dabka 1 19.10.19
47 Beed MSEDCL GHATNANDUR 0.91 25.11.19
48 Beed MSEDCL Chousala 0.42 26.11.19
49 Akola MSEDCL Pinjar 0.455 18.11.19
50 Wardha MSEDCL Karanja 0.5 27.11.19
51 Latur MSEDCL Deoni 0.63 03.12.19
52 Akola MSEDCL Mana 0.65 06.12.19
53 Aurangabad MSEDCL Shendra 0.8 14.12.19
S No Circle Premises Location Capacity(MW) Commissioned
54 Osmanabad MSEDCL Ieet 0.48 14.12.19
55 Aurangabad MSEDCL Chikalthan 0.4 16.12.19
56 Sangli MSEDCL Darikonur 0.45 16.12.19
57 Solapur MSEDCL Kumbhari 0.85 16.12.19
58 Solapur MSEDCL Bhandishegaon 0.715 19.12.19
59 Solapur MSEDCL Pandharpur link road 0.63 19.12.19
60 Baramati MSEDCL Wadgaon Nimbalkar 1 20.12.19
61 Ahmednagar MSEDCL Ashwi 0.49 23.12.19
62 Nanded MSEDCL Islapur 0.399 24.12.19
63 Nanded MSEDCL Hadgaon 0.4 26.12.19
64 Beed MSETCL Pathra 2.24 04.01.20
65 Amravati MSEDCL Lehgaon 1 08.01.20
66 Baramati MSEDCL Supa 0.85 08.01.20
67 Hingoli MSEDCL Adgaon 0.59 09.01.20
68 Hingoli MSEDCL Sengaon 0.648 10.01.20
69 Nagpur MSEDCL Kuhi 0.52 14.01.20
70 Ratnagiri MSEDCL Kherdi 1 11.02.20
71 Ratnagiri MSEDCL Margtamhane 0.48 18.02.20
72 Ratnagiri MSEDCL Ganekhedpoli 0.48 18.02.20
73 Ratnagiri MSEDCL Kudavale 0.56 19.02.20
74 Parbhani MSETCL Sailu 2.138 27.05.20
75 Nashik MSEDCL Girnare 0.32 08.06.20
76 Baramati MSEDCL Jalagaon 0.4 16.06.20
77 Baramati MSEDCL Katigaon 0.32 22.06.20
78 Baramati MSEDCL Dahitane 0.5 22.06.20
79 Palghar MSETCL Dapcheri 1.6 23.06.20
80 Baramati MSEDCL Redani 0.63 24.06.20
81 Baramati MSEDCL Nimgaon Ketki 0.63 27.06.20
82 Beed MSEDCL Limbganesh 0.32 17.06.20
83 Latur MSETCL Ansarwada 2.5 29.06.20
84 Latur MSETCL Panchincholi 2.25 30.06.20
85 Sangli MSEDCL Bilur 0.422 31.07.20
86 Sangli MSETCL Kasabe Digraj 3.786 07.08.20
87 Latur MSEDCL Shirur Tajband 0.4 08.08.20
88 Satara MSEDCL Wakhari 0.4 12.08.20
89 Satara MSEDCL Bedke vasti 0.4 13.08.20
90 Solapur MSEDCL Karkamb 0.43 15.08.20
91 Solapur MSEDCL Nimboni 0.56 17.08.20
92 WASHIM MSEDCL Umbardabazar 0.5 01.09.20
93 Nanded MSEDCL Himayat Nagar 0.32 07.09.20
94 Latur MSEDCL Lamjana 0.32 26.09.20
95 Osmanabad GP land Mulaj 2.2 02.10.20
96 Osmanabad GP land Shelgaon 4.4 02.10.20
97 Parbhani MSEDCL Rampuri 0.345 09.10.20
98 Nanded MSEDCL Sarkhani 0.64 11.10.20
99 Beed MSEDCL Kada 0.32 17.10.20
100 Parbhani MSEDCL Palam 0.314 22.10.20
101 Latur MSEDCL Shirur Tajband 0.84 07.11.20
102 Nagpur MSEDCL Khaparkheda 2.0001 31.08.20
103 Hingoli GP land Potra 2.612 05.09.20
104 Gadchiroli MSEDCL Dhanora 1.52 22.09.20
105 Nashik GP land Nigdol 0.64 02.11.20
106 Yavatmal MSEDCL Vasant Nagar 0.32 08.11.20
107 Nanded MSEDCL Arjapur 0.40 09.11.20
S No Circle Premises Location Capacity(MW) Commissioned
108 Yavatmal MSEDCL Ralegaon 0.40 21.11.20
109 Ahmednagar GP land Deodaithan 6.40 10.12.20
110 Jalna MSEDCL Sevali 0.42 28.12.20
111 Jalna MSEDCL Hasnabad 0.46 30.12.20
112 Solapur MSEDCL Karandewadi 0.32 30.12.20
113 Solapur MSEDCL Shirval 0.32 30.12.20
114 Hingoli MSEDCL Goregaon 0.538 05.01.21
115 Nanded MSEDCL Nivgha 0.4 15.01.21
116 Ahmednagar GP land Pimpri Kolandar 2.61 25.01.20
117 Nashik GP land Pimpri Anchala 2.73 25.01.20
118 Washim MSEDCL Kamargaon 0.438 29.01.21
119 Yavatmal MSEDCL Jam Bazar 0.48 25.01.21
120 Latur GP land Limbala Dau 2.42 17.02.21
121 Latur MSEDCL Aurad Shahjani 0.4 17.02.21
122 Latur MSEDCL Halgara 0.346 23.03.21
123 Latur MSEDCL Addl.MIDC 0.34 06.04.21
124 Hingoli GP land Dongarkada 2.177 01.05.21
125 Beed MSEDCL Nathapur 0.56 06.08.21
126 Hingoli MSEDCL Aundha 0.373 11.03.21
127 Beed MSEDCL Dhanora 0.56 03.08.21
128 Latur GP land Vilegaon 6.72 05.06.21
129 Wardha GP land Kakaddara 4.2 05.06.21
130 Latur GP land Madansuri 2.4 05.08.21
131 Osmanabad MSEDCL Shirdhon 0.63 10.11.21
132 Latur GP land Dhalegaon 2.992 14.08.21
133 Parbhani GP land Karam 2.088 02.09.21
134 Ahmednagar GP land Velu 2.79
135 Osmanabad GP land Sastur 3.84 10.02.2022
136 Hingoli GP land Ajegaon 2.9 07.10.21
137 Wardha MSETCL Samudrapur 1.4
138 Aurangabad GP land Bhadli-1 5 10.02.2022
139 Hingoli GP land Jawala Bk 2.16 07.10.21
140 Ahmednagar GP land Kawadgaon 8.11
141 Jalna MSEDCL Jalna Pole Factory 0.54 13.03.22
142 Akola MSETCL Barshi Takli 1.17
143 Ahmednagar GP land Sakat 2.7
144 Ahmednagar GP land Kumbhefal 4.2 17.02.2022
145 Ahmednagar GP land Khandavi 4.2
146 Ahmednagar GP land Babulgaon 4.2
147 Ahmednagar GP land Vambori 1.6
148 Ahmednagar GP land Aradgaon 4
149 Ahmednagar MSEDCL Jeur 0.56
150 Ahmednagar GP land Shirapur 1.6
151 Yavatmal MSETCL Dhanki 1.592
152 Yavatmal GP land Jhadegaon /Mulawa 4
153 Beed GP land Lahuri 7
154 Hingoli GP land Mandavi 1.8
155 Gadchiroli MSEDCL Armori 0.435
156 WASHIM MSEDCL Masalapen 0.39
157 Solapur MSEDCL Nimboni additional 0.8
Contracted Capapcity in MW 500
Commissioned Capapcity in MW 165.20
Abstract of Solar Plants under MSKVY
Date of
Contracted
Sr No Name of Solar Developer Rate Rs/kWh Name of District Status of project Status of project commissioning/
Capacity (MW)
SCoD
1 10 3.15 Commissioned Commissioned 31.12.2019
2 10 3.15 Commissioned Commissioned 30.12.2019
Dhule
3 10 3.15 Commissioned Commissioned 29.03.2020
4 Nisagra Renewable Energy Pvt. Ltd 10 3.15 Commissioned Commissioned 07.01.2020
5 10 3.15 Commissioned Commissioned 08.01.2020
Nasik
6 10 3.15 Commissioned Commissioned 16.01.2019
7 10 3.15 Jalgaon Commissioned Commissioned 08.03.2020
8 10 3.15 Commissioned Commissioned 21.01.2020
9 M/s Juniper Green Energy Pvt Ltd 10 3.15 Nasik Commissioned Commissioned 22.01.2020
10 10 3.15 Commissioned Commissioned 21.03.2020
11 10 Aurangabad. Commissioned Commissioned 20.08.2020
12 10 Jalna Commissioned Commissioned 25.08.2020
13 10 Commissioned Commissioned 25.08.2020
Ahmednagar
14 M/s Atnu Solar Power Ltd 10 3.09 - 3.15 Commissioned Commissioned 25.11.2020
15 10 Beed Commissioned Commissioned 08.09.2020
16 10 Nanded Commissioned Commissioned 28.01.2021
17 10 Solapur Commissioned Commissioned 17.10.2020
18 M/s Aurinko Energy Pvt. Ltd 10 3.11 Solapur Commissioned Commissioned 22.10.2020
Vijay m Mankari Proprietor Mankari
19 2 3.29 Latur Commissioned Commissioned 02.08.21
Petroleum
20 Ask Green Energy Pvt Ltd 2 3.29 Latur Commissioned Commissioned 05.08.21
Dinesh D Mane partner Satya saibaba
21 2 3.29 Latur Commissioned Commissioned 24.07.2021
Construction
Venkat M Garje Proprietor Garje Steel
22 2 3.29 Latur Commissioned Commissioned 17.04.2021
Industries
Laxman N More propreitor Ganga Mauli
23 2 3.29 Latur Commissioned Commissioned 24.07.2021
Solar Energy
Vivek M reddy proprietor Reddy
24 2 3.29 Latur Commissioned Commissioned 17.04.2021
Construction
Harikishan R malu proprietor Shrihari
25 2 3.29 Latur Commissioned Commissioned 27.8.21
traders
Ramprasad B Ghodke Partner M/s R B
26 2 3.29 Parbhani Commissioned Commissioned 31.8.21
Ghodke

Ramesh N Amberkhane proprietor


27 2 3.29 Latur Commissioned Commissioned 05.8.21
Ganesh Dall Industries

PBG forfieted .
PPA Termination notice
28 M/S tepsol Pvt Ltd 50 3.13 Parbhani Termination under
issued
Process

PBG forfieted .
PPA Termination notice
29 M/s Kintech Pvt Ltd 5 3.13 Dhule Termination under
issued
Process

Financial closure (FC) not


30 M/s Kosol Energie Pvt Ltd 10 3.15 Dhule 22.10.2021
yet completed. Requested
Commissioned extension in FC & SCoD
Financial closure not yet
31 M/s Kiran Renewables 5 3.14 completed. Requested 01.04.2022
Pune Commissioned extension in FC & SCoD
Financial closure not yet
Kailash S Agarwal Partner Shubhlaxmi
32 2 3.29 Latur completed. Requested 07.11.2021
Foods
Commissioned extension in FC & SCoD

33 M/s Eirene naval systems Pvt Ltd 15 3.29 Osmanabad FC completed. Requested 07.11.2021
Commissioned extension in SCoD
Financial closure not yet
Padamkumar J Ajmera Partner Jai Sai
34 2 3.29 Osmanabad completed. Requested 04.01.2022
Construction
Commissioned extension in FC & SCoD

35 Ashok A Kakade 2 3.28 Parbhani FC completed. Requested 07.01.2022


Commissioned extension in SCoD
36 20 3.30 Ahmednagar 23.08.21
37 21 3.30 Amravati 23.08.21
Date of
Contracted
Sr No Name of Solar Developer Rate Rs/kWh Name of District Status of project Status of project commissioning/
Capacity (MW)
SCoD
38 6 3.30 Aurangabad 23.08.21
39 10 3.30 Bhandara 23.08.21
40 2 3.30 Buldhana 23.08.21
41 4 3.30 Jalna 23.08.21
42 17 3.30 Kolhapur Financial closure (FC) not 23.08.21
43 M/s MSPGCL 4 3.30 Nagpur-R Commissioned yet completed. Requested 23.08.21
44 7 3.30 Nanded extension in FC & SCoD 23.08.21
45 23 3.30 Sangli 23.08.21
46 12 3.30 Satara 23.08.21
47 12 3.30 Wardha 23.08.21
48 12 3.30 Washim 23.08.21
49 24 3.30 Yavatmal 23.08.21
50 5 3.30 Chandrapur 23.08.21

M/s Ajit Kantilalji Sisodiya


51 2 3.29 Aurangabad FC completed. Requested 07.11.2021
M/s Kalika Ginning & Pressing Pvt Ltd
Commissioned extension in SCoD

52 M/s Nature International Pvt Ltd 10 3.3 Solapur FC completed. Requested 07.11.2021
Commissioned extension in SCoD

53 M/s Sunfree Paschim Pvt Ltd 20 3.3 Solapur FC completed. Requested 07.11.2021
Commissioned extension in SCoD

54 M/s Eirene naval systems Pvt Ltd 10 3.29 Solapur FC completed. Requested 07.11.2021
Commissioned extension in FC & SCoD

55 Chandrakant Bastesing Raghuvanshi 2 3.29 Nandurbar FC completed. Requested 07.11.2021


Commissioned extension in FC & SCoD

Financial closure not yet


56 M/s Kosol Energie Pvt Ltd 10 3.3 Dhule Commissioned completed. Requested 07.11.2021
extension in FC & SCoD

Financial closure not yet


57 M/s Greak Infra Environs Pvt Ltd 5 3.29 Jalna Commissioned completed. Requested 07.11.2021
extension in FC & SCoD
58 M/s MSPGCL 2.86 3.3 Ahmednagar Commissioned 01.06.2022
59 REDDY CONSTRUCTION 3 3.05 Latur Commissioned 05.08.2022
Total Contracted capacity by MSEDCL for
561
MSKVY in MW
Total Commissioned cappacity MSEDCL for
248.86
MSKVY in MW
Abstract of Solar Plants under MSKVY through PSA with MSPGCL

Date of
Contracted
Sr No Name of Solar Developer Rate Rs/kWh Name of District Status of project Commissionning/
Capacity (MW)
SCoD
1 M/s Waacox 2 2.94 Ralengansiddhi, Ahmednagar commissioned 24.08.2018
2 M/s Waacox 2 2.97 manjarda, yavatmal commissioned 24.08.2018

3 M/s Wacoox 16 3.05 Amravati commissioned 11.01.2021

4 Gro-Solar 7 3.10 Dhule commissioned 24.06.2021


5 10 3.10 Jalna commissioned
6 10 3.10 Parbhani commissioned
7 10 3.10 Parbhani commissioned
8 10 3.10 Wardha commissioned
9 10 3.10 Jalna commissioned
10 Karnataka Resco 10 3.10 Hingoli commissioned
11 10 3.10 Nanded commissioned
12 10 3.10 Hingoli commissioned
13 10 3.10 Hingoli commissioned
14 10 3.10 Osmanabad
commissioned
15 Shri shri shetakari 2 2.93 Nasik No progress Apr-21

16 9 3.05 31.08.2022
Shivajinagar, Sakri, Dhule WIP

17 8 3.05 31.08.2022
Malpur, Sakri,Dhule WIP

18 8 3.05 31.08.2022
Bhutyane, Chandwad, Nashik WIP

19 5 3.05 31.10.2022
Kini, Akkalkot, Solapur WIP

20 5 3.05 31.10.2022
Sawangi Mahalsa, Jintur, Parbhani WIP

21 5 3.05 31.10.2022
Vadangali Sinner Nashik WIP

22 2 3.05 30.01.2023
Kheldari Chandwad Nashik WIP

23 2 3.05 30.01.2023
Budh Khatav Satara WIP

24 2 3.05 30.01.2023
Sandas Kalamnuri Hingoli WIP

25 2 3.05 30.01.2023
Thodaga Ahmedpur Latur WIP

26 2 3.05 30.01.2023
Warvati Ambejogai Beed WIP

27 2 3.05 30.01.2023
Lanji Ahmedpur Latur WIP

28 2 3.05 30.01.2023
Ghordari Sengaon Hingoli WIP

29 2 3.05 30.01.2023
Pimpaldari Gangakhed Parbhani WIP

30 2 3.05 30.01.2023
Asegaon Jintur Parbhani WIP

31 2 3.05 30.01.2023
Bhojapur Kuhi Nagpur WIP

32 3 3.05 30.01.2023
Kumbhephal Kej Beed WIP

33 3 3.05 30.01.2023
Lahul Madha Solapur WIP

34 2 3.05 30.01.2023
Sonayal Jat Sangli WIP

35 4 3.05 30.01.2023
Umadi Jat Sangli WIP

36 4 3.05 30.01.2023
Bhedgaon, Gadhinglaj Kolhapur WIP

37 4 3.05 30.01.2023
Nizampur Sangola Solapur WIP

38 5 3.05 30.01.2023
184 MW Phase-I Lahul, Madha Solapur WIP
M/s Waree Electricals
39 9 3.05 30.01.2023
Borgaon Barshi Solapur WIP

40 3 3.05 30.06.2023
Chincholi Mali Kej Beed WIP

41 7 3.05 30.06.2023
Vadalibhoi Chandwad Nashik WIP

42 7 3.05 30.06.2023
Nimgaon Sinner Nashik WIP

43 3 3.05 30.06.2023
Nathara Parli Beed WIP

44 3 3.05 30.06.2023
Waghe Babhulgaon Kej Beed WIP

45 4 3.05 30.06.2023
Mangrulzanak Risod Wasim WIP

46 5 3.05 30.06.2023
Yeoti yavatmal Yavatmal WIP

47 5 3.05 30.06.2023
Anjangaon Bari Amravati WIP

48 5 3.05 30.06.2023
Nandgaonpeth-2 Amravati WIP

49 4 3.05 30.06.2023
Utagi Jat Sangli WIP

50 5 3.05 30.06.2023
Talni Hadgaon Nanded WIP

51 2 3.05 30.06.2023
Yerad Yavatmal WIP

52 4 3.05 30.06.2023
Vadgaon Pangu Chandwad Nashik WIP

53 3 3.05 30.06.2023
Budhali Chandur rly Amravati WIP

54 3 3.05 30.06.2023
Sirso Murtizapur akola WIP

55 6 3.05 30.06.2023
Khed Khandala Satara WIP

56 4 3.05 30.06.2023
Shamboli Mudkhed Nanded WIP

57 5 3.05 30.06.2023
Shiradhon Kalamb Osmanabad WIP

58 2 3.05 30.06.2023
Uklhad Parbhani WIP

59 5 3.05 30.06.2023
Loni Takali Nandgaon Amravati WIP

60 3 3.05 30.06.2023
Hasuri, Nilangana, Latur WIP

61 2 3.05 30.06.2023
Uklhad Parbhani WIP
62 2 3.11 Kautha,Tal.Shrigonda WIP 30.01.2023
63 2 3.11 Shedgaon,Tal.Shrigonda WIP 30.01.2023
64 3 3.11 Ingalgi,Tal.South Solapur WIP 30.01.2023
65 5 3.11 Dahiwali,Tal.Madha WIP 30.01.2023
66 5 3.11 Pangaon,Tal.Barshi WIP 30.01.2023
67 2 3.11 Gaygavhan,Tal.Sangola WIP 30.01.2023
68 10 3.11 Dadpur,Tal.Mohol WIP 30.01.2023
69 5 3.11 Dongargaon,Tal.Chandwad WIP 30.01.2023
70 5 3.11 Ekrukhe,Tal.Chandwad WIP 30.01.2023
71 2 3.11 Khadke,Tal.Bhusawal WIP 30.01.2023
72 3 3.11 Sonale,Tal.Jamner WIP 30.01.2023
100 MW EESL
Pimpalgaon
73 31.03.2023
8 3.11 bk(Hareshwar),Tal.Pachora WIP
74 6 3.11 Ringangaon,Tal.Erandol WIP 31.03.2023
75 2 3.11 Lakhangaon, Tal.Ambegaon WIP 31.03.2023
76 3 3.11 Loni, Tal. Ambegaon WIP 31.03.2023
77 4 3.11 Jadarboblad, Tal. Jat WIP 31.03.2023
78 2 3.11 PimpriGhumat,Tal.A’nagar WIP 31.03.2023
79 9 3.11 Ranjani, Kavthe- Mahakal WIP 31.03.2023
80 5 3.11 Kerewadi, Kavthe-Mahakal WIP 31.03.2023
81 9 3.11 Mhaisal, Miraj WIP 31.03.2023
82 8 3.11 Arewadi, Kavthe-Mahakal WIP 31.03.2023

Total Contracted capacity by


413
MSEDCL for MSKVY in MW

Total Commissioned cappacity


127
MSEDCL for MSKVY in MW
List of Solar projects contracted under KUSUM Scheme

Contracted Rate Name of


Name of Solar Developer Status of project Status of project
Capacity (MW) Rs/kWh District
Purushottam Profiles Pvt Ltd 2 3.09 Jalna PPA Signed Jalna
2 3.09 Jalna PPA Signed Jalna
2 3.09 Washim PPA Signed Washim
2 3.09 Amravati PPA Signed Amravati
Grampanchayat Mirajgaon 1 3.1 Ahmednagar PPA Signed Ahmednagar
Dipak Raghunath Patil 0.5 3.1 Jalgaon PPA Signed Jalgaon
G N Electricals 2 3.1 Solapur PPA Signed Solapur
Laxmanrao Jijabrao Deshmukh 1 3.1 Buldhana PPA Signed Buldhana

MANOJ RATILAL BHIMJIYANI 1 3.1 Buldhana PPA Signed Buldhana


Meghali Umesh Surve 2 3.1 Akola PPA Signed Akola
Ravikant Panditrao Kalane 1 3.1 Yavatmal PPA Signed Yavatmal
SHILPA PANKAJ MUNDHADA 1 3.1 Buldhana PPA Signed Buldhana
Sumant Mahajan 2 3.1 Akola PPA Signed Akola
Suresh Narayan Kalpande 2 3.1 Buldhana PPA Signed Buldhana
Majid Rafik Shaikh 0.5 3.1 Aurangabad PPA Signed Aurangabad
Total 22