SECTION 1. INTRODUCTION TO THE TECHNICAL PROPOSAL 2
1.1 Proposal Back ground. . . . . . 2
1.2 Technical Proposal Structure. . . . . 2
SECTION 7. APPENDICES. . . . . . . . 40
7.1 Company Owned Equipment. . . . . 40
__________________________________________________________________________
Technical Doc / BEKELE BURUSA General Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 1
INTRODUCTION TO TECHNICAL
PROPOSAL
PAGES
1
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 1
INTRODUCTION TO TECHNICAL
PROPOSAL
According to your invitation of your bid for the construction of Oromo National
Regional State Bureau Of Water, mines And Energy Resource Development
(OWERDB) center projects , “which includes construction of: Nuunuu Town
Based on this, the company has prepared this proposal for the provision of Construction
Services of the projects in response to Qualification document provided by your organization.
The proposal provides information in support of Bekele Burusa GC and wwc technical
capabilities, qualifications and describes the technical approach to the task; the financial
proposal is submitted in original financial offer envelope.
The Technical proposal, which is presented in this and subsequent sections of this
document, has been prepared in accordance with the requirements of the Bidding Document,
and we believe it is fully responsive to its stipulations.
2
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 2
PAGES
2.1 General. . . . . . . 5
2.2 Vision. . . . . . . . 6
4
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 2
1.1 General
Bekele Burusa GC & WWC is a young employee owned company established to
involved in great spectrum of engineering activities, mainly in Water Supply design
and construction, Road structure design, Civil structure design and construction, but
Specialized in water structures including: - Source identification, Head works, Spring
development, Reservoirs construction, Pipe line design & construction, different Size
of Collection Chamber & reservoir construction, Treatment plant and etc. Electro-
mechanical Work for Water Supply Projects and other water related Structures,
bridge, culverts and water conveyance structure, irrigation & Drainage structures and
other civil construction. The company members, who are well experienced
professional in Water supply design & construction, Irrigation and drainage design &
construction, Buildings, Road and Bridge Structure and Electro Mechanical
Engineering activities for all civil Work and other construction related activities
including project identification, formulation, appraisal and Post monitoring evaluation.
N.B: You can refer details of experience for the staffs from
their curriculum vitae ( CV’S)
Bekele Burusa GC & WWC established by well-experienced professional combination
of Owners & Employers
5
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
1.2 Vision
Our vision is to be a reputable engineering & construction company in the country to
provide outstanding solution for a wide range of Water, Civil, Road and Electro
mechanical construction works with Specialization of Water Resource by applying the
most updated professional skills, quality and time efficient standard procedural
practices.
6
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Pickups ( Owned)
1- Double Cabin D4D New Model
8
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
o Source Works
- Weir and Diversion work for water Supply and Irrigation Schemes.
Electro mechanical Work for water Supply Schemes.
- Pump Installation for Surface and Ground Water.
- Generator installation & other Electro mechanical work.
SECTION 3
PAGES
10
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 3
BURESA had visited the project areas and existing condition of the projects for
evaluation of existing condition of Project area, to have first hand information of the
actual condition of the site, local material source, Access of the road of the project
and other relevant inf1`wormation which is helpful for preparation of the technical
proposal and price quotation that will be undertaking after this pre qualification.
Accordingly, the findings and data collected during the exciting project visit are
summarized in further.
The construction site is located at Kelam Wollega , Nunuu Town, Water Supply
Project the West Ethiopia During the site Visit, the team of the contractor assessed
the access road condition to the project site, construction material availability and
other related information including availability of water for intended works to use the
project efficiently.
11
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
The major part of the project area in the vicinity was grass land, hot area, Some Part
Of around nuunuu town forest and others.
3.1.3 Geology
According to the Geological Map of Ethiopia, 2008, the geological formation of the
project area is dominated by clay and metamorphic rock complex And
There are construction stone source that will be used for masonry works, at nearby
vicinities of the sites.
b. Sand
There is sand source suitable for water work construction in the project areas.
The technical proposal we are adopting for the project is fully based on detail
examination of the sites and through understanding of the given Qualification
documents and Information we obtain. Our proposed method for the efficient
execution of the project is as described hereunder;
The Bekele Burusa WWC & GC Project team will be organized independently as
“Nuunuu Town Water Supply Project” Construction Project backed by suitably
qualified professional engineers from head office of the Contractor, who are well
12
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Up on receiving the Notice to commence the works the project activity will be
commenced by collecting complete set of Project Documents and project Information,
followed by organizing and equipping of the project team with the necessary
manpower & construction equipment within mobilization period of 5 days.
Within the time of project commencement period which takes place within 5 days
after site hand over of the project, the core project staff including General Manager,
Project Manager, Construction Forman & Chief Plumber will mobilize to the project
site for assessment of the project, site preparation and other preliminary activities.
At this stage, the Project Manager and his core staff will meet with the local
respective authorities to conduct Community awareness pertaining to the project area
such as land acquisition and locating campsite and locally available construction
material utilization. Based on this information, the Project team will prepare the
practical work schedule, which eventually submitted to your organization as a Final
work schedule.
Surveying Crew of the project will start surveying works immediately after site
handover of the project, such as: set Control Points and adequate bench marks for all
structures at the first place and finally supervise the designed level and layout of the
project components.
13
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Detail Work follows will find on. “Work flow chart after Site Hand
Over”
14
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Based on the Nature of the Project the Employer and our Method Statement for the
tackling of the assignment, we have prepared a work program for a total allocated
project completion days specified in the special condition of contract including fifteen
(15) days mobilization period.
15
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
16
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 4
Statement of Qualification
Pages
4.1 Legal Status. . . . . . . . 23
4.3 Equipment. . . . . . . . . 30
4.4 Organization. . . . . . . . 31
__________________________________________________________________________
Technical Doc / BEKELE BURUSA General Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 4
Statement of Qualification
4. STATEMENT OF QUALIFICATION
23
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
4.2 Manpower
The founding members of Bekele Burusa GC are also employees of company are,
water supply Engineer ( Hydraulic, Water resource, Civil Engineering and Irrigation
engineers ), civil Engineer, Mechanical Engineer, Building Engineer, Electrical
Engineer and other experts with intensive experience in there respective fields of
specialization, designing, construction and Supervision of civil works.
I. Ato Bekele Burusa wwc & GC is the company owner. Ato Bekele Burusa is a
graduate of BSc degree in Civil Engineering form ADAMA SCENCE AND
Technology University(ASTU) Institute in 2012 EC.
24
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
II. Ato Meyomi Fayisa is one of the company employees and he has BSC degree
in Construction Engineering from Arba Minch Water Technology in 2007 EC. He
involved major building and Irrigation projects of the country;
Ato Meyomi was involved also in several rural community driven project identification
& implementation for the last 3 years experience in further civil construction and
designing works and participated in several water resources Construction and civil
construction as construction engineer, site engineer & resident engineer.
For the last three years has served in Ethiopian Rural Self Help Association as a
Water and Construction Engineer on Water Supply and Irrigation projects, which has
a project cost of 2.050 Billion ETB.
CV.
25
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
III. Ato WONDESAN Wondimu is the Site Engineer. Ato WONDESAN Wondimu is a
graduate of BSc degree in Civil Engineering form ADAMA SCENCE AND
Technology University(ASTU) Institute in 2014 EC.
26
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
III. Ato Yared Girma Ayela is one of the company employees. Ato Yered Girma
Ayele Nekemte TVET College is a graduate of Diploma in Hydraulic Engineering form
haramaya University Civil Engineering Institute at 2013 gc, .
Wubshet has 12 years intensive experience in rural and town water supply projects,
Road, Power Tower, Building projects and Irrigation projects.
For the 1st two years of his career he was engaged in project identification, &
Formulation community driven project appraisal and preparation Construction project
implementation, design and supervision including Community mobilization,
promotion, and organization for project Sustainability in Oromia Water Resources
Bureau at Oromia Region.
After he leaves OWRB, Ato Yered Girma was served Light Building Construction
Enterprise for two years at the level of Construction engineer and Engineering
section head in: Ethio-Dgibuti Power Project, Project cost.
27
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
IV. Ato Eshetu Burusa:- is one of the company employees. Since 2007EC, for the
last 2 years he was intensively engaged in countries major Drainage Work projects
in almost all regions and every corner of the country. The detail descriptions of the
projects are listed in his CV attached herewith in the document.
28
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Ato Solomon Bogela Duresa has served his previous company - Surveying
Construction Enterprise on different positions, at various Water Supply, Building &
Irrigation Projects from Junior Electro-mechanical expert up to senior levels.
The water supply projects he engaged have ranged from medium to large scales and
the sources of the water supply was both Ground water & Surface water.
29
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SINIOR PROFESSIONALS
FOR
Ifa Basi SSIP PROJECT CONSTRUCTION
Title of position:
CONSTRUCTION ENGINEER
1 Name of candidate:
ENG. Bekele Burusa
30
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
31
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
32
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
33
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
34
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Year of
Specia.
Personnel Qualification Experienc Position Remarks
e
Senior Professionals & Company Owners
Eng. BEKELE BURUSA BSc Civel 6Years CIVIL Construction Owner
Engineering Engineer Engineer
Eng. Abera Nagash BSc Water 10 Years Water supply Technical Employee
Gudata Resource, Civil & Irrigation Manager & Site
Engineering project magt. Engineer
Forman
Ato Eshetu Burusa Diploma 8 Years Construction Senior Employee
& Building Construction
Forman
Surveying Team
Ato SOLOMON Diploma 7 years Water supply Surveyor Employee
BOGALA and Road,
Drainage and
living ad top
grapy
Construction Team
Ato Meyomi Fayisa Bsc- Degre 4 Years Pond, Chief Plumber Employee
building,..etc
Ato Wondessan Bsc.Degree 5Year Road,Draina Site Engineer Employee
Getachow ge And
watter
Supply
35
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Install. mechanical
Team Leader
Pickups ( OWNED)
1- Double Cabin D4D New Model
Computers(laptops and desktops) for office work with professional works for
design such as SAP, Epanet 2w, HCALC, AutoCAD, Civil-CAD, Hydro-
geological Modeling, Geo-Physical Survey, GIS, and other Engineering related
software.
37
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
38
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
4.3 ORIGANIZATION
Organizational Chart
General Manager
Ex. Secretary
Dis.
Work Shop .
Power of Attorney of Signatory of Bid has been fully delegated to the Company General
Office Address:
2 Adama ,Tikur Abay
39
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Fax: Tele:0910 37 73 98
4 +251919284862
40
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 5
Company Experience
PAGES
5.1 Company Experience. . . . 34
41
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 5
Company Experience
5. COMPANY EXPERIENCE
Although, Bekele Burusa is a recently established company and has managed to
secure more than 13 projects and all are successfully accomplished. In its short
period of experience the company is increasingly winning the confidence of its clients
through is providing dependable professional services.
42
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
43
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
44
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 6
Financial Capability
PAGES
SECTION 6
45
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Financial Capability
6.1 FINANCIAL CAPABILITY
The Financial Information of the Company that demonstrates its capability to meet
the requirements stated in the Tender Questionnaire.
The summarized actual assets and liabilities in Eth. Birr for the previous Five years.
Based on known commitments is as follows:
The summarized actual assets and liabilities in Eth. Birr for the previous three years
based on known commitments is as follows:
Reference is made to the copy of Audited Balance Sheets of the Company attached
as an Financial Statement & Asset of this document.
Our proposed sources of financing to meet the cash flow demands of the project, net
of current commitments is as indicated hereunder:
46
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
No.
Dat Name of Amount of the Project
e The
Project
1 29/01/2015 CREC Addis- Ababa Mieso Rail way 1,171,480
Project
2 02/2/2015 CREC Addis- Ababa Mieso Rail way 1,654,123.48
Project.
3 07/7/2016 East Harerge Zone Wara Alii Pond 1,544,869.86
Gursum Woreda Pest
4 7/8/2016 East Harerge Zone Wara Alii Pond 1,705,850.86
Gursum Woreda Project
5 22/6/2016 East Harerge Zone Wara Alii Pond 1,009,987.66
Gursum Woreda Project
6 08/11/2016 East Harerge Zone Wara Alii Pond 536,681.30
Technical school
Technical school
Technical school
18 Technical school
Engineering )
Engineering )
Engineering )
27 29,12/2017 CTCE (china Construction 1,150,000
48
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Engineering )
Engineering )
Engineering )
Engineering
Co.LTD(Ethiopia)
32 18/12/2018 CTCE (china Construction 23,000,000
Engineering )
33 10/01/2019 China state Construction 8,000,000
Engineering
Retaining Wall
Energy Office
Energy Office
Retaining Wall
Energy Office
Retaining Wall
49
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
Research Center.
Research Center
Research Center
Research Center
Research Center
Research Center
No. of Years 5
50
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
51
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
6.1
52
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
SECTION 7
Appendices
pages
7.1
Company Owned
Equipment Document
54
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
7.2
LITIGATION
HISTORY
56
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018
NONE