GABION & CHECH DAM PROJECT DECE.

10,2018

TIOTABLE CONTENT
PAGE
SECTION 1. INTRODUCTION TO THE TECHNICAL PROPOSAL 2
1.1 Proposal Back ground. . . . . . 2
1.2 Technical Proposal Structure. . . . . 2

SECTION 2. DESCRIPTION OF THE COMPANY. . . . . 5


2.1 General. . . . . . . . 5
2.2 Vision. . . . . . . . 6
2.3 Company Scope of Service. . . . . 8

SECTION 3. UNDERSTANDING OF WORKS & SCHEDULES. 11


3.1 Understanding of Project. . . . . . 11
3.2 Method of Working for Water Supply Project . . 12
3.3 Work Schedule. . . . . . . 15
3.4 Man Power & Equipments Schedule . . . 19

SECTION 4. STATEMENT OF QUALIFICATIONS. . . . 23


4.1 Legal Status. . . . . . .23
 Work Permits & Legalities. . . . .
4.2 Man Power / Key Personnel. . . . . 24
4.3 Equipment & Vehicle . . . . . 30
4.4 Organization. . . . . . . 31
4.5 Power of Attorney. . . . . . . 32

SECTION 5. COMPANY EXPERIENCE. . . . . . 34


5.1 Company Experience. . . . . . .34
5.2 Completed Project Profile(Conducted Work Activities ) 34
5.3 Project at Hand. . . . . . . 36
5.4 Performance Certificate & Recommendation Letters .

SECTION 6. FINANCIAL CAPABILITY . . . . . 38


6.1 Financial Capability . . . . . 39
6.2 Current Cash at Hand. . . . . . 39

SECTION 7. APPENDICES. . . . . . . . 40
7.1 Company Owned Equipment. . . . . 40

__________________________________________________________________________
Technical Doc / BEKELE BURUSA General Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

7.2 Summary o f Completed Project . .. . . 41


7.3 CV of Key Company Personnel. . . . 42

SECTION 1

INTRODUCTION TO TECHNICAL
PROPOSAL

PAGES

1.1 Proposal Back ground. . . . . 2

1.2 Technical Proposal Structure. . 2

1
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 1

INTRODUCTION TO TECHNICAL
PROPOSAL

1 INTRODUCTION TO THE TECHNICAL PROPOSAL

1.1 PROPOSAL BACKGROUND

According to your invitation of your bid for the construction of Oromo National
Regional State Bureau Of Water, mines And Energy Resource Development
(OWERDB) center projects , “which includes construction of: Nuunuu Town

Water Supply Project Construction of from Reservoir, supply of pipe &

Fittings Civil Work Constraction.

Based on this, the company has prepared this proposal for the provision of Construction
Services of the projects in response to Qualification document provided by your organization.

1.2 TECHNICAL PROPOSAL STRUCTURE

The proposal provides information in support of Bekele Burusa GC and wwc technical
capabilities, qualifications and describes the technical approach to the task; the financial
proposal is submitted in original financial offer envelope.

The Technical proposal, which is presented in this and subsequent sections of this
document, has been prepared in accordance with the requirements of the Bidding Document,
and we believe it is fully responsive to its stipulations.

2
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

THE TECHNICAL PROPOSAL IS DIVIDED INTO THE FOLLOWING SECTIONS.


SECTION 1. INTRODUCTION TO THE TECHNICAL PROPOSAL
1.1 Proposal Back ground.
1.2 Technical Proposal Structure
SECTION 2. DESCRIPTION OF THE COMPANY
2.1 General.
2.2 Vision.
2.3 Company Scope of Service.
SECTION 3. UNDERSTANDING OF WORKS & SCHEDULES.
3.1 Understanding of Project.
3.2 Method of Working for Water Supply Project
3.3 Work Schedule.
3.4 Man Power & Equipments Schedule
SECTION 4. STATEMENT OF QUALIFICATIONS.
4.1 Litigation. .
 Work Permits & Legalities.
4.2 Man Power / Key Personnel.
4.3 Equipment.
4.4 Organization.
4.5 Sample of Project Origination.
SECTION 5. COUMPANY EXPERIENCE.
5.1 Completed Project.
5.2 Completed Project Profile
5.3 Project at Hand.
5.4 Performance Certificate & Recommendation Letters
SECTION 6. FINANCIAL CAPABILITY
6.1 Financial Statement & Assets.
6.2 Current Cash at Hand
6.3 Monthly Bank Transactions.
SECTION 7. APPENDICES.
3
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

7.1 Company Owned Equipment


7.2 Completed Project Handover Formats.
7.3 CV of Key Company Personnel.

SECTION 2

DESCRIPTION OF THE COMPANY

PAGES

2.1 General. . . . . . . 5

2.2 Vision. . . . . . . . 6

4
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

2.3 Company Scope of Service.. . 8

SECTION 2

DESCRIPTION OF THE COMPANY

1.1 General
Bekele Burusa GC & WWC is a young employee owned company established to
involved in great spectrum of engineering activities, mainly in Water Supply design
and construction, Road structure design, Civil structure design and construction, but
Specialized in water structures including: - Source identification, Head works, Spring
development, Reservoirs construction, Pipe line design & construction, different Size
of Collection Chamber & reservoir construction, Treatment plant and etc. Electro-
mechanical Work for Water Supply Projects and other water related Structures,
bridge, culverts and water conveyance structure, irrigation & Drainage structures and
other civil construction. The company members, who are well experienced
professional in Water supply design & construction, Irrigation and drainage design &
construction, Buildings, Road and Bridge Structure and Electro Mechanical
Engineering activities for all civil Work and other construction related activities
including project identification, formulation, appraisal and Post monitoring evaluation.

N.B: You can refer details of experience for the staffs from
their curriculum vitae ( CV’S)
Bekele Burusa GC & WWC established by well-experienced professional combination
of Owners & Employers

5
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

 Hydraulic & Water Resource Engineers – Well Experience.


 Civil engineer – B.Sc.
 Senior Surveyors - Diploma
 Well experienced Electro-Mechanical Technician
for Water Supply & Industry activities.

Company Skilled staffs


 Experienced water Supply & irrigation Construction Forman ... .. 2(Two)
 Surveying Team **** (2 Team)
 Plumbers - For All type pipe line net work including GI, uPVC, HDPE & PPR
Pipe installation depend on the project nature. *** 4 Teams
 Well Experienced Concrete Elevated Reservoir, Ground Concrete Reservoirs,
Spring Development, Treatment Plant, Collection Chamber other Water
Structure construction Forman. **** "More than 4 Crew"
 Experienced Building Forman .**** 2(two)
 Well experienced Technicians for Electro-mechanical work for water Supply
construction including pump & Generator installation.
 Irrigation structure Forman. . 2(Two)
 Well-experienced skilled labor for water Supply, building, and Irrigation
construction.

Those employees have qualified and intensive experience in Water structure


construction & design, civil construction including Water Supply, Drainage system,
Irrigation structural & Bridge construction and design as well as geo-technical and
Ground water investigation.

1.2 Vision
Our vision is to be a reputable engineering & construction company in the country to
provide outstanding solution for a wide range of Water, Civil, Road and Electro
mechanical construction works with Specialization of Water Resource by applying the
most updated professional skills, quality and time efficient standard procedural
practices.
6
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Bekele Burusa wwc is equipped with construction and designing equipment,


machineries and vehicles.
 Backhoe Loader and Dump Tracks( Owned )
Backhoe Loader JCB (owned)

Dump Track with a Capacity of 7m3 Nissan UD (Owned)

Dump Track with a capacity of 16m3 Sinotruck (Owned)

Pickups ( Owned)
 1- Double Cabin D4D New Model

Sets of Plumbing tools ( Company owned )


 Pipe Cutters of different sizes like.
 Threads from 6’’ to ½’’
 Tripods & Clamps.
 Chain Block & Winches 3Ton & 5 Ton
 Butt welding Machine(Leased)

 Sets of Pump Installation Tools ( Company owned & leased )


 Set of Pump Installation in drilled Wells – Chain Block & Try pods
 Small Crain Modified for Lowering of submersible Pump in the Well

 Surveying Instrument ( Owned )


 Total Station – Code Leica Flex Line TS02 Total Station
With Keyboard, CTB 101 Tribranch Black, GEV 189 Data Downloading
Cable
 Electronic level with tripod & all accessories

Pumps & Generator ( leased & Owned)


 Submersible Pumps for Pump Test
 Generators for Pump test 5kw & 15kw

 De-watering Pumps (Owned)

 Mixers (Company owned & leased)


 Mixer Lombardi Eng Diesel. 300lit. (Owned)
7
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

 Mixer Lombardi Eng Diesel. 500lit, 2 in No. (Leased).

 Mixer Lombardi Eng Diesel. 750lit (lease)

 Elector mechanical maintenance tools


 Plumbing Tools –
 Six Sets of Plumbing Tools
- Pipe Wrenches1'', 11/2'', 2'', 21/2'', 3'' , 4’’ 6’’
- Tool Box ---- 4 set
 Trader and Cutter
- Pipe & Cutter1’’ , 11/2’’, 2’’, 21/2’’, 3’’, 4’’, 6’’
 Butt welding machine for HDPE pipe
 Computers(laptops and desktops) for office work with professional works for
design such as SAP, Epanet 2, HCALC, AutoCAD, Civil-CAD, Hydro-
geological Modeling, Geo-Physical Survey, GIS, and other Engineering related
software.

1.3 COMPANY SCOPE OF SERVICES


a. Construction
 Construction of water supply projects
o Construction of scheme including:-water supply,Small Scale
Irrigation , Bridge, Canal….
- Treatment Plant for Small and medium Scale Demand water supply
projects including slaw sand filter system, Aeration Cascade Structure,
balancing Chamber, Roughening filter, wet well and other treatment
structure.
- Diversion and Head works including weir and Barrages.
- Service reservoir, Elevated reservoir Collecting Chamber and Micro
dams.
- Pump House for Rural and Urban water supply schemes.
- Valve chambers pressure valve & related works.
- Spring Development and capping.

o Pipe Line net Work


- Pile line network and distribution system for Urban and Rural
Small and Medium Scale Project.

8
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

- Distribution for Industrial works and other scheme.

o Source Works
- Weir and Diversion work for water Supply and Irrigation Schemes.
Electro mechanical Work for water Supply Schemes.
- Pump Installation for Surface and Ground Water.
- Generator installation & other Electro mechanical work.

o Rehabilitation of existing system


-Maintenance of all type of water supply schemes including, pipe
Line network, treatment, Irrigation Structure and other water related
Schemes.

o Community based project implementation


-Community promotion for project implementation.
-Community labour base project implementation.
-Community mobilization for construction and management.
 Construction of Road, Bridge and Drainage work
-Access road construction: - Access for rural road,
-Bridges and water conveyance.
- Road side drainage works and sub surface systems.
-Fords, culverts and water passing structure.
 Building and civil structure construction
- Building Construction for different services such as social
Services, industrial service & others.
- Diversified civil structures including Road Construction and
Maintenance, bridge, Culverts and Other Structure.
 Electro mechanical works
The major Electro mechanical contracting activities that our company engaged
are:-
o Water Supply
- Pump & Generator Installation for Borehole source & Spring Source
o Industrial Engineering
- Machinery selection, layout design, erection and Commissioning of
unit and production line machine.
9
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

- Design and Construction of Industrial electrical distribution


& Control System Board.
- Electro mechanical work for all Water Supply Project.
- Ordinary and extraordinary maintenance of electro Mechanical
equipments and machineries.

SECTION 3

WORK METHODOLOGY &


PROCEDURE

PAGES

3.1 Understanding of Project. . . .11

3.2 Method of Working Project. . . 12

3.3 Work Schedule. . . . . . 15

3.4 Man Power & Equipments Schedule. 19

10
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 3

Declaration of Site Visit & understanding


of the Work

3.1 Understanding of the Project Areas

By representing the Contractor, a group of engineers lead by Eng. BEKELE

BURESA had visited the project areas and existing condition of the projects for
evaluation of existing condition of Project area, to have first hand information of the
actual condition of the site, local material source, Access of the road of the project
and other relevant inf1`wormation which is helpful for preparation of the technical
proposal and price quotation that will be undertaking after this pre qualification.
Accordingly, the findings and data collected during the exciting project visit are
summarized in further.

3.1.1 Project Location

The construction site is located at Kelam Wollega , Nunuu Town, Water Supply
Project the West Ethiopia During the site Visit, the team of the contractor assessed
the access road condition to the project site, construction material availability and
other related information including availability of water for intended works to use the
project efficiently.

11
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

3.1.2 Land Cover and Land Use

The major part of the project area in the vicinity was grass land, hot area, Some Part
Of around nuunuu town forest and others.

3.1.3 Geology

According to the Geological Map of Ethiopia, 2008, the geological formation of the
project area is dominated by clay and metamorphic rock complex And

Forester area, some scarcity of sand around we gather the Information.

Possible sources of construction Material

a. Masonry stone /stone for aggregate production

There are construction stone source that will be used for masonry works, at nearby
vicinities of the sites.
b. Sand
There is sand source suitable for water work construction in the project areas.

3.2 PROPOSED METHOD OF WORKING

The technical proposal we are adopting for the project is fully based on detail
examination of the sites and through understanding of the given Qualification
documents and Information we obtain. Our proposed method for the efficient
execution of the project is as described hereunder;

3.2.1 General Approach

The Bekele Burusa WWC & GC Project team will be organized independently as
“Nuunuu Town Water Supply Project” Construction Project backed by suitably
qualified professional engineers from head office of the Contractor, who are well
12
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

experienced in construction of water supply projects and also highly experienced in


civil works, contract administration for carrying out the assignment. The Project
Organizational Chart, which describes the organizational structure and Team
Composition of the project is considered and indicated in the “Chart” below.

Mobilization of the Contractor staffs, equipment,


materials & Work Methodology

Up on receiving the Notice to commence the works the project activity will be
commenced by collecting complete set of Project Documents and project Information,
followed by organizing and equipping of the project team with the necessary
manpower & construction equipment within mobilization period of 5 days.

Within the time of project commencement period which takes place within 5 days
after site hand over of the project, the core project staff including General Manager,
Project Manager, Construction Forman & Chief Plumber will mobilize to the project
site for assessment of the project, site preparation and other preliminary activities.

At this stage, the Project Manager and his core staff will meet with the local
respective authorities to conduct Community awareness pertaining to the project area
such as land acquisition and locating campsite and locally available construction
material utilization. Based on this information, the Project team will prepare the
practical work schedule, which eventually submitted to your organization as a Final
work schedule.

Surveying Crew of the project will start surveying works immediately after site
handover of the project, such as: set Control Points and adequate bench marks for all
structures at the first place and finally supervise the designed level and layout of the
project components.

Mobilization of Equipments and construction materials will be commenced


immediately upon effectiveness of the Contract and the excavation will start parallel
to the mobilization activity, within maximum of ten (15) days after effectiveness of the

13
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

contract, the remaining activities will be commenced sequentially based on the


approved work schedules.

Detail Work follows will find on. “Work flow chart after Site Hand
Over”

14
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

3.3 Work Program and Activity Schedule

Based on the Nature of the Project the Employer and our Method Statement for the
tackling of the assignment, we have prepared a work program for a total allocated
project completion days specified in the special condition of contract including fifteen
(15) days mobilization period.

15
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

“Proposed……. “Work Schedule”

See on next pages

16
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 4

Statement of Qualification

Pages
4.1 Legal Status. . . . . . . . 23

Work Permits & Legalities. . .

4.2 Man Power / Key Personnel. . . . . 24

4.3 Equipment. . . . . . . . . 30

4.4 Organization. . . . . . . . 31

4.5 Power of Attorney . . . . . . 32

__________________________________________________________________________
Technical Doc / BEKELE BURUSA General Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 4

Statement of Qualification

4. STATEMENT OF QUALIFICATION

4.1 LEGAL STATUS

4.1.1 Legal Status of Company

Bekele Burusa WWC & GC Company is registered and licensed as

(Grade 5 Water Works & General Contractor) by the Ministry of Water


Resources. It has also a Business License from Addis Ababa Trade, Industry & Tourism
Development Office and registered for VAT by Federal Inland Revenue Authority,
Registration No. 62086.

Please, find copy of documents indicating the constitution

or legal status of the contractor attached herewith.

23
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

4.2 Manpower
The founding members of Bekele Burusa GC are also employees of company are,
water supply Engineer ( Hydraulic, Water resource, Civil Engineering and Irrigation
engineers ), civil Engineer, Mechanical Engineer, Building Engineer, Electrical
Engineer and other experts with intensive experience in there respective fields of
specialization, designing, construction and Supervision of civil works.

The following are the employees and members of Bekele Burusa GC

I. Ato Bekele Burusa wwc & GC is the company owner. Ato Bekele Burusa is a
graduate of BSc degree in Civil Engineering form ADAMA SCENCE AND
Technology University(ASTU) Institute in 2012 EC.

Bekele Burusa has 7 years intensive experience in project identification, &


Formulation community driven project appraisal and preparation Construction project
implementation, design and supervision including Community mobilization,
promotion, and organization for project Sustainability in different region of the country
including Oromia Region.

24
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

II. Ato Meyomi Fayisa is one of the company employees and he has BSC degree
in Construction Engineering from Arba Minch Water Technology in 2007 EC. He
involved major building and Irrigation projects of the country;
Ato Meyomi was involved also in several rural community driven project identification

& implementation for the last 3 years experience in further civil construction and
designing works and participated in several water resources Construction and civil
construction as construction engineer, site engineer & resident engineer.
For the last three years has served in Ethiopian Rural Self Help Association as a
Water and Construction Engineer on Water Supply and Irrigation projects, which has
a project cost of 2.050 Billion ETB.

The details of project components are attached herewith on his

CV.

25
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

III. Ato WONDESAN Wondimu is the Site Engineer. Ato WONDESAN Wondimu is a
graduate of BSc degree in Civil Engineering form ADAMA SCENCE AND
Technology University(ASTU) Institute in 2014 EC.

WONDESAN Wondimu has 5 years intensive experience in project identification, &


Formulation community driven project appraisal and preparation Construction project
implementation, design and supervision including Community mobilization,
promotion, and organization for project Sustainability in different region of the country
including Oromia Region.

26
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

III. Ato Yared Girma Ayela is one of the company employees. Ato Yered Girma
Ayele Nekemte TVET College is a graduate of Diploma in Hydraulic Engineering form
haramaya University Civil Engineering Institute at 2013 gc, .

Wubshet has 12 years intensive experience in rural and town water supply projects,
Road, Power Tower, Building projects and Irrigation projects.
For the 1st two years of his career he was engaged in project identification, &
Formulation community driven project appraisal and preparation Construction project
implementation, design and supervision including Community mobilization,
promotion, and organization for project Sustainability in Oromia Water Resources
Bureau at Oromia Region.
After he leaves OWRB, Ato Yered Girma was served Light Building Construction

Enterprise for two years at the level of Construction engineer and Engineering
section head in: Ethio-Dgibuti Power Project, Project cost.

27
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

IV. Ato Eshetu Burusa:- is one of the company employees. Since 2007EC, for the
last 2 years he was intensively engaged in countries major Drainage Work projects
in almost all regions and every corner of the country. The detail descriptions of the
projects are listed in his CV attached herewith in the document.

28
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Ato Solomon Bogela Duresa has served his previous company - Surveying
Construction Enterprise on different positions, at various Water Supply, Building &
Irrigation Projects from Junior Electro-mechanical expert up to senior levels.
The water supply projects he engaged have ranged from medium to large scales and
the sources of the water supply was both Ground water & Surface water.

29
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

4.2.1 Personnel for Project


The name of proposed candidates of the contractor for specific positions essential to
contract implementation, is as stated here below. Duly signed and dated relevant data of the
proposed candidates accompanied by copies of educational testimonials will be supplied in
separate sheets.

SINIOR PROFESSIONALS
FOR
Ifa Basi SSIP PROJECT CONSTRUCTION
Title of position:
 CONSTRUCTION ENGINEER
1 Name of candidate:
 ENG. Bekele Burusa

30
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

WEL- EXPERIANCED PERSONNELS


FOR
WATER SUPPLY PROJECT CONSTRUCTION
Title of position:
 CONSTRUCTION FORMAN
Name of candidate:
2  WONDOSEN YILMA

31
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

WEL- EXPERIANCED PERSONNELS


FOR
IFAA BASI PROJECT CONSTRUCTION
Title of position:
 CONSTRUCTION ENGINERING
Name of candidate:
3  MEYOMI FAYISA

32
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

WEL- EXPERIANCED PERSONNELS


FOR
IFA BASI SSIP PROJECT CONSTRUCTION
Title of position:
 SERVEYING TEAM
Name of candidate:
4  SOLOMON BOGALA

33
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

WEL- EXPERIANCED PERSONNELS


FOR
IFAA BASI PROJECT CONSTRUCTION
Title of position:
 CONSTRUCTION FORMAAN
5 Name of candidate:
 ENG ESHETU BURUSA

34
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

A. Summary of Key Staffs

Year of
Specia.
Personnel Qualification Experienc Position Remarks
e
Senior Professionals & Company Owners
Eng. BEKELE BURUSA BSc Civel 6Years CIVIL Construction Owner
Engineering Engineer Engineer
Eng. Abera Nagash BSc Water 10 Years Water supply Technical Employee
Gudata Resource, Civil & Irrigation Manager & Site
Engineering project magt. Engineer
Forman
Ato Eshetu Burusa Diploma 8 Years Construction Senior Employee
& Building Construction
Forman
Surveying Team
Ato SOLOMON Diploma 7 years Water supply Surveyor Employee
BOGALA and Road,
Drainage and
living ad top
grapy

Construction Team

Ato Meyomi Fayisa Bsc- Degre 4 Years Pond, Chief Plumber Employee
building,..etc
Ato Wondessan Bsc.Degree 5Year Road,Draina Site Engineer Employee
Getachow ge And
watter
Supply

Material Engineer Workers


Ato Biniyam Seifui Civil Engineer 6years Generator & Conselt Employee
Demissie Building elec. Building-

35
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Install. mechanical
Team Leader

4.3. Equipment & Vehicles


Bekele Burusa WWC is equipped with construction and designing equipment,
machines and vehicles of the following:

 Dump Tracks( Owned)


 Dump Track With a Capacity of 16m3 SINOTRUCK & 16m3 UD NISSAN

 Pickups ( OWNED)
 1- Double Cabin D4D New Model

 Sets of Plumbing tools ( Company owned)


 Pipe Cutters Different sizes.
 Traders from 6’’ to ½’’
 Tripods & Clamps.
 Chain Block & Winches 3Ton & 5 Ton
 Sets of Pump Installation Tools ( Company owned & leased)
 Set of Pump Installation in drilled Wells – Chain Block & Try pods
 Small Crain Modified for Lowering of submersible Pump in the Well
 Generator Installation mobile & Manual Crain

 Surveying Instrument ( COMPANY OWNED)


 SET OF leveling instrument with tripod and all accessories
 Pumps & Generator (leased)
 De-watering Pumps
 Mixers( Company owned & leased)
 Mixer Lombardini Engine Diesel . 300lit.
Elector mechanical maintenance tools.
 Plumbing Tools –
36
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

 Six Sets of Plumbing Tools


- Pipe Wrenches1'', 11/2'', 2'', 21/2'', 3'' , 4’’ 6’’
- Tool Box ---- 4 set
 Trader and Cutter
- Pipe & Cutter1’’ , 11/2’’, 2’’, 21/2’’, 3’’, 4’’, 6’’
 Butt welding machine for HDPE pipe

 Computers(laptops and desktops) for office work with professional works for
design such as SAP, Epanet 2w, HCALC, AutoCAD, Civil-CAD, Hydro-
geological Modeling, Geo-Physical Survey, GIS, and other Engineering related
software.

37
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

A. Equipment & Vehicles to be deployed on site


Number
Description Company Capacity Present
of Condition
(Type Model) owned/ Lease Location
Units
Dump Tracks

 Dump Track(sin truck & 16m3


3 owned V. Good ADAMA
UD Nissan) &7m3
 Water Truck 15,000m3 1 Lease 15,00m3 v.Good ADAMA
 Back hoe loader 1 Leased 3m3 V. Good ADAMA
 Grader 1 Leased 120Hp V.Good ADAMA
 Wheel Loader 1 Leased 9m3 v.good ADAMA
 Mobile Crane 1 Leased 15tone V. Good ADAMA
Pick Ups & Field Vehicles

 Pick Up Sing. Cabin 1 Owned 10Qt V. Good ADAMA


Surveying & Plumbing Instrument

 Surveying Instrument 1Set ADAMA


owned TS 02 New
Level
 Plumbing Tools ADAMA
1Set Owned 1’’ to 6’’ V. Good
Pipe Wrench 1’’ to 6’’
 Pipe Cutter & Traders 1Set Owned 1’’ to 6’’ New ADAMA
Dewatering ,Mixer ,Compactor & Vibrator

Mixer Lombard 1 Owned 300lit V. Good ADAMA


Vibratory 2’’ 1 Owned - New ADAMA
Dewatering Pump 1 Owned V.good ADAMA
Compactor 1 Owned New ADAMA

38
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

4.3 ORIGANIZATION

Bekele Burusa GC is a licensed of General, Electromechanical & Water works Contractor


for multi sector construction work and Water Work Construction Company.

Organizational Chart

General Manager

Ex. Secretary

Water & Civil Engineering Dep.


* Water , Civil & Road Engineer
Elecro- Mechanical Dep. Financial & Adm. Dep.

Water & Industrial Power


Installation Accountant, Purchaser & Casher
Construction
Construction

Crew Water Supply

Dis.
Work Shop .

4.5 Power of Attorney of Signatory of Bid

Power of Attorney of Signatory of Bid has been fully delegated to the Company General

Manager, Eng. Bekele Burusa or will be described in letter as it is clearly


indicated in the article of association of the company. Please, find attached herewith a copy
of Article of association of the company describing power of attorney of signatory as attached
herewith.
Name of Company: Bekele Burusa GC

Office Address:
2 Adama ,Tikur Abay

Telephone: Contact Person:


3 0910-37 73 98 Eng. Bekele Burusa Gurmu

39
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Fax: Tele:0910 37 73 98
4 +251919284862

Place of incorporation/registration: Year of incorporation/registration:


5 Adama 2006, Oromia

40
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 5

Company Experience

PAGES
5.1 Company Experience. . . . 34

5.2 Completed Project Profile. . . 34

5.3 Project at Hand. . . . . 36

5.4 Performance Certificate. . .

41
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 5
Company Experience
5. COMPANY EXPERIENCE
Although, Bekele Burusa is a recently established company and has managed to

secure more than 13 projects and all are successfully accomplished. In its short
period of experience the company is increasingly winning the confidence of its clients
through is providing dependable professional services.

However, it is experience in construction and design of civil, other related works it


planes for the design, and construction of Electro mechanical works with the
combination of General power technical service and united management service for
the community management and other community related works.

5.1 Completed Project


Employer Project Cost
SN Project Title (Owner) (Birr) Project Details
1 Construction of East Harerge 5,049,837.51 Excavation of pond
Zone Agricultural Supply & installation Perforated
Warra Alii pond
Office. pipe, Spill Way, Reteaning
Wall,canal of out let, cattle trough,
bono
Construction Structure

2 Construction of Illu Abba 8,807,625.75 Education Blocks, Office


Bore ,Becho Block Septic tank and Toilet,
Becho Technical
Woreda Man Walk road And site
School.
Technical School Clearing.

3 Awash Awash Inter 2,561,348.00  Supply & Installation


Electromechanical (pumps &
International National pump control Board)

42
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Bank Bank(AIB)  Supply & Installation of Pipe


works and Fire Hydrant
Construction of System

Store, Man Walk,  Commissioning & testing the


system
Building  Construction of pump control
Rehabilitation in board house with installation
of the board
Shashamanne
Branch project
4 Construction of Gujii Zone 5,261,123.57  Building Education, Septic
Tank, toilet and finishing work.
Shakkiso fi
Shakkiso
preparatory school
Preparatory
School
5 Diabayu River ARSI 29,954,762.54  Gabion Works
 Reatanig Wall
Gabion Works and
ZONE,Seruu  Shouter work
reating work Arsi
 Concrete retaining wal
Zone,SERU  Plastering work
Woreda,Diabayu  Site work

Woreda.  Other finishing works.

6 CREC Addis Chane Road 2,825,603.48  CONSTRUCTION OF


Engineering Grouted Road Shoulder
Ababa_Mieso
Corporation  Construction of Grouted riprap
Railway 2nd Branch
(EREC) side ditch
PROJECT  Construction of Grouted
Riprap chute
 Concrete Blocks install.
 Platform Plaster.

7 Construction of East Harerge 4,413,538.58 Excavation of pond
Zone Agricultural Supply & installation Perforated
Dhakeba pond
Office. pipe, Spill Way, Reteaning
Wall,canal of out let, cattle trough,
bono
Construction Structure

43
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

44
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 6

Financial Capability

PAGES

6.1 Financial Statement & Assets. . . 39

6.2 Current Cash at Hand. . . . . 39

SECTION 6

45
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Financial Capability
6.1 FINANCIAL CAPABILITY

The Financial Information of the Company that demonstrates its capability to meet
the requirements stated in the Tender Questionnaire.

Bank statement of the company

 See on attached Page


Assets and Liabilities of the company (Financial Capability)

The summarized actual assets and liabilities in Eth. Birr for the previous Five years.
Based on known commitments is as follows:

The summarized actual assets and liabilities in Eth. Birr for the previous three years
based on known commitments is as follows:

Reference is made to the copy of Audited Balance Sheets of the Company attached
as an Financial Statement & Asset of this document.

Proposed Source of Financing of the Project

Our proposed sources of financing to meet the cash flow demands of the project, net
of current commitments is as indicated hereunder:

Source of financing Amount Eth. Birr Remark


1. Own Account 2,440,000 berahan int. bank Adama
22 branch
2. Credit Facility(Collateral) Berhan Int. Bank Adama 22
3,000,000.00
branch
Total 6,676,985.46

Annual turnover for the last 5 years

46
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

No.
Dat Name of Amount of the Project

e The

Project
1 29/01/2015 CREC Addis- Ababa Mieso Rail way 1,171,480

Project
2 02/2/2015 CREC Addis- Ababa Mieso Rail way 1,654,123.48

Project.
3 07/7/2016 East Harerge Zone Wara Alii Pond 1,544,869.86
Gursum Woreda Pest
4 7/8/2016 East Harerge Zone Wara Alii Pond 1,705,850.86
Gursum Woreda Project
5 22/6/2016 East Harerge Zone Wara Alii Pond 1,009,987.66
Gursum Woreda Project
6 08/11/2016 East Harerge Zone Wara Alii Pond 536,681.30

Gursum Woreda Project

7 12/09/2016 East Harerge Zone dhakeba Pond 882,704.29

kurfa chale Woreda Project

8 16/12/016 East Harerge Zone dhakeba Pond 815,598.06

kurfa chale Woreda Project

7 27/02/2017 Hadiya Zone, Hyse –Hariko River 2,378,639.90

Project construction project.


8 25/06/2015 Hadiya Zone, Hyse –Hariko River 3,553,983.15

Project construction project

9 23/11/2015 Hadiya Zone, Hyse –Hariko River 3,528,118.24

Project construction project

10 11/01/2016 Hadiya Zone, Hyse –Hariko River 2,788,071.08

Project construction project

11 17/03/2016 Illu Abba Bore Zone Becho woreda 2,429,359.18


47
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Technical school

12 19/03/2016 Illu Abba Bore Zone Becho woreda 1,458,634.64

Technical school

13 27/11/2017 Arsi Zone Diabayu gabion Works 5,990,952.51

14 13/02/2018 Arsi Zone Diabayu ,seruu wareda 8,210,235.49

15 03/04/2018 Arsi Zone Diabayu gabion Works 5,791,407.05

16 23/06/2018 Arsi zone diabayu gabion 7,734,688.88

17 23/12/2016 Illu Abba Bore Zone Becho woreda 1,472,067.64

Technical school

30/03/2017 Illu Abba Bore Zone Becho woreda 526,883.52

18 Technical school

19 23/02/2015 AIB Store, Man walk, Curve stone, 512,269.60

Toilet and rehabilitation building.

20 14/08/2015 AIB Store, Man walk, Curve stone, 839,316.58

Toilet and rehabilitation building.


21 10/12/2015 AIB Store, Man walk, Curve stone, 656,728.48

Toilet and rehabilitation building.

22 06/02/2016 AIB Store, Man walk, Curve stone, 456,880.60

Toilet and rehabilitation building.

23 13/11/2017 GEORGE SHOE ETHIOPIA PLS 703,176.24

Stone Masonry Of reating Wall

24 18/11/2017 CTCE (china Construction 618,156.37

Engineering )

25 11/12/2017 CTCE (china Construction 1,614,327.2

Engineering )

26 23/12/2017 CTCE (china Construction 8,700,192.82

Engineering )
27 29,12/2017 CTCE (china Construction 1,150,000

48
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Engineering )

28 06/01/2018 CTCE (china Construction 1,955,267.56

Engineering )

29 11/04/2018 CTCE (china Construction 1,150,000

Engineering )

30 18/07/2018 China state Construction 548,860.69

Engineering

31 17/12/2018 China Rail-way Twenty first Bureau 1,999,999.99

Co.LTD(Ethiopia)
32 18/12/2018 CTCE (china Construction 23,000,000

Engineering )
33 10/01/2019 China state Construction 8,000,000

Engineering

33 18/03/2019 Hope Arising.INC School 193,317.10

34 01/04/2019 GEORGE SHOE ETHIOPIA PLS 345,000

Retaining Wall

35 04/04/2019 Seru Woreda Water & Mineral 212,761.48

Energy Office

36 24/04/2019 Seru Woreda Water & Mineral 559,379.24

Energy Office

37 31/05/2019 GEORGE SHOE ETHIOPIA PLS 248,000

Retaining Wall, water supply


38 18/06/2019 GEORGE SHOE ETHIOPIA PLS 745,200.00

Retaining Wall

39 04/07/2019 Seru Woreda Water & Mineral 258,823.99

Energy Office

40 27/07/2019 GEORGE SHOE ETHIOPIA PLS 1,242,000

Retaining Wall

41 28/01/2020 East Harerghe Zone Firi Qabso 1,096,090.35

49
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

Water Supply , Malke Ballo District.

42 07/04/2020 Haramaya University Gursum 1,270,002.22

Research Center.

43 16/01/2021 Haramaya University Gursum 641,396.37

Research Center

44 19/03/2019 Haramaya University Gursum 1,413,524.81

Research Center

45 08/6/2020 Haramaya University Gursum 1,413,524.81

Research Center

46 12/09/2021 Haramaya University Gursum 661,678.90

Research Center

47 23/12/2021 Haramaya University Gursum 5,733,801.21

Research Center

48 07/04/2021 East Harerghe Zone Firi Qabso 8,060,819.56

Water Supply , Malke Ballo District

49 07/06/2021 East Harerghe Zone Firi Qabso 2,613,701.90

Water Supply , Malke Ballo District

50 15/12/2021 East Harerghe Zone Firi Qabso 6,281,087.38

Water Supply , Malke Ballo District

Total project cost for the last 5 years 142,893,995.24

No. of Years 5

Annual Turnover for the last 5 years 28,578,799.12

Annual Turnover for the last 3 years 47,631,331.24

50
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

51
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

6.1

Financial Statement &


Assets

52
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

SECTION 7

Appendices

pages

7.1 Company Owned Equipment. . . .40

7.1 Summary of completed project. . . 40


53
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

7.2 CV of Key Personnel of Company. . . 42

7.1

Company Owned
Equipment Document

54
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

7.2

Key Personnel CV’s


of the Company
55
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

LITIGATION
HISTORY
56
Technical Doc / Bekele Burusa General And Water Works Contractor
GABION & CHECH DAM PROJECT DECE. 10,2018

 NONE

57
Technical Doc / Bekele Burusa General And Water Works Contractor