Professional Documents
Culture Documents
Skema Coal Handling Facility Rev.1
Skema Coal Handling Facility Rev.1
9 990 typical
maksimum cap. VF 1000 TPH 0.75 750 typical
in case direct feeding dan mixing dengan SP#3
untuk utilisasi stockpile, dalam melakukan bypass disyaratkan agar selalu ada stock di tiap SP
case#1A 75% - 35%
capacity SP#1 15000 0.7 10500 full capacity SP#1 10500
capacity SP#2 40000 0.7 28000 full capacity SP#2 28000
capacity SP#3 60000 0.7 42000 full capacity SP#3 42000
input out put SP#1 ada SP#2 ada SP#3 ada Acc
operation Mode hours Stacking#1 Stacking#2 PSC total VF#1A VF#1B VF#2A VF#2B feeder SP#3 total stock stock stock in-out
1100 1100 1800 4000 750 750 350 350 1800 4000
Vibrating feeder#1 only 23 25300 0 0 25300 17250 17250 0 0 0 34500 10500 0 0 1300
Vibrating feeder#2 only 23 0 25300 0 25300 0 0 8050 8050 0 16100 0 28000 0 37200
combine all feeder at SP#3 23 0 0 41400 41400 0 0 0 0 41400 41400 0 0 42000 0
PRC Capacity = 4000 TPH 23 0 0 0 0 0 0 0 0 0 0 0 0 92000
total daily 23 25300 25300 41400 92000 17250 17250 8050 8050 41400 92000
stockpile SP#1 full 0 days Note : saat direct loading pada SP#1, maka SP#2 stock batubara dan penuh di hari yg sama
Stockpile SP#2 full 0 days Note : saat direct loading pada SP#2, maka SP#1 stock batu bara tapi penuh di hari yang sama
case#2 35% SP#1 dan 35% SP#2 maka Rate OLC menjadi turun
capacity SP#1 15000 0.7 10500 full capacity SP#1 10500
capacity SP#2 40000 0.7 28000 full capacity SP#2 28000
60000 0.7 42000 full capacity SP#3 42000
input out put SP#1 ada SP#2 ada SP#3 ada Acc
operation Mode hours Stacking#1 Stacking#2 PSC total VF#1A VF#1B VF#2A VF#2B feeder SP#3 total stock stock stock in-out
1100 1100 1800 4000 350 350 350 350 1800 3200
Vibrating feeder#1 only 23 25300 0 0 25300 8050 8050 0 0 0 16100 10500 0 0 19700
Vibrating feeder#2 only 23 0 25300 0 25300 0 0 8050 8050 0 16100 0 28000 0 37200
combine all feeder at SP#3 23 0 0 41400 0 0 0 0 0 41400 41400 0 0 42000 42000
PRC Capacity = 4000 TPH 23 0 0 0 0 0 0 0 0 0 0 0 0 92000
total daily 23 25300 25300 41400 50600 8050 8050 8050 8050 41400 73600
stockpile SP#1 full 0 days Note : saat direct loading pada SP#1 selama setengah hari, SP#2 sudah terisi 13200 Ton
Stockpile SP#2 full 0 days Note : saat direct loading pada SP#2 selama setengah hari, SP#1 sudah terisi penuh
Note 748
Note
Note
SP#1
SP#2
SP#1
SP#2
SP#1
SP#2
SP#1
SP#2
SP#3
SP#1
SP#2
SP#1
SP#2
in case direct feeding dan mixing dengan SP#3
untuk utilisasi stockpile dan planning "jaga jaga" apabila ada "faktor external" di tambang , dalam melakukan bypass disyaratkan agar selalu ada stock di tiap SP
dalam keadaan normal bypass bisa langsung dari tambang, namun apabila terjadi sesuatu seperti alat rusak atau hujan di tambang, lebih baik ada stock di tiap tiap SP
case#1A single feeding
capacity SP#1 15000 0.7 10500 full capacity SP#1 10500
capacity SP#2 40000 0.7 28000 full capacity SP#2 28000
capacity SP#3 60000 0.7 42000 full capacity SP#3 42000
input out put SP#1 ada SP#2 ada SP#3 ada Acc
operation Mode hours Stacking#1 Stacking#2 PSC total VF#1A HGF#1 VF#2A HGF#2B feeder SP#3 total stock stock stock in-out
1100 1100 1800 4000 750 2250 750 2250 1800 7800
Vibrating feeder#1 only 23 25300 0 0 25300 17250 51750 0 0 0 69000 10500 0 0 -33200
Vibrating feeder#2 only 23 0 25300 0 25300 0 0 17250 51750 0 69000 0 28000 0 -15700
combine all feeder at SP#3 23 0 0 41400 41400 0 0 0 0 41400 41400 0 0 42000 42000
PRC Capacity = 4000 TPH 23 0 0 0 0 0 0 0 0 0 0 0 0 92000
total daily 23 25300 25300 41400 92000 17250 51750 17250 51750 41400 179400
stockpile SP#1 full 0 days Note : saat direct loading pada SP#1, maka SP#2 stock batubara dan penuh di hari yg sama
Stockpile SP#2 full 0 days Note : saat direct loading pada SP#2, maka SP#1 stock batu bara tapi penuh di hari yang sama
1530
case#3A 75% SP#1 dan 35% SP#2
capacity SP#1 15000 0.7 10500 full capacity SP#1 10500
capacity SP#2 40000 0.7 28000 full capacity SP#2 28000
input out put SP#1 ada SP#2 ada SP#3 ada Acc
operation Mode hours Stacking#1 Stacking#2 PSC total VF#1A HGF#1 VF#2A HGF#2 feeder SP#3 total stock stock stock in-out
1100 1100 1800 2400 750 1530 350 1125 1800 3755
Vibrating feeder#1 only 23 25300 0 0 25300 17250 35190 0 0 0 52440 10500 0 0 -16640
Vibrating feeder#2 only 23 0 25300 0 25300 0 0 8050 25875 0 33925 0 28000 0 19375
combine all feeder at SP#3 23 0 0 41400 0 0 0 0 0 41400 41400 0 0 42000 42000
PRC Capacity = 4000 TPH 23 0 0 0 0 0 0 0 0 0 0 0 92000
total daily 23 25300 25300 41400 50600 17250 35190 8050 17000 952200 127765
stockpile SP#1 full 0 days Note : SP#1 tidak akan pernah penuh
Stockpile SP#2 full 3 days Note :
Note 748
Note
SP#1
SP#2
SP#1
SP#2
SP#1
SP#2
SP#3
SP#1
SP#2
SP#3
SP#1
SP#2
SP#3
optimalisasi SP#2 dan blending flexybility di Stockpile CPP#1
1. SP#2 selalu penuh saat combine SP#1 (melawan) dan SP#3 (pinang) sementara THIESS selalu supply ke
2. fleksibilitas blending ketika direct loading dari crusher#1 dan crusher#2.
dalam praktik nya selalu direct loading dari crusher, stock pile dilakukan saat ada maintenance atau "qua
ar batu bara nya kalau di stock, sehingga harus bypass atau direct loading.