Professional Documents
Culture Documents
1 2 1 1
PROPOSED HEALTH
UNIT BUILDING
KEY PLAN
16
5 6 7 8 7 8
3 4
7 8 9 15
3 6 7 8
EPC AGENCY
RPDPL - YFC (JV)
No : 33/2B1 Rank paradise,
Mullai Nagar ,Suramangalam,
Salem - 636005,
Tamilnadu.
AUTHORITY ENGINEER
AUTHORITY
Southern Railway,
3 1 4 5 6 5 7 CL CL Kozhikode (Calicut) Railway Station,
X
Kozhikode - 673001, Kerala.
DOCUMENT REVIEW
This document has been reviewed for compiance with
the intent of design documentation and is
A No Objection. Proceed with the Works
C Rejected.Resubmit.
SUGAVAN
COLUMN : 40mm
BEAM : 30mm
RADHAKRISH VINOTHKUMAR
SLAB : 25mm
NEELIAT Digitally signed
13. DEVELOPMENT FOR ALL THE ZONES
FOR 500D GRADE OF STEEL Ld : 46 Ø (COMPRESSION) NAN SURESH H
by NEELIATH
KANNOTH AN R SHANMUGAVEL
Ld : 46 Ø + 10 db (TENSION)
KANNO MANEE
Date: Digitally signed by Digitally signed by
14. DESIGNED FOR SEISMIC LOAD AS PER IS 1893(part I) 2016 Digitally signed by VINOTHKUMAR
15. CONSIDERED DEAD & LIVE AS PER IS 875-1987(part II) RADHAKRISHNAN SURESH TH 2024.02.17
19:12:41 SUGAVANAN R SHANMUGAVEL
WIND LOAD AS PER IS 875-2015(part III) Date: 2024.02.17 11:06:43 MANEE +05'30' Date: 2024.02.17 Date: 2024.02.27 12:10:47
16. THE BUILDING IS DESIGNED FOR GROUND+1 ONLY +05'30' +05'30'
10:02:58 +05'30'
LEGENDS:
Ld
TYP
- DEVELOPMENT LENGTH
- TYPICAL
PROPOSED HEALTH UNIT BUILDING
C/C - CENTER TO CENTER
C/S
FFL
- CROSS SECTION
- FINISHED FLOOR LEVEL
GRADE BEAM LONGITUDINAL SECTION
LVL
CL
- LEVEL
- CENTRE LINE DETAILS
PROOF CONSULTANTS:
DATE 16/02/24 SCALE DWG NO:
Digitally signed by PROJ. NO. 000 EPC-CLT-RHU-W-STR-03-SH-02
RAJARAM
DRAWN DMN
RAJARAM SATISH KUMAR THESE DRAWINGS ARE UNDER COPYRIGHT AND ARE THE PROPERTY OF RSB ARCH PROJECT CONSULTANTS.NONE OF THE DRAWING
SATISH KUMAR Date: 2024.02.16 19:30:06 AND RELATED DOCUMENTS CAN BE REPRODUCED,COPIED IN WHOLE OR IN PART WITHOUT PRIOR EXPRESSED WRITTEN CONSENT OF
RSB ARCH PROJECT CONSULTANTS. THESE DRAWINGS CANNOT BE HANDED OVER TO A THIRD PARTY OR USED FOR ANY
+05'30' PURPOSE,OTHER THAN FOR WHICH IT HAS BEEN LOANED.AFTER FULFILLED THE PURPOSE OF ISSUE THE DRAWINGS SHALL BE
RETURNED TO RSB ARCH PROJECT CONSULTANTS.