You are on page 1of 5

Page Nos.

:-

REVISED SETHI DHARKOT WATER SUPPLY SCHEME


District : Nainital
Tehsil : Betalghat
Block : Betalghat
TECHNICAL STATEMENT
1. POPULATION :-
Assuming that all the works of proposed scheme will be complited upto march 2023, the base of the
scheme has been kept as 2023. Base year and design year have been kept as 2023 and 2053 respectively, assuming scheme
shall be commissioned by the year of 2023 and considering design period as 30 years The base year population has been
projected taking same growth rate as of the tehsil Betalghat growth rate during last decade ‘2001-2011' that is 1.1062 per
person per year. The base year 2023 population has been calculated by increasing 2011 population @ 1.1062 person per person
per year and the ultimate design year 2053 population has been calculated by increasing the base year population by 32%, as per
design criteria circulated by the Executive Engineer (SWAp) Uttarakhand PeyJal Nigam, Dehradun vide his letter No 700 /
SWAp samanya baithak dated 23/10/2007 and latest instructions given by Joint Executive Officer, S.W.S.M. Dehradun vide his
ltr. no. 668/N-574/2019-20 Dated: 27.11.2019.
The base year 2023 and design year 2053 population of the habitations covered in this scheme comes out to 945 and 1247
The whole coverage details of village/ habitations in this estimate.Detailed is below.
Population for the year
Current
Base year mid year Design year As per
Name of Available Population actual
Name of 2023 2038 2053
S.N revenue Code 2011 coverage in 2021 survey
habitation
village LPCD House
Total SC Total SC Total SC Total SC Hold

1 2 3 4 5 7 8 9 10 11 12 13 14 15

Permanent Population:-
Sethi
1 Sethi Dharkot 054612 NC 619 24 685 27 808 32 904 36 30
Dharkot
Institutional requirements :-
High School Sethi Dharkot @ 55 lpcd for 20% of
2 0 0 25 0 30 0 33
population 125 total strength
Primary School Sethi Dharkot @ 55 lpcd for 20% of
3 0 0 17 0 20 0 22
population 84 total strength
Junior School Sethi Dharkot @ 55 lpcd for 20% of
4 0 0 31 0 37 0 41
population 157 total strength
Cattle requirements :-
Sethi Dharkot Cattle @ 55 lpcd for 55% of
5 0 0 187 0 221 0 247
population 340 total strength
Zone I 619 24 945 27 1116 32 1247 36 30
Permanent Population:-
Sethi
1 Chandpur 054612 NC 30 24 33 27 39 32 44 36 10
Dharkot
Sethi
2 Udhina 054612 NC 61 24 67 27 79 32 88 36 17
Dharkot
Sethi
3 Khola 054612 NC 25 24 28 27 33 32 37 36 10
Dharkot
Cattle requirements :-
@ 55 lpcd for 55% of
4 Chandpur Cattle population 10 0 0 6 0 7 0 8
total strength
Page Nos. :-

Zone II 116 72 134 81 158 96 177 108 37


Permanent Population:-

Sethi
1 Lehra 054612 NC 60 24 66 27 78 32 87 36 10
Dharkot
Cattle requirements :-
@ 55 lpcd for 55% of
2 Lehra Cattle population 100 0 0 55 0 65 0 73
total strength
Zone III 60 24 121 27 143 32 160 36 10
Permanent Population:-

Sethi
1 Khadkia 054612 NC 42 24 46 27 54 32 61 36 7
Dharkot
Cattle requirements :-
@ 55 lpcd for 55% of
2 Khadkia Cattle population 100 0 0 55 0 65 0 73
total strength
Zone IV 42 24 101 27 119 32 134 36 7
Permanent Population:-
Sethi
1 Kota dhuria 054612 NC 61 24 67 27 79 32 88 36 25
Dharkot
Cattle requirements :-
Kota dhuria Cattle population @ 55 lpcd for 55% of
2 0 0 110 0 130 0 145
20 total strength
Zone V 61 24 177 27 209 32 233 36 25

Total (Zone I To V) 898 168 1478 189 1745 224 1951 252 109

In view of Government of india that house connection shall be provided to each and every rural house hold till March 2024,
the rate of water supply has been adopted as 55 lpcd as per JJM Guide Line circulated by Govt of India in February 2020 . In
additional to this, 15 % over rate of water supply has been taken for unaccounted of water as per latest design criteria.

2. DESIGN CRITERIA -
The design criteria adopted in this scheme is as per the circular of Chief Engineer, (PPRD), Uttar
Pradesh Jal Nigam Lucknow , vide his office letter No. 267/PPRD- Design Criteria Dated 25.07.2002 and circulated by Chief
Engineer (U), Uttarakhand Peyjal Nigam Dehradun vide his office letter No.37/ Design Criteria dated 14.02 2003. and also the
latest NRDWP as well as JJM Guide line and subsequent instructions issued by the departmental higher authorities time to time
have incorporated to fram this estimate.

3. RATE OF WATER SUPPLY


In view of Government of india that house connection shall be provided to each and every rural house hold till March
2024, the rate of water supply has been adopted as 55 lpcd as per JJM Guide Line circulated by Govt of India in February
2020 . In additional to this, 15 % over rate of water supply has been taken for unaccounted of water as per latest design
criteria.

4. WATER REQUIREMENT:-
Stage wise total water requirement of Scheme are calculated as tabulated below -

Total Annual water req.


net (assuming 75%
clear Total clear water requirment average annual
Rate of w/s 100% @ 55
Name of Stage Population water including 15% system losses consumption of total
(lpcd)
requir annual production
ment of water)
(lpm) (kld) (lpm) (kl)
1 2 3 5 6 7 8
Zone I
Base Year 2023 945 55.00 36.10 59.78 41.51 16373.59
Page Nos. :-

Middle Year 2038 1116 55.00 42.63 70.59 49.02 19336.43


Design Year 2053 1247 55.00 47.63 78.88 54.78 21606.2
Zone II
Base Year 2023 134 55.00 5.12 8.48 5.89 2321.76
Middle Year 2038 158 55.00 6.03 9.99 6.94 2737.59
Design Year 2053 177 55.00 6.76 11.20 7.78 3066.8
Zone III
Base Year 2023 121 55.00 4.63 7.66 5.32 2096.51
Middle Year 2038 143 55.00 5.47 9.05 6.28 2477.7
Design Year 2053 160 55.00 6.11 10.12 7.03 2772.25
Zone IV
Base Year 2023 101 55.00 3.86 6.39 4.44 1749.98
Middle Year 2038 119 55.00 4.55 7.53 5.23 2061.86
Design Year 2053 119 55.00 4.55 7.53 5.23 2061.86
Zone V
Base Year 2023 177 55.00 6.76 11.20 7.78 3066.8
Middle Year 2038 209 55.00 7.99 13.23 9.19 3621.25
Design Year 2053 233 55.00 8.90 14.74 10.24 4037.09
Total Water demand
Base Year 2023 1478 55.00 56.45 93.48 64.92 25608.64
Middle Year 2038 1745 55.00 66.65 110.38 76.65 30234.82
Design Year 2053 1951 55.00 74.52 123.41 85.70 33804.09

5 EXISTING WATER SUPPLY SYSTEM-

Included Available rate Name of Design year of


Sl. No.Name of Existing w/s scheme Present Population Year of Const.
Area of w/s w/s Source exist. Scheme

Sethi W/S Sethi


1 945 1993 30
Scheme Dharkot

6 SOURCE OF WATER-
One Nos. of Old Source of water namely as Dharikot gadhera,Nigunia ,Masao, Niguni and Kota
Dhuria Gadhera are proposed as water sources of the water supply. As per local enquiry these water sources are
parranial and undi. sputed to be tapped at proposed tapping points . It is also inquired that no other water supply scheme
has been made or proposed upto two kms distance in down stream as well as up stream from the propoesd tapping point
of the sellected water sources for this water supply scheme. Lean period discharge of proposed water sources have
been recorded. Source wise recorded discharge, name of officials who measured the disharge and safe tapable quantity
of recorded discharge are given as tabulated below -

Source Discharge
measurement

Name of officials (lpm)


Sl. Name of water Type of
measured
discharge

Adopted

Required
Tapable

Name of Zone who measured the


No. source Source
Date of

discharge

1 2 3 4 5 6 7 8 9 10
Dharikot Gadhera Gadhera Rajeev Kumar (J.E) 150
1 I Dharikot Gadhera Gadhera Rajeev Kumar (J.E) 54.78
Dharikot Gadhera Gadhera Rajeev Kumar (J.E)
Nigunia Gadhera Spring Rajeev Kumar (J.E) 15
2 II 7.78
Page Nos. :-

2 II Nigunia Gadhera Spring Rajeev Kumar (J.E) 7.78


Nigunia Gadhera Spring Rajeev Kumar (J.E)
Masao Gadhera Spring Rajeev Kumar (J.E) 12
3 III Masao Gadhera Spring Rajeev Kumar (J.E) 7.03
Masao Gadhera Spring Rajeev Kumar (J.E)
Niguni Gadhera Spring Rajeev Kumar (J.E) 15
4 IV Niguni Gadhera Spring Rajeev Kumar (J.E) 5.23
Niguni Gadhera Spring Rajeev Kumar (J.E)
Kotadhuria Gadhera Spring Rajeev Kumar (J.E) 14.5
5 V Kotadhuria Gadhera Spring Rajeev Kumar (J.E) 10.24
Kotadhuria Gadhera Spring Rajeev Kumar (J.E)
Total 85.70
As per above table the proposed source discharge is more than sufficient to feed the design population . Hence,
adopted sources are safe and edequate.
7 PROPOSALS -
Following works have been proposed under this Reorganisation/ Source Strengthning / Retrofitting
of the existing water supply scheme -
8 SOURCE WORKS -
Proposed tapping
Zone Name of Source Type of Remarks
arrangement
source
Existing New
1 2 3 4 5 6
I Dharikot Gadhera Gadhera - New BFG Proposed
II Nigunia Gadhera Spring - New BFG Proposed
III Nigunia Gadhera Spring - New BFG Proposed
IV Niguni Gadhera Spring - New BFG Proposed
V Kotadhuria Gadhera Spring - New BFG Proposed
9 Treatment Work -
A Filtration and Sedimentation -
Treatment works are proposed according available quality of water of the sources. In
hilly terrons , mostly water of the sources except Rivers and long Running water Cources are remain clear all around
the year . Proposed sources under this water supply scheme are being the Springs and short running water cources
nature as well as departmental norms and practice, SCC cum Roughening Filter is sufficient to rough filtration of water.
Hence SCC cum Roughening Filter of following size of filtation area are proposed to be constructed as per
departmental type design as detailed given tabulated below -
Proposed
Filtration Propoesd filtration area
Zone Name of Source
Unit
New
I Dharikot Gadhera New 2.40x1000/24x3600 = 0.028 Sqm
II Nigunia Gadhera New 2.40x1000/24x3600 = 0.028 Sqm
III Nigunia Gadhera New 2.40x1000/24x3600 = 0.028 Sqm
IV Niguni Gadhera New 2.40x1000/24x3600 = 0.028 Sqm
V Kotadhuria Gadhera New 2.40x1000/24x3600 = 0.028 Sqm
B DISINFECTION: -
Page Nos. :-

It is proposed to disinfect the water before supplying in the distribution system by chlorinating. Bucket type gravity feed
bleaching powder solution doser of 25 liters capacity is proposed to be installed for chlorinating. It is proposed to
administer a dose of 0.5 ppm of chlorine so that 0.20 ppm residual chlorine is available at the farthest end of the
distribution system. The requirement of bleaching powder is calculated below, assuming that 25%chlorine will be
available in the bleaching powder. Annual average production of water has been taken as 75% of annual requirement.
For "Q" KL per day requirement of water (as shown in water demand para ) bleaching powder requirement will be
= (Q*365*0.75*0.5*100) /(1000*25 )
= (0.5475*Q ) Kg. Per year.
The total quantity of bleaching powder has been tabulated below.
Daily Yearly Quantity of
requireme average bleaching
Quantity of bleaching powder Say
S.I Year Population nt of water requireme powder per
per year (Kg. /year) (Kg. /year)
Q in nt of water day (Kg.
KL./day Q in KL. /day)
1 2 3 4 5 6 7 8
2023 1478 93.48 25608.64 0.19 51.18 52.0
1
2053 1951 123.41 33804.09 0.25 67.57 68.0

10 CLEAR WATER RESERVOIR -


Following Clear Water Storage Reservoirs are proposed in the scheme .The
capacity of storage has been workedout on the basis of 12 hours day demand of desisign period as detailed given below -

Sl. No Zone Location Design Capacity of Required Usable Balance Provide


Population required Storage existing capacity standar
CWR in KL capacity capacity (KL) ed
( Col (KL) (KL) capacit
No.3x55x1.1 y
5x12/24x100 (KL)
0
1 2 3 4 6 7 8 9
1 I Sethi Dharkot 1247 39.44 39.44 0.00 39.44 40.00

2 II Chandpur 177 5.6 5.60 7.50 0.00 7.50

3 III Lehra 160 5.06 5.06 0.00 5.06 7.50

4 IV Khadkia 119 3.76 3.76 5.00 0.00 5.00

5 V Kotadhuria 233 7.37 7.37 10.00 0.00 10.00

10 SUPPLY MAIN AND DISTRIBUTION SYSTEM -


Supply Main for 24 hours supply of water from Source to water treatment and again water
treatment to Storage reservoir i.e., C W R has been designed at average flow while Distribution network has been
designed at peak flow taking peak factor as "3". G I (medium) pipe has been proposed for pipe line of supply main as
well as Distribution system. Hazen willium's formula has been used for designing the size of pipe line. Vaue of 'C' , i.e.
Hazen willium Co-efficient is taken as '100' for G I (medium) New Pipe. Use of existing pipe line has also been
considered in the present system with modified value of " C " 51,51,68 and 71 Minimum size of pipe in supply main
and distrbution system is kept as 25 mm Ø and 20 mm Ø respectively . It has been checked that pressure in pipe line is within
the safe working pressure of respective G I (M) pipe . Terminal pressure at junctions , SCC/RF , CWRs and each & every House
Hold Connection is kept as prescribed by departmental norms . For efficient maintenance of the system Air valve , Wheel valve/
Gate vave , Scoure valve and ferrule etc have been provided at suitable places. Provision of pipe & fitting has been made in this
estimate as per details given Pipes and fitting Statement chapter.
Counter signed Assistant Engineer
Executive Engineer