You are on page 1of 1

ALI

SUK
TO
KM

UR
PROPOSED

P
LA
ROB AT

J
TU
KM:771/23-25

TO
NEXT STATION
SELOO ROAD
A1 P1 P2 P3 P4 A2
SYSTEM MAP OF NAGPUR DIVISION

NAGPUR END
ART R
L L ST 000 AT E W
A .
RE W :0+180 CH AL
C H :0 L E
AT +8 N
60 D

DETAILS OF LC 96

NEXT STATION
LC NO. 96 A-3T

TO JAI PUR

SELOO ROAD
LOCATION 771/23-771/25

NAGPUR END
CLASS SPL R
PU

BOUNDARY
TVU 38304 (AUG-14) JL
A
TU

LIWAY
DISTRICT WARDHA

RA
TO
ROAD TYPE SH PROPOSED ROB C/L
TO SUKALI
Rly Km 771/6-7
ROB IN LIEU OF LC 96
AT KM= 771/23-771/25

NEXT STATION
SELOO ROAD
NAGPUR END
BH-1
BH-6

PROP. 4TH MAIN LINE


UP MAIN LINE
DN MAIN LINE
NEXT STATION

PROP. 3RD MAIN LINE


TO JAI PUR

WARUD
LC 96 AT Rly
Km 771/6-7
TO TUJLAPUR

UR
HIT
WA
PROPOSED

TO
TO SUKALI LHS
·

NEXT STATION
A1 P1 P4

MUMBAI END
P2 A2 ·

WARUD
P3
A1 BH-2 BH-4 ·

BOUNDARY
P1 P2 P3 P4
·
·
A2

LIWAY
·

RA
BH-4 BH-3 BH-5
·
·
LOCATION OF ROB ON GOOGLE MAP

BH-2 TO
TA
LO
DI

R
ITU
BH-3

W AH
TO
BH-5 PROPOSED LHS

NEXT STATION
WARUD
MUMBAI END
METAL BEAM METAL BEAM
CRASH BARRIER CRASH BARRIER

NEXT STATION
MUMBAI END

TYPICAL SECTION OF ROB AT APPROACH PORTION

WARUD
WITH BOTH SIDE SLIP ROAD

CRASH BARRIER DETAILS P3


P1

E E

DETAILS OF PIER CAP (P3)

CENTRAL RAILWAY

SECTION F-F (FOR P3) DIVISION :NAGPUR SECTION: NAGPUR-KATOL-KOHLI


SECTION D-D (FOR PIER P1) SECTION E-E (FOR P3)
SEISMIC ZONE: II TYPE OF WORK : RAILWAY FUNDING WORK

BH-04 (P2)
SECTION A-A SECTION B-B
CONSULTANCY SERVICES FOR DETAILED DESIGN
SECTION C-C (FOR P1) DRAWINGS OF 7 (SEVEN) ROAD OVER BRIDGES IN NAGPUR
B
BH-03 (P1)
DIVISION OF CENTRAL RAILWAY.
D

A A

GENERAL ARRANGEMENT DRAWING


CONSTRUCTION OF ROB AT IR KM: 771/23-771/25 ON
A1 P1 P2 P3 P4 A2 C SUKALI-TUJLAPUR ROAD AT IR KMS: 771/23-771/25 BETWEEN
C CBE
DRM/NGP WARUD -SELOO ROAD STATIONS ON NAGPUR-WARDHA SECTION.
CPM/NGP
SPAN: 1x18m C.G + 2x24m C.G + 2x30m C.G.
PROPOSED ROAD DY.CE/BR -II
LEVEL (FRL) B
DETAILS OF ABUTMENT CAP (A1 ) SR.DOM/NGP SSE (DD)HQ

D SR.DEE(TRD)NGP
EXISTING ROAD
LEVEL
DETAILS OF PIER CAP (P1)
CONSULTING ENGINEERS GROUP
SR.DSTE/NGP

TO JAI PUR
SELOO ROAD
HORIZONTAL TO TUJLAPUR
SR.DEN (CO)NGP

STATION
TO SUKALI

NEXT
ALIGNMENT ROB-D244-NGP-LC 96-DRG-101
DY.CE(C-II)NGP

VERTICAL SUB-DIVISION ENGINEER SR.DEN(S)NGP


ALIGNMENT
STATION

EXECUTIVE ENGINEER SSE(WORKS)


WARUD
NEXT

R0
CHAINAGE
N

You might also like