Professional Documents
Culture Documents
Professional Summary
"Dedicated and results-driven Telecom/ISP engineer with IT Manager over 13 years of experience,
implementing, and optimizing telecommunications networks. Skilled in network, ISP, Wimax, O&M with
RF and network troubleshooting, with a proven track record of delivering robust and scalable solutions.
Proficient in a wide range of technologies, including TCP/IP, MPLS, VoIP, and wireless communication
standards. Adept at collaborating exceed client expectations. Seeking to leverage expertise in network
engineering to drive innovation and efficiency in a dynamic telecommunications environment."
-1-
August 2009 to April ’2012
Position Senior Engineer ,Pune
Project Bharti IWAN Project, Maharashtra , Global Telecom Limited
Job profile To Handle RF survey, I&C , O&M with AT of WiMAX Network
Responsibilities . Checking the proper installation & integration of Radwin & Alvarion Wimax site.
▪ Checking & installation of Switch & port
▪ Planning and optimization of Wimax core network segment and
wimax services
▪ Operation and maintenance of WiMAX core network segment
▪ Handling a team of 2 engineers for completion of the field project within time
frame.
▪ Handling team 4 technicians for Wimax Network installation of site & shelter.
▪ To get “AT certificate” signed by WiMAX customer personals after
satisfying them from the site issues & problems.
▪ Commissioning and integration of RICCI at MPLS end.
▪ Checking modules of RSS & SNR. .
▪ E1 through & configuration at BTS & MPLS end.
▪ Configure Switch & Ethernet at customer end
▪ 1.79 software up gradation of Radwin / Alvarion ODU with RICCI.
-2-
Educational back ground
Discipline : CCNA
CISCO,USA 2012
Personal
Name : Md Ejaz Anwar
Father's Name : Md Wasim
Gender : Male
Permanent Address : H.No-78, Imli Tola, Jhanda Chowk, Line Bazar,
Dist-Purnea-854301,Bihar
Nationality : Indian
Passport No : M1197156 Valid Up To 2024
Languages Known : English, Hindi, Urdu & Arabic.
Achievements
▪ Key role in launching Aircel Network in Bihar & Jharkhand after setting 24 BTS in just 43
days with proper call test & integration.
▪ Got highest appraisal points at the time of confirmation after training period.
▪ Promoted from BTS engineer to OMCR engineer in March 2007 on the recommendation of O&M
Manager after my commendable work in BTS.
-3-