You are on page 1of 4

NESCO

Date:Oct 12-03-2024

ABSTRACT OF COST
Nesco Construction & Services PVt
Project :- DEFENCE RAYA

WORK DONE QTYS


Sr.# Description Unit Amount Remarks
This Bill Previous Total

1- Bath At Tower -A No 160.00 160.00

2- Bath At Tower -B No 189.00 189.00

3- Bath At Tower -C No 93.00 93.00

SFT Total Quantity 442.00

TOTAL WORK DONE AMOUNT -


DEFENCE RAYA
MEASUREMENT SHEET
MEASUREMENT
Sr.No Description Nos Quantities
Length Width Height

Tower ( A ) Bath

At Level #01 1 x 1 18.000 18.000 Nos

At Level #02 1 x 1 16.000 16.000 //

At Level #03 1 x 1 24.000 24.000 //

At Level #04 1 1 22.000 22.000 //

At Level #05 1 1 12.000 12.000 //

At Level #06 1 1 15.000 15.000 //

At Level #07 1 x 1 15.000 15.000 //

At Level #08 1 x 1 16.000 16.000 //

At Level #09 1 x 1 14.000 14.000 //

At Level #10 1 x 1 5.000 5.000 //

At Level #11 1 x 1 3.000 3.000 //

Total Quantity 160.000 Nos


DEFENCE RAYA
MEASUREMENT SHEET
MEASUREMENT
Sr.No Description Nos Quantities
Length Width Height

Tower ( B ) Bath

At Level #01 1 x 1 26.000 26.000 Nos

At Level #02 1 x 1 25.000 25.000 //

At Level #03 1 x 1 24.000 24.000 //

At Level #04 1 1 21.000 21.000 //

At Level #05 1 1 12.000 12.000 //

At Level #06 1 1 14.000 14.000 //

At Level #07 1 x 1 14.000 14.000 //

At Level #08 1 x 1 15.000 15.000 //

At Level #09 1 x 1 17.000 17.000 //

At Level #10 1 x 1 13.000 13.000 //

At Level #11 1 x 1 5.000 5.000 //

At Level #12 1 x 1 3.000 3.000 //

Total Quantity 189.000 Nos


DEFENCE RAYA
MEASUREMENT SHEET
MEASUREMENT
Sr.No Description Nos Quantities
Length Width Height

Tower ( B ) Bath

At Level #01 1 x 1 27.000 27.000 Nos

At Level #03 1 x 1 17.000 17.000 //

At Level #04 1 x 1 22.000 22.000 //

At Level #05 1 1 12.000 12.000 //

At Level #06 1 1 15.000 15.000 //

Total Quantity 93.000 Nos