Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
1.0 GENERAL
This specification covers the technical requirements associated with
design, engineering, manufacturing, factory testing at manufacturer’s
(1) factory, packing for transportation, delivery, erection, site testing & Please confirm Confirmed. Noted. Closed
commissioning of the MV Switchgear with all necessary accessories
completely.
It is neither the Purchaser’s intent to specify all technical requirements nor
to set forth to those requirements adequately covered by applicable codes
(2) and standards. The Supplier shall furnish high quality equipment and Please confirm Confirmed. Noted. Closed
accessories meeting the requirements of this specification and the industry
standards.
All intrinsic equipment and accessories necessary for the proper and safe
(3) operation of the MV Switchgear furnished under this specification shall be Please confirm Confirmed. Noted. Closed
provided by the Supplier.
(4) All data, specification, drawings and documents shall be written in English. Please confirm Confirmed. Noted. Closed
(5) All units of measurements and dimensions shall be in SI (System Internation Please confirm Confirmed. Noted. Closed
The Supplier shall clearly declare his exceptions and deviations from the
technical specifications using Purchaser’s form. Any items not clearly
(6) Please confirm Confirmed. Noted. Closed
stated in the Supplier’s exceptions and deviations list shall be deemed
fully compliant with the Purchaser’s requirements.
2.2 Humidity
(1) Average relative humidity 84.2 % 84.2 % Noted. Closed
(2) Maximum relative humidity 100.0 % 100.0 % Noted. Closed
3.1.2 Miscellaneous
Accessories, appurtenances, spare parts, special tools and consumable
Please confirm Confirmed. Noted. Closed
for each set of Switchgear shall be supplied.
(1) Cable supports inside switchgear. Please confirm Confirmed. Noted. Closed
Furnishing all necessary installation materials including support steel
(2) Please confirm Confirmed. Noted. Closed
structures, base channel, foundation anchor bolts, nuts and washers, etc.
Furnishing C-channels for floor embedded supports for Switchgears and
(3) Please confirm Confirmed. Noted. Closed
panels. All embedded materials shall be Hot-Dip Galvanized (HDG)
Labels & nameplates mounted on the front and rear doors. It shall be
(4) Please confirm Confirmed. Noted. Closed
replaced at As-built stage without additional cost (if necessary)
Non-magnetized Blind plates & cable glands for power and control
(5) armoured cables at Switchgears and panels. The cable specification such Please confirm Confirmed. Noted. Closed
as size and number of cables will be informed at detail engineering stage.
Arc extinguish chambers, insulators and iron pieces shall be bound firmly
(6) Please confirm Confirmed. Noted. Closed
and free from cracks and damages.
(7) Socket/plugs for every current transformer and voltage transformer. Please confirm Confirmed. Noted. Closed
Grounding terminals and lugs for connection between the equipment and
(8) Please confirm Confirmed. Noted. Closed
grounding main mesh conductor.
Protection relay with related accessories. It shall be interfaced with
(9) Protection Relay Monitoring and Setting Station (Refer to Cl. 6.3.6 Please confirm Confirmed. Noted. Closed
Protection Relay Monitoring and Setting Station)
One laptop computer with software and hardware accessories for test of
protection relays used and its manuals. All necessary software programs
(10) Please confirm Confirmed. Noted. Closed
(with license) and hardware accessories (including connection cable) for
setting/test of protection relays and transducer
(11) Furnishing sufficient quantity of field touch-up paint Please confirm Confirmed. Noted. Closed
(12) All interconnection cables between Supplier’s equipment. Please confirm Confirmed. Noted. Closed
All equipment including FDF, Patch cord, Ethernet switch and Patch cord
(13) Please confirm Confirmed. Noted. Closed
and all interconnection cables including UTP cables for IEC 61850.
Provision of key interlock system for MV switchgear. The key interlock
scheme will be discussed with Supplier of LV Switchgear at detail
(14) Please confirm Confirmed. Noted. Closed
engineering stage. The supplier shall supply the related accessories as
per the key interlock scheme.
Provision of bus-duct system for MV switchgear. For detail of terminal
(15) point between MV switchgear and bus-duct, please refer to Attachment-9- Please confirm Confirmed. Noted. Closed
6_Detail of Terminal Points Between MV Switchgear and NSPB.
(16) Furnishing following spare parts, special tools and consumables: Please confirm Confirmed. Noted. Closed
(a) Mandatory Spare Parts (Base) Please confirm Confirmed. Noted. Closed
(b) Erection & Commissioning Spare Parts (Base) Please confirm Confirmed. Noted. Closed
Confirmed.
(c) 2 Years recommended spare parts (Option) Please confirm Noted. Closed
Offer the price as an option
(d) Erection & Commissioning Consumables (Base) Please confirm Confirmed. Noted. Closed
Confirmed.
(e) 2 Years Operating Consumables (Option)\ Please confirm Noted. Closed
Offer the price as an option
(f) Special Tools (Base)
Test equipment/instruments for site test/commissioning (Optional
(17) Please confirm Confirmed. Noted. Closed
Breakdown Price shall be submitted by use and return base)
3.1.3 Services
Design, manufacturing, factory test and inspection, packing and delivery of
(1) Please confirm Confirmed. Noted. Closed
all equipment including necessary accessories and appurtenances.
Furnishing all data, information, drawings and documents of Supplier’s
(2) equipment including instruction manuals for installation, site tests / Please confirm Confirmed. Noted. Closed
commissioning, operation and maintenance.
(3) Furnishing CT & VT study (including burden calculation). Please confirm Confirmed. Noted. Closed
CT & VT Sample Test by an approved independent testing authority in the
(4) Closed
local country.
(5) Furnishing protection relay coordination study and setting report. Please confirm Confirmed. Noted. Closed
(6) Calibration and report of supplied relays and meters. Please confirm Confirmed. Noted. Closed
(7) All required information for foundation design. Please confirm Confirmed. Noted. Closed
(8) All required information, drawings and documents. Please confirm Confirmed. Noted. Closed
Equipment numbering / labeling based on KKS numbering procedure
(9) Please confirm Confirmed. Noted. Closed
provided by Purchaser.
Communication test with Protection Relay Monitoring and Setting Station
(10) Please confirm Confirmed. Noted. Closed
(RMS Station) at site.
(11) 3D modeling data for Supplier’s equipment. Please confirm Confirmed. Noted. Closed
All setting program (with license) for supplied equipment including
(12) Please confirm Confirmed. Noted. Closed
transducer, protection relay, etc.
(13) All technical supports for Purchaser to get approval of local authorities. Please confirm Confirmed. Noted. Closed
Supplier shall attend following meetings during project execution period
(14) Please confirm Confirmed. Noted. Closed
when Purchaser request.
(a) Project kick-off meeting. Please confirm Confirmed. Noted. Closed
(b) Design review meeting with Purchaser and/or Owner. Please confirm Confirmed. Noted. Closed
(c) Video conference or Conference call with Owner for design clarification. Please confirm Confirmed. Noted. Closed
(15) Furnishing factory and site test report Please confirm Confirmed. Noted. Closed
Please submit the type test
(16) Furnishing type test certificate. Please confirm Confirmed. Please refer to attached file To be reviewed in next TBE. Noted and Closed. Closed
certificates.
TECHNICAL BID EVALUATION - A) RFQ Contents
PROJECT : TWO(2) x 700 MW QUANG TRACH I THERMAL POWER PLANT
ITEM : MV SWITCHGEAR
SUPPLIER : LSE VINA
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
The Warranty Period shall be twenty
four (24) months from the date of
issue of the the Provisional
Acceptance Certificate (PAC).
However, in case of any repair or
(17) Guarantee and warranty of all Supplier’s equipment. Please confirm Confirmed. replacement, for such parts shall Confirmed. Noted. Closed
start from the date of completion of
repair or replacement and will exire
on the maximum twenty four (24)
from the resolution date of the
defect.
Electrical equipment shall be protected with H2S protection emitters
(18) Confirmed. Noted.
before shipment.
Supervision Service (Option) Working hours (8AM ~ 6:00PM) in
Supplier shall ensure the timely presence of all necessary specialists offer sheet Please check revised quotation (24
Please submit as daily rate. Refer to revise the quotation (09 May
when requested by Purchaser for site installation, site test and Confirmed. : Working time shall exclude lunch May 2022 - R11) 10hr (working hour) /day and 1 hr
(19) Please confirm The daily rates shall be based on 10 2022 - R10) Confirmed. Closed. Closed
commissioning, initial operation and maintenance. Supplier's supervisor Offer the price as an option time and the working time shall be This item offered as an option price lunch time shall be considered
hr/day & 6 days/week. This item offered as an option price
shall be good at English thus communication shall be possible without 10 hr/day execpt lunch time. Please (page number 4, item II)
translator. revise.
Please check revised quotation (24
Refer to revise the quotation (09 May
Confirmed. May 2022 - R11)
(20) Shop training for Owner’s personnel (Option) Please confirm Noted. 2022 - R10) It is not shown. Please check again. Noted and Closed. Closed
Offer the price as an option This item offered as an option price
This item offered as an option price
(page number 4, item III)
Please check revised quotation (24
Refer to revise the quotation (09 May
Confirmed. May 2022 - R11)
(21) Site training for Owner’s personnel (Option) Please confirm Noted. 2022 - R10) It is not shown. Please check again. Noted and Closed. Closed
Offer the price as an option This item offered as an option price
This item offered as an option price
(page number 4, item II)
Refer to revise the quotation (09 May
Confirmed.
(22) Others, (if necessary during execution stage) Please confirm Noted. 2022 - R10) Noted.
Offer the price as an option
This item offered as an option price
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
6.2 Switchboards
The 11kV MV Unit Switchgears shall be supplied from their respective Unit
Auxiliary Transformer via bus duct. The 11kV MV Common Switchgears
(1) shall be supplied from their respective 11kV Unit switchgear bus via bus Please confirm Confirmed. Noted. Closed
duct or cable.
Each 11kV Bus section shall be supplied from two (02) respective supply
As part of the integrated control and monitoring system (ICMS) interface,
the Contractor shall provide a power (watts) and/or current transducer on
each circuit. These transducers shall have an output with a range of 4-20
(2) mA. Supply power for the transducer shall be obtained from the relevant Please confirm Confirmed. Noted. Closed
switchboard control circuit. Power transducers are required on all 11kV
circuits and 400V incoming circuits. The remaining circuits shall have
current transducers.
Switchboard circuits shall be provided in accordance with the switchboard
(3) Please confirm Confirmed. Noted. Closed
single line diagrams and circuit schematic diagrams.
A 20% spare compartment shall be provided for each current rating with
(4) Please confirm Confirmed. Noted. Closed
all equipment and hardware provided to receive starter modules
Switchboard busbars shall consist of hard drawn high conductivity copper
(5) Please confirm Confirmed. Noted. Closed
bar of uniform cross-section throughout the length of the switchboard.
Interlocks shall be provided to prevent switchboard control of the
(6) switchgear unless the switchgear is in the service and test (switchboard) Please confirm Confirmed. Noted. Closed
positions.
Trip interlocks shall be provided to prevent racking-in or racking-out whilst
the switch is closed. Mechanical and electrical interlocks shall be provided
(7) Please confirm Confirmed. Noted. Closed
to prevent operation of the switchgear unless it is fully racked-in or racked-
out.
The main busbars and all connections thereto and busbar supporting
(8) insulators shall be capable of withstanding for one second the mechanical Please confirm Confirmed. Noted. Closed
and thermal stresses arising from the maximum possible fault currents.
All jointing surface on busbars and connections thereto shall be either
electrotinned, solder-tinned or silver plated and shall be firmly bolted
(9) together with suitably spaced bolt assemblies. The components of each Please confirm Confirmed. Noted. Closed
bolt assembly shall be fully machined and shall be stainless steel,
phosphor or manganese bronze.
The busbar and busbar enclosure shall be arranged to facilitate extension
(10) Please confirm Confirmed. Noted. Closed
of the busbars for the connection of additional switchgear units.
The sheet metal switchboards shall be constructed of folded and welded
sheets of 2.0mm minimum thickness and where equipment is to be
(11) Please confirm Confirmed. Noted. Closed
mounted on a panel the thickness of the sheet metal shall be sufficient to
prevent vibration affecting the correct operation of the equipment.
If switchboards are located in areas where the floor may become wet it
shall be placed on 10 cm high concrete supports with an apron and ramp
(12) to facilitate the rolling of circuit breakers up to, into and out of the Please confirm Confirmed. Noted. Closed
compartments. In all cases the switchboards shall be mounted on steel
leveling channels.
The minimum size of the switchboard earth bus shall be designed to
(13) handle the maximum expected fault level for a time determined by the Please confirm Confirmed. Noted. Closed
maximum back-up protection clearance time.
The switchboard cable entry facilities shall be designed to suit the
(14) Please confirm Confirmed. Noted. Closed
proposed cabling system (bottom entry preferred).
All switchboards shall be vermin, insect, animal and dust proof.
Switchboards requiring ventilation shall be constructed as dustproof
(15) Please confirm Confirmed. Noted. Closed
except for the ventilation louvers, which shall be backed with fine non-
corrodible gauze filters. Filters shall be able to be removed for cleaning.
Each outgoing circuit operating at 1,000V or above shall be provided with
an earthing switch. Earthing switches shall be mechanically interlocked
(16) Please confirm Confirmed. Noted. Closed
with the adjacent insolating switch and key interlocked with any remote
isolating switch.
(17) Each bus shall be provided with one earthing switch. Please confirm Confirmed. Noted. Closed
The minimum size of the switchboard earth bus shall be designed to
handle the maximum expected fault level for a time determined by the
(18) Please confirm Confirmed. Noted. Closed
maximum back-up protection clearance time or 300 mm2 conductor
whichever is the greater.
The switchboards shall have been tested for arcing fault containment to
(19) Please confirm Confirmed. Noted. Closed
IEC.
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
Ground Bus
A ground bus, rated to carry maximum fault current, shall extend the entire
length of the switchgear.
Each stationary unit shall be connected directly to the ground bus. The
(5) frame of each circuit breaker and draw-out VT unit shall always be Please confirm Confirmed. Noted. Closed
grounded through heavy multiple contacts, except when the primary
disconnecting devices are separated by a safe distance. CT and VT
secondary neutrals shall be earthed through removable links so that earth
of one circuit may be removed without disturbing the other
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
Surface preparation, cleaning and painting shall be in accordance with
(1) Please confirm Confirmed. Noted. Closed
Attachment-11: Painting Specification
The cleaning and painting for all the equipment shall be made suitably for
(2) Please confirm Confirmed. Noted. Closed
use under saline environment close to the sea at the site.
The relative humidity of 100% shall be applied for protection of equipment
(3) only for mechanical and electrical equipment such as material selection, Please confirm Confirmed. Noted. Closed
painting and electrical clearance.
The painting specification with final colors and identification system for the
(4) Please confirm Confirmed. Noted. Closed
equipment shall be approved from the Purchaser.
The Supplier shall make suitable surface treatment for prevention of the
(5) Please confirm Confirmed. Noted. Closed
rust and corrosion during the sea transportation.
The application for the inspection not including the test report conducted
by the Bidder shall be rejected. If there occurs the delay in supply of the
Goods resulted from the application for the inspection shall be the Bidder’s
responsibility. The Bidder shall submit a Quality Assurance Program
Manual, quality inspection plans, field test and inspection plans, field test
(c) Please confirm Confirmed. Noted. Closed
and inspection procedures for the Purchaser's review and acceptance
prior to preceding the effective activities. All the test and inspection for the
Bidder’s equipment shall be conducted in accordance with the applicable
Codes and Standards, including prudent practices in the utility industries,
unless otherwise specified in this Specification.
8.1 General
All the test and inspection for the Supplier’s equipment shall be conducted
in accordance with the applicable Codes and Standards, including prudent
practices in the utility industries, unless otherwise specified in this
Specification. The detail of test and inspection shall be referred to
(1) Attachment 02_General Technical Requirement for General & Mechanical, Please confirm Confirmed. Noted. Closed
Attachment 03_General Technical Requirement for Electrical, Attachment
04_General Technical Requirement for Instrument and Control, and
Attachment 08_General Quality Requirements. If requirements are
conflict, more severe condition shall be followed.
Unless otherwise specified all tests listed in the relevant Standard shall be
carried out together with any additional tests required by the Specification.
(2) Despite anything to the contrary contained in the Standard, all Type Test, Please confirm Confirmed. Noted. Closed
Special Test, Routine Tests, Sampling tests and other tests shall be
carried out.
All instruments to be used, in connection with these tests shall be
(3) calibrated before tests. The Supplier is requested to provide the calibration Please confirm Confirmed. Noted. Closed
certificates for each instrument used during these tests.
The Electrical equipment shall be tested and certificated in accordance
with all the relevant provisions of the IEC standard and Vietnam's code
(4) Please confirm Confirmed. Noted. Closed
and standards listed in this Section. The test items, acceptance
values/criteria and Standard shall be shown clearly on the Test Reports.
All Type Test, Special Test, Routine Tests, Site Test, Sampling tests
reports shall be submitted to the Purchaser. The Supplier shall be
responsible to inform, submit the report of the root cause analysis and
(5) remedial actions/ countermeasures for any Please confirm Confirmed. Noted. Closed
troubles/fails/damages/incident/defect work of electrical equipment to the
Purchaser during the installation, testing and commissioning for
information within one (01) week after the trouble/incident occurred.
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
Following site assembly in final positions and the completion of Please check the test (a) ~ (n) and
(1) Please confirm Out of scope Confirmed. Noted. Closed
connections, testing shall include at least the following: confirm to include.
(a) Point to point wiring checks. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(b) Switch operational checks. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(c) Mechanical racking interlock checks. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(d) Primary circuit connections and phasing checks including power cabling. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
Protection primary and secondary injection tests, operation, calibration
(e) Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
and interface checks.
Plant system functional checks including control, indication, alarms etc.
(f) Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
interface.
(g) Power frequency HV tests for main and auxiliary circuit Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(h) Mechanical and Electrical interlock tests Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(i) Insulation resistance measurement. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(j) Contact Resistance test Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(k) Protection relay test Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(l) (Voltage Transformer/ Current Transformer/Surge Arrester) Test Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(m) Auxiliary circuit test Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
(n) Ect. Please confirm Out of scope Please confirm this test. Confirmed. Noted. Closed
The supplier shall comply with the Purchaser's Packing Instruction below:
(1) Please confirm Confirmed. Noted. Closed
- Refer to Attachment-12_Shipping and Packing Instruction
(2) Outline & Arrangement Drawing including opening information Please submit Yes Noted. Closed
(3) Technical Data Sheet Please submit Yes Noted. Closed
(4) Equipment List Please submit Yes Noted. Closed
(5) Power Consumption List Please submit Yes Noted. Closed
TECHNICAL BID EVALUATION - A) RFQ Contents
PROJECT : TWO(2) x 700 MW QUANG TRACH I THERMAL POWER PLANT
ITEM : MV SWITCHGEAR
SUPPLIER : LSE VINA
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply Supplier's 6th Reply
HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3nd Comment HEDC's 4th Comment HEDC's 5th Comment
(LSE Viet Nam) LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No. Description Requirement Status Remarks
(2022-03-25) (2022-04-21) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (2022-10-05) (2022-10-27)
(6) Heat Dissipation Data Please submit Yes Noted. Closed
(7) Loading Data Please submit Yes Noted. Closed
EVALUATION GRADE
A : ACCEPTABLE
B : ACCEPTED THRU MTG OR TLX CONFIRMATION
C : MINOR DEVIATION ACCEPTABLE UNDER OWNER'S APPROVAL
D : CONFIRMATION NECESSARY BEFORE P.O
F : REJECTED
M : OTHER COMMENT
― : NOT APPLICABLE
TECHNICAL BID EVALUATION - B) Technical Specification
PROJECT : TWO(2) x 700 MW QUANG TRACH I THERMAL POWER PLANT
ITEM : MV SWITCHGEAR
SUPPLIER : LSE VINA
Any information and data shown in this table will not exempt Vendor from his responsibility for contractor's requirements
unless Vendor submit his exceptions clearly using contractor's form 'Deviation & Clarification'.
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply
Item HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3rd Comment HEDC's 4th Comment Remark
Description Unit Requirement Status LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No.
(06/4/2022) (2022-04-25) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (19 July 2022) (2022-07-20)
1.0 MV Switchgear
(1) Manufacturer - By Supplier A LS Electric Noted.
Please confirm that supplier shall Please confirm that supplier shall
(4) Applicable Standard - IEC and Local Standards A IEC Confirmed with Deviation sheet. Confirmed. Noted and Closed.
follow all requirements in GTR-E. follow all requirements in GTR-E.
(6) Type of Switchgear - Metal Clad (LSC2B) A Metal Clad (LSC2B) Noted.
(8) Busbar
(a) Material - Electrolytic Copper A Electrolytic Copper Noted.
(b) Type of support insulation - By Supplier A Epoxy Noted.
(c) Type of busbar insulation - By Supplier A Heat shrink tube Noted.
(d) Sectional Area
Please change the sectional area as
* Unit Switchgear mm2 By Supplier A 3-12x100 3600 mm2 Noted.
mm2
Please change the sectional area as
* Station Switchgear mm2 By Supplier A 2-12x60 1440 mm2 Noted.
mm2
Please change the sectional area as
* CWP Switchgear mm2 By Supplier A 1-12x60 720 mm2 Noted.
mm2
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply
Item HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3rd Comment HEDC's 4th Comment Remark
Description Unit Requirement Status LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No.
(06/4/2022) (2022-04-25) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (19 July 2022) (2022-07-20)
(d) Rated Voltage kV 12 A 12 Noted.
(e) Rated Current (for each type) to IEC A 1250 to 4000 A 1250 to 4000 Noted.
(f) Rated Short Circuit Making Current kA By Supplier A 125 Noted.
(g) Rated Short Circuit Breaking Current
* Symmetrical kA By Supplier A 50 Noted.
Modbus RTU/
(f) Output mA 4-20 A Noted.
(4-20mA by transducer)
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply
Item HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3rd Comment HEDC's 4th Comment Remark
Description Unit Requirement Status LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No.
(06/4/2022) (2022-04-25) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (19 July 2022) (2022-07-20)
(c) Zero Sequence Current Transformer
Manufacture: Esitas or equivalent
* Manufacturer & Model No. - By Supplier A As per SLD Please fill up Noted.
Model No: KAT or equivalent
* Primary A 50 A 50 Noted.
* Secondary A 1 A 1 Noted.
* Accuracy class for Protection & Measuring - By Supplier A 5P20 Noted.
Noted. Please submit the calculation
* Burden VA By Supplier A 5VA of CT burden to us at detail Noted. Please confirm it. Confirmed. Noted and Closed.
engineering stage.
Cooper or Ensto
(b) Manufacturer & Model No. - By Supplier A Noted.
UHS or HE
(c) Rated Voltage kV 12 A 12 Noted.
(d) Rated Frequency Hz 50 A 50 Noted.
Noted. Please submit the calculation
(e) Nominal Discharge Current kA By Supplier A 10 of Surge arrester to us at detail Noted. Please confirm it. Confirmed. Noted and Closed.
engineering stage.
(20) Accessories
(a) Plug-in Units (CTT/PTT) Yes / No Yes A Yes Noted.
(b) Indication Lamp (LED) Yes / No Yes A Yes Noted.
(c) Open-Close Switch Yes / No Yes A Yes Noted.
(d) Local-Remote Switch Yes / No Yes A Yes Noted.
(e) Name Plate and Label Yes / No Yes A Yes Noted.
(f) Terminal Block (Including spare : 20% of total terminal block) Yes / No Yes A Yes Noted.
(g) Ethernet Switch Yes / No Yes A Yes Noted.
(h) Media Converter Yes / No Yes A Yes Noted.
(i) Interconnection Wiring Yes / No Yes A Yes Noted.
(j) Space Heater Yes / No Yes A Yes Noted.
(k) Lighting (LED) Yes / No Yes A Yes Noted.
(l) Receptacle Yes / No Yes A Yes Noted.
(m) Voltage Detector Yes / No Yes A
(25) Weight
(a) Unit Switchgear
* Incoming kg A 2000 Noted.
* VT & ES Panel kg A 1000 Noted.
* Motor Feeder (1MW and Above) kg A 1250 Noted.
* Motor Feeder (Below 1MW) kg A 1250 Noted.
* Non-motor Feeder kg A 1250 Noted.
* Dummy kg A 1250 Noted.
* High Speed Bus Transfer kg A 600 Noted.
(b) Station Switchgear
* Incoming kg A 1500 Noted.
* VT & ES Panel kg A 1000 Noted.
* Motor Feeder (1MW and Above) kg A 1250 Noted.
TECHNICAL BID EVALUATION - B) Technical Specification
PROJECT : TWO(2) x 700 MW QUANG TRACH I THERMAL POWER PLANT
ITEM : MV SWITCHGEAR
SUPPLIER : LSE VINA
Any information and data shown in this table will not exempt Vendor from his responsibility for contractor's requirements
unless Vendor submit his exceptions clearly using contractor's form 'Deviation & Clarification'.
Supplier's Proposal Supplier's 2nd Reply Supplier's 3rd Reply Supplier's 4th Reply Supplier's 5th Reply
Item HEDC's 1st Comment HEDC's 2nd Comment TBE Meeting HEDC's 3rd Comment HEDC's 4th Comment Remark
Description Unit Requirement Status LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam LSE Viet Nam
No.
(06/4/2022) (2022-04-25) (2022-05-04) (2022-05-16) (2022-05-23) (2022-06-07) (17 Jun 2022) (2022-07-15) (19 July 2022) (2022-07-20)
* Motor Feeder (Below 1MW) kg A 1250 Noted.
* Non-motor Feeder kg A 1250 Noted.
* Dummy kg A 1250 Noted.
* High Speed Bus Transfer kg A 600 Noted.
(c) CWP Switchgear
* Incoming kg A 1350 Noted.
* VT & ES Panel kg A 1000 Noted.
* Motor Feeder (1MW and Above) kg A 1250 Noted.
* Motor Feeder (Below 1MW) kg A 1250 Noted.
* Non-motor Feeder kg A 1250 Noted.
* Dummy kg A 1250 Noted.
* High Speed Bus Transfer kg A 600 Noted.
Supplier's Reply HDEC's Answer Supplier's Reply TBE Meeting Supplier's Reply HDEC's Answer Supplier's Reply HDEC's Answer Supplier's Reply HDEC's Answer Supplier's Reply HDEC's Answer Supplier's Reply HDEC's Answer Supplier's Reply HDEC's Answer
No. Item HDEC Clarification items Status Remarks
LSE Viet Nam (09 May 2022) (16 May 2022) LSE Viet Nam (23 May 2022) (07 June 2022) LSE Viet Nam (17 Jun 2022 ) (15 July 2022) LSE Viet Nam (19 Jul 2022 ) (20 July 2022) LSE Viet Nam (21 Jul 2022 ) (04 Oct 2022) LSE Viet Nam ( ) (24 Oct 2022) LSE Viet Nam ( ) (4 Nov 2022) LSE Viet Nam ( ) (17 Nov 2022)
1 Panel Arrangement The arrangement of panel will be fixed at detail Confirm Noted.
engineering stage. Please confirm it. Closed
2 Embedded Materal The embedded materials for Unit-1A/1B/2A/2B and Confirm Please submit the BM for embedded BM is provided after contract. But please Bidder confirmed that embedded
Station-A/B are scope of suppler. material to review. refer to reference documents. material is included in quotation as per
Please confirm and submit the BM for embedded requirement. Closed
material.
3 HSTS Please provide HSTS system for separated panel. Confirm Please submit the reference drawing. Refer to reference drawing. Refer to attached file. Noted.
Bidder will provide the reference drawing
for HSTS (SUE 3000). Closed
4 Logic Diagrm Please confirm the logic diagram. But the logic Confirm Noted.
daigram can be changed at detail engineering
stage. Closed
5 Power Consumption Please revise the AC and DC power consumption Refer to revised Power Consumption Noted.
for each group. Closed
6 A) RFQ Contents [Requirement] Please refer to attached catalog. HDEC will submit the clarification to Confirm The deviation/clarification is rejected by Our VCB'control voltage is comply to Confirmed. Please follow IEC standard.
6.1 (2) and (13) The circuit breakers and switching devices shall be Closing coil: 85-110% Un owner. After receiving approval from owner. Therefore, please check the IEC standard. Please refer to IEC
capable of meeting their rated performance when Triping coil: 70-110% Un owner, it can be closed. Please confirm requirement. 62271-1, Closing coil: 85-110% Un
the voltage at the closing device or at the shunt trip (Un =220VDC) it. Triping coil: 70-110% Un
coils is any value from 176V to 264V. 176V to 264V is not comply to IEC. At
this moment we do not have non-
[Supplier's answer] standard control voltage range.
Closed
Closing coil: 187V~ 242V By the way, we've done some thermal
Triping coil: 154V~ 242V power plant in Vietnam as per Mong
Duong TPP, Long Phu TPP, Vinh Tan...
Please submit the technical justification letter to get All of them comply to IEC standard.
the owner's approval.
7 Power Frequency Withstand [Requirement] 28kV is complied to IEC standard. HDEC will submit the clarification to Noted. The deviation/clarification is rejected by Our VCB' power frequency withstand Confirmed. Please apply to power
Voltage Power Frequency Withstand Voltage: 45kV Please refer to attached IEC standard. owner. After receiving approval from owner. Therefore, please check the voltage is comply to IEC standard. frequency withstand voltage of 28kV.
owner, it can be closed. Please confirm requirement. Please refer to IEC 62271-1, The IEC
[Supplier's answer] it. requirement value is 28kV.
Power Frequency Withstand Voltage: 28kV 45kV is not comply to IEC. At this
moment we do not have non-standard
Please submit the technical justification letter to get value. Please change the value to IEC
Closed
the owner's approval. standard.
By the way, we've done some thermal
power plant in Vietnam as per Mong
Duong TPP, Long Phu TPP, Vinh Tan...
All of them comply to IEC standard.
8 Outline Drawing Please see our comments on drawing. Refer to revised outline drawing. Please see our comments on drawing. 1. Outline drawing is revised. Noted and Closed.
2. Confirmed.
1. How to connect the busduct to 3. Confirmed.
switchgear? Please provide the 4. Outline drawing is revised.
reference drawing.
2. The arrangement of phase will be
fixed as per busduct connection. Please
confirm it.
3. Please delete arc-duct to outside. Closed
And, please confirm the arc-proof design
for MV switchgear without exhaust arc-
duct.
4. Please indicate the dimension of arc-
duct.
9 Cable Gland Plate The power and control cables will be terminated to Confirm Noted.
SWGR. Suitable threaded entry on cable gland
plate shall be provided.
The detail size and quantites of gland opening will
Closed
be informed at detail design stage. Please confirm
it.
12 Quotation Sheet I. 41 ~ 43 Dummy-1/2/3 shall be Confirm. Please include 'Dummy Panel' in your Quotation is revised. Please check our comments on
optional price and these shall be not Refer revised quotation R11 (24 May quotation as per feeder list. Quotation Sheet Quotation is revised as per comment in
included in total price. 2022), page 4, item VI as an option Noted and Closed. Closed
quotation sheet
price.
13 Quotation Sheet OPTION III. INSPECTION & TESTING Confirm. Noted and Closed.
AT THE SITE (OPTION) : Refer revised quotation R11 (24 May
Please indicate the unit price for 12kV 2022), page 4, item IV as an option
SWGR, Control & Relay SWGR also. price. Closed
Because, the number of Panel could be
changed after Contract.
14 Bus-Duct Confirm with revised quotation. The bus-ducts for MV SWGR are not
Bidder will check the following bus-duct scope of supply. It will be provided by
size. other supplier. Therefore, please review
- 2000A: 1400 x 450 the attached drawing.If you have any
- 4000A: 1650 x 500 comments to connect the bus-duct to Incoming busduct is not busduct.
MV SWGR, please send it. Because the busduct is very big size The adapter at connection point will be
(busduct 1650 and our SWGR 1050, supplied by bus-duct supplier.
In case of scope of supply between busduct 1400 and our SWGR 850). So Therefore, the junction panels are not
Confirmed Noted and Closed. Closed
SWGR and Bus-duct, please see we need junction panel (incoming required. For detail connection design,
Attachment-9-6_Detail of Terminal busduct)l to connect to busducts. We will to be discussed at detail enginering
Points Between MV Switchgear and combine junction panel with incoming stage. Please confim it.
NSPB in RFQ. panel in the quotation.
22 The supplier shall confirm to provide the Confirmed. Please apply to ethernet switch GE S20 Confirm and revise quotation. S20 is Noted. Noted and Closed.
following : and reflect in your quotation. applied. Please confirm the attachment.
- CID file of protection relay for interface
with RMS (Relay Monitoring & Setting) Please confirm it. - Ethernet Switch for Relay monitoring - Confirmed.
- Protection Relay software for setting System Interface shall be GE Reason
and analysis in RMS (Relay Monitoring S20 for system compatibility.
& Setting) workstation. Closed
- Please refer to attached ordering code
Please confirm. as minimum requirement. - Comply
The exact ordering code will be decided
at the detail design stage.
23 Please reflect the document of MV Reflect in new quotation. In Noted. Please reflect the document of Quotation is revised following Feeder list Quotation is revised following Feeder list Quotation is updated. Noted and Closed.
SWGR Feeder List_Rev.D. CONNECTION TO 11kV UNIT SWGR MV SWGR Feeder List_Rev.E. Rev E. Rev F.
Change specification CT class from
5P20 to CLX. The price is not change for Please check cable size for each feeder
this one. and consider cable gland. Cable gland is comply the cable size. Closed
25