RAIWIND CONCRETE Noor Ul Hassan

0309-7075136
23 Km, Main Raiwind Road, Near Go Pump, Lahore Date: 10/03/2024

Subject Sultan Mahmood Project Location Pajian

Height 7 Running Feet 400

Quatation Sheet Material Calculation


Rate Length Total TRFT NOS
H Column (6x7) 245 x 12 2940 RFT 400 8 50
Rate Nos
Planks (8'x1'x2") 1150 x 7 8050 50 7 350
Strip (8'x4"x2") 850 x 0 0 0
Cap (6x7) 250 x 1 250 50 1 50
Total Aamount of wall 11240 Base Material
Per RFT Rate 1405 Per RFT
Total 0
Weight Labour Charges
Total RFT Weight
H Column 15.5 186 Nos 50 9300 Per RFT 250
Plank 83 581 Nos 350 29050 Total 100000
Strip 28 0 Nos 0 0
Cap 2 2 Nos 50 100
Total 769 Total 38450 Material Charges
Column 147000
Weight in Ton 38.45 Planks 402500
Per Ton Rate 1200 Strips 0
Total Carriage in Rupees 46140 Caps 12500
Total 562000
Grand Bill after all calculations

Material Charges 562000 Per RFT Rate according by Client


Base Material 0
Carriage 46140
Labour 100000 Per RFT 1770.35
Grand Total 708140