0309-7075136 23 Km, Main Raiwind Road, Near Go Pump, Lahore Date: 10/03/2024
Subject Sultan Mahmood Project Location Pajian
Height 7 Running Feet 400
Quatation Sheet Material Calculation
Rate Length Total TRFT NOS H Column (6x7) 245 x 12 2940 RFT 400 8 50 Rate Nos Planks (8'x1'x2") 1150 x 7 8050 50 7 350 Strip (8'x4"x2") 850 x 0 0 0 Cap (6x7) 250 x 1 250 50 1 50 Total Aamount of wall 11240 Base Material Per RFT Rate 1405 Per RFT Total 0 Weight Labour Charges Total RFT Weight H Column 15.5 186 Nos 50 9300 Per RFT 250 Plank 83 581 Nos 350 29050 Total 100000 Strip 28 0 Nos 0 0 Cap 2 2 Nos 50 100 Total 769 Total 38450 Material Charges Column 147000 Weight in Ton 38.45 Planks 402500 Per Ton Rate 1200 Strips 0 Total Carriage in Rupees 46140 Caps 12500 Total 562000 Grand Bill after all calculations
Material Charges 562000 Per RFT Rate according by Client
Base Material 0 Carriage 46140 Labour 100000 Per RFT 1770.35 Grand Total 708140