16.Template-BCP Testing Report

The document summarizes the results of testing the business continuity plan (BCP) for AWS cloud disaster recovery in Singapore. Key activities included restoring backup from Mumbai, reconfiguring security groups, testing connectivity, and addressing issues. The test was completed within the 180 minute recovery time objective. Suggestions were made to capture more details and include additional test scenarios in the future.

Uploaded by

jonny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
4K views9 pages

16.Template-BCP Testing Report

The document summarizes the results of testing the business continuity plan (BCP) for AWS cloud disaster recovery in Singapore. Key activities included restoring backup from Mumbai, reconfiguring security groups, testing connectivity, and addressing issues. The test was completed within the 180 minute recovery time objective. Suggestions were made to capture more details and include additional test scenarios in the future.

Uploaded by

jonny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • Introduction
  • BCP Testing
  • Annexure 1 - Screenshots of Availability and conducting Operations

BCP Test Report

Document Control

DOCUMENT NAME: Business Continuity Test, AWS DR Test

DOCUMENT ID REFERENCE: 1.2

Document Revision History

Version Release Date Change Description

1.0 Initial Release

Written By:

Checked By:

Approved By:
BCP Test Report

Business Continuity Plan- Testing Report


Issue Date:

Service Line: AWS Cloud DR Test

Service Leader:
BCP Test Report

Contents
1 Introduction..................................................................................................................... 4
1.1 Purpose....................................................................................................................................4
1.2 Scope.......................................................................................................................................4
2 BCP Testing..................................................................................................................... 5
2.1 Conducting the test.................................................................................................................5
2.1.1 Test Scenario...............................................................................................................5
2.2 Reporting Test Results............................................................................................................6
2.2.1 BCP Scenario Test Card..............................................................................................6
2.3 After Test Meeting..................................................................................................................6
2.3.1 Summary of Test Results.............................................................................................6
2.3.2 Issues or Concerns.......................................................................................................6
2.3.3 Suggestions & Feedback.............................................................................................6
3 Annexure 1 – Screenshots of Availability and conducting Operations.....................7

Ver 1.0
Page 3 of 12
BCP Test Report

1 Introduction

1.1 Purpose

Business continuity plan needs to be tested. The result of testing to be used as an input to update and
maintain the BCP Plans based on suggested improvement, corrective action and recommendations

1.2 Scope

The scope of this BCP testing is for AWS- Singapore going down. Testing the Business
Continuity Plan to cover the aspect that the AWS- Singapore is not accessible in case of a
disaster and Mumbai region backup shall be re-stored and used as primary.

1.3 Objective
To test the preparedness of the in case of unavailability AWS Singapore

2 BCP Testing

2.1 Conducting the test

Date:

2.1.1 Test Scenario

1. Scenario Description

Testing the Business Continuity Plan to cover the aspect that the AWS Singapore is
unavailable due to a disaster and backup maintained at AWS Mumbai shall be used to
conduct the operations and clients services & Organization business continues.

2. Resources

Number of FTEs participating in Test: 04

Name Designation
DevOps (IT)
DevOps (IT)
Operations

Ver 1.0
Page 4 of 12
BCP Test Report

2.2 Reporting Test Results

2.2.1 BCP Scenario Test Card

Time of Testing: 18:10 IST

Test Location: AWS Mumbai.

Recovery Time Objective

Time taken for starting operations from home (should be within RTO):

180 Minutes

The CloudOps Lead along with Team will initiate the restoration of Backup and start using backup as the
primary Data by following below steps:
• Pull latest backup from another/backup region
• Restore server and db from latest backup
• Re-map security group with instance
• Re-associate EIP with new instance
• ELB health check
• Basic smoke testing( environmental, functional testing)
• Re-map IAM role with instance
• Re-map Cloudwatch custom metrics
• Test connection

2.3 After Test Meeting

2.3.1 Summary of Test Results

Mission Critical Application’s backup is restored and tested and determined that

restored data is integral to continue business.

<PLACEHOLDER: The list of Mission critical applications/Database goes here>

Ver 1.0
Page 5 of 12
BCP Test Report
Activities Performed along with Time spent

Recovery ETA Time


Actual
Sl. No. Action Time Time Frame
Time Date
Objective Frame (min)

In case of the Server failures resulting in the


application down time, following are the actios
to be performed by the DevOps team
1

Pull latest backup


2 Restore server and database from latest
backup
Re-map security group with instance
3
Re-associate EIP with new instance
5

ELB health check


6
Basic smoke testing( environmental, functional
testing)
7
Re-map IAM role with instance
8
Re-map Cloudwatch custom metrics
8
Test connection

Since the backup happens once a day so Recovery Point Objective is 24 Hours

2.3.2 Issues or Concerns

No Issues were reported during testing.

2.3.3 Suggestions & Feedback (Lessons Learnt)

Following Improvement points were suggested by AVP Operations:

1. Capture the IP Address details from the systems which was used to conduct tests.

2. Include more scenarios in tests in next cycle.

2.3.4 Test Result Approved by

CISO

Ver 1.0
Page 6 of 12
BCP Test Report

Annexure 1 – Screenshots of activities performed

Screenshot 1

Description of Activity: Screenshot showing pulling of latest backup and restoration of database

Screenshot 2

Description of Activity: Screenshot showing pulling of latest backup and restoration of database

Screenshot 3

Description of Activity: Screenshot showing pulling of latest backup and restoration of database

Ver 1.0
Page 7 of 12
BCP Test Report

Screenshot 4

Description of Activity: XXX

Screenshot 5

Description of Activity: Re-map security group with Instance

Screenshot 6

Description of Activity: Re-associate EIP with new instance

Screenshot 7

Description of Activity: Re-Map IAM role with Instance

Screenshot 8

Description of Activity: Re-Map CloudWatch metrics

Ver 1.0
Page 8 of 12
BCP Test Report

Ver 1.0
Page 9 of 12

BCP Test Report
Document Control
DOCUMENT NAME: Business Continuity Test, AWS DR Test    
DOCUMENT ID REFERENCE: 1.2
Document
BCP Test Report
Business Continuity Plan- Testing Report
Issue Date: 
Service Line: AWS Cloud DR Test 
Service Leader:
BCP Test Report
Ver 1.0
Page 3 of 12
Contents
1
Introduction.................................................................
BCP Test Report
Ver 1.0
Page 4 of 12
1
Introduction
1.1
Purpose
Business continuity plan needs to be tested. The result of te
BCP Test Report
Ver 1.0
Page 5 of 12
2.2
Reporting Test Results
2.2.1
BCP Scenario Test Card
Time of Testing: 18:10 IST
BCP Test Report
Ver 1.0
Page 6 of 12
Activities Performed along with Time spent
Sl. No.
Action
Recovery
Time
Objective
ETA
Ti
BCP Test Report
Ver 1.0
Page 7 of 12
Annexure
 
   1    –    Screenshots
 
   of
    activities performed
 
 
Screenshot 1
De
BCP Test Report
Ver 1.0
Page 8 of 12
Screenshot 4
Description of Activity: XXX
Screenshot 5
Description of Activity: Re-map s
BCP Test Report
Ver 1.0
Page 9 of 12