CONSTRUCTION COMPOUND WALL PARKING LANDSCAPPING FURNITURE & FITOUT PREOPENING COST 1 YEAR INSTALLMENT TOTAL COST
AREA RATE TOTAL RMT RATE TOTAL INTERLOCK AREA RATE TOTAL AREA RATE TOTAL RATE RATE RATE RATE
6,954,000
2 THIRD FLOOR 3,016 4,000 12,064,000 252 500 126,000 3,301 200 660,200 1,300 150 195,000
10,484,000
3,970,000
10,484,000
6,954,000
1 RAFT 6,180,000 3,896,000 1,562,000 6,180,000 1,556,000 890,000 3,896,000 6,180,000 1,556,000 1,562,000
2 CONSTRUCTION 50,120,000 24,460,750 5,392,000 50,257,750 8,928,000 3,080,000 24,460,750 50,257,750 8,928,000 5,392,000
8 1 YEAR INSTALLMENT 0 0 0 0 0 0 0 0 0 0
57,290,500 28,356,750 6,954,000 57,418,950 10,484,000 3,970,000 29,592,550 56,437,750 10,484,000 6,954,000