Professional Documents
Culture Documents
1
2'
2'
C1
6" C2 6"
RETAINING WALL
RETAINING WALL
17'
2' 2'
2
2'
2'
6" C3 6"
C4
11'-6"
2' 2'
3
2'
2'
6" C5 6"
C6
RETAINING WALL
RETAINING WALL
14'-5"
3" 3"
1'-6" 1'-6"
1'-6"
3"
3"
4
2'
2'
C8
1'-6"
C7 C9
1'-6"
1'-6"
5'
6" 6"
RETAINING WALL
RETAINING WALL
5 C10 C11
RETAINING WALL
4'-4"
6" 6"
C13
6
1'-6"
1'-6"
C12
1'-6"
1'-6"
4'
LAYOUT OF COLUMNS
NOTE:
1) ALL COLUMNS ARE CENTRALLY PLACED ALONG THE GRID LINES UNLESS NOTED
OTHERWISE (UNO)
2) IF THIS DIMENSION IS NOT ACHIEVED AT SITE, THE DISCREPANCY SHALL BE BROUGHT TO
THE NOTICE OF THE ENGINEER AND ARCHITECT ABHYYUDAYA
STRUCTURAL CONSULTANTS
ST-LK77-FD-01 A2 R0
3'
4'
1
8'-9"
C1
C2
5'-9"
8'-9"
2'-3"
6'
Y10-8"C/C.
8'-6" 8'-6"
AT MID SPAN
17'
4' 4'
10' 10'
5'-3"
5'-3"
10'-6"
10'-6"
2 GRADE SLAB
C3 5" THK. C4
7'-6" 3'-9"
11'-6"
10'
5'-3"
10'-6"
10'-6"
3
C5
5'-3"
CLOUDED FOOTING AND RETAINING C6
7'-6" WALL TO TAKEN TILL LIFT PIT LEVEL 3'-9"
(REFER SECTION 1-1)
14'-5"
10' 4'
4'
10'-9"
7'-9" 7'
2"
2"
4'-71
4'-3"
4'-11
9'-3"
7'-9"
8'-6"
4
C8 C9
C7 1'-6" 4'-6"
5'
5'-3" 5'-41
2"
5
1'-9"
8'-1"
6' 7'
C12 C13 2'-6"
6 2'-3"
2'
1'-6"
3'-9"
5'
4'
2'-6"
7'-9"
6'-6"
8'-6"
5'-3"
7
4'
4'
3" 2'-6"
LAYOUT OF FOOTINGS
1) FOUNDING LEVEL = 10'-0" BELOW NATURAL GROUND LEVEL (NGL)
2) ALL FOOTINGS ARE PLACED SUCH THAT THE CENTER OF FOOTING MATCHES WITH THE
COLUMN CENTER UNO
ABHYYUDAYA
STRUCTURAL CONSULTANTS
ST-LK77-FD-02 A2 R0
SEC 3-3
SEC 3-3
1
C1
C2
3 3 SEC 2-2
2
3 3
Y10-8"C/C.
SEC 2-2
SEC 2-2
2 2 AT MID SPAN
17'
2 2
SEC 3-3
SEC 3-3
2 GRADE SLAB
3 C3 3 5" THK. C4
11'-6"
3 3
SEC 3-3
3 3
3 SEC 3-3
3 C5 3
C6
SEC4-4 SEC 2-2
2 2 SEC 2-2
SEC6-6
15'-2"
2 2
6 6
4 7 7
SEC2-2
4 4 C8 C9
C7
4'-3"
SEC7-7
5 2
SEC2-2
8 2 1 C10 C11 1
8 4'
4'-4"
3 3 C12 C13
6
5
SEC7-7
2
5 2
SEC 3-3
4'
C14 C16
SEC 2-2 7
7 4 4 7
3" 2'-6"
2 5
2
ST-LK77-FD-03 A2 R0
4"
SCHEDULE OF FOOTING
FOOTING
FOOTING SIZE FOOTING DEPTH FOOTING REINFORCEMENT *
B
5'-3" 6'-6" 2'-6"
Y
F2 BOT-Y12@4"c/c BOT-Y12@4"c/c
4"
PLAN
F5 8'-6" 8'-9" 3'-0" BOT-Y12@4"c/c BOT-Y12@4"c/c TYPICAL FOOTING DETAIL
F6 9'-3" 10'-9" 3'-0" BOT-Y12@4"c/c BOT-Y12@4"c/c * REINF. AT BOTTOM TO BE PROVIDED
WHERE CANTILEVER LENGTH IS MORE.
BOT-Y16@4"c/c BOT-Y16@4"c/c
F7 10'-0" 10'-6" 3'-6" TOP-Y10@8"c/c TOP-Y10@8"c/c COL BARS
COL LINKS
SIDE FACE - Y10@8"c/c EGL±0'-0"
BOT-Y12@4"c/c BOT-Y12@4"c/c
CF1 8'-1" 8'-6" 1'-6"
TOP-Y10@6"c/c TOP-Y10@6"c/c
10'-0"
WATER GRADE
PROOFING SLAB
5''THK BASEMENT LVL
5"
LAYER
SIDE FACE REFN. #1553, 5th Block Sir M Vishweshwaraiah Layout Bengalure-560056
Email: abhyudayastr@gmail.com
P.C.C.1:4:8.
SECTION A-A
ST-LK77-FD-04 A3 R0
Y10-8"
TYP. DISTRIBUTION TYP. DISTRIBUTION TYP. DISTRIBUTION
WATER Y10-10" REINF. Y8-8" REINF. Y8-8" REINF. Y8-8"
PROOFING Y10-10" Y10-10"
TYP. DISTRIBUTION
LAYER
9'
9'
9'
9'
REINF. Y8-8" Y10-10" WATER WATER WATER
PROOFING PROOFING PROOFING
LAYER LAYER LAYER
Y10-8" Y10-8" Y10-8"
10'
PROOFING
3'
3'
3'
3'
LAYER GRADE SLAB
BASEMENT LVL BASEMENT LVL Y10-8"C/C BASEMENT LVL Y10-8"C/C BASEMENT LVL Y10-8"C/C
6"
5"
6"
10"
COLUMN
FOOTING
FOOTING
REQUIREMENTS
DEPTH
4' WELL
FOOTING
DISTRIBUTION
AS PER LIFT
(MIN 5'-0")
WELL
DEPTH
PCC COLUMN COMPACTED
VENDOR
4"
PCC
4"
Y10-6" PCC
Y10-6"
SECTION 3-3
4"
4"
Y12-4"
Y12-4"
SECTION 1-1
NGL
NGL 6" NGL NGL
Y10-4"
TYP. DISTRIBUTION
TYP. DISTRIBUTION TYP. DISTRIBUTION TYP. DISTRIBUTION Y10-10" REINF. Y8-8"
Y10-10" REINF. Y8-8" REINF. Y8-8" REINF. Y8-8"
Y10-10" Y10-10" WATER
9'
9'
9'
WATER WATER WATER PROOFING
PROOFING PROOFING PROOFING LAYER
LAYER LAYER LAYER Y10-8" Y10-8"
Y10-8"
Y10-5"
Y10-5" Y10-8" Y10-8"
3'
3'
3'
3'
10"
10"
Y10-5" 6'
4' WELL PCC
WELL PCC COMPACTED
COMPACTED WELL WELL EARTH
EARTH COMPACTED Y10-5" COMPACTED
EARTH EARTH
ABHYYUDAYA
STRUCTURAL CONSULTANTS
SECTION 8-8
Email: abhyudayastr@gmail.com
Mobile:+91-9036430036
FOOTING
SECTION 5-5
DEPTH
COLUMN COLUMN
FOOTING
DEPTH
PCC
4"
PCC
ST-LK77-FD-05 A2 RO
LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@6"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C
THIRD TO M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500
FOURTH
FLOOR LEVEL
Y12 Y16 Y12 Y12
Y16 Y20 Y16 Y16 Y12 Y12 Y12
LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@6"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C
SECOND TO
M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500
THIRD FLOOR
LEVEL
Y12 Y16 Y12
Y16 Y20 Y16 Y20 Y12 Y12 Y12
LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@6"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C
FIRST TO
SECOND M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500
FLOOR LEVEL
Y12 Y16 Y12
Y16 Y20 Y16 Y25 Y12 Y16 Y12
GROUND TO LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@6"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C
FIRST FLOOR M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500
LEVEL
ABHYYUDAYA
STRUCTURAL CONSULTANTS
FOOTING TO LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C LINKS : Y8@6"C/C LINKS : Y8@8"C/C LINKS : Y8@8"C/C
Email: abhyudayastr@gmail.com
Mobile:+91-9036430036
GROUND
FLOOR LEVEL M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500 M25:Fe500
SLAB 6"
3'
1
PTB(2'-0"X1'-6")
12'-6"
B10(1'-0"X1'-6")
B13(1'-0"X1'-6")
B10(1'-0"X1'-6")
SLAB 7"
17'
SLAB 6"
PTB(2'-0"X1'-8")
2
B9(1'-0"X1'-6")
B12(1'-0"X1'-6")
B9(1'-0"X1'-6")
11'-6"
SLAB 6"
PTB(2'-0"X1'-8")
3
B11(1'-0"X1'-6")
B8(1'-0"X1'-6")
B8(1'-0"X1'-6")
14'-5"
SLAB 6"
SLAB 6"
PTB(2'-0"X1'-6") PTB(2'-0"X1'-6")
4
4'-10"
B14(0'-8"X1'-6")
5'
SLAB 6"
B15(0'-6"X1'-6") B16(0'-6"X1'-6")
B17(0'-6"X1'-6")
B1(0'-6"X1'-6")
5 B2(0'-8"X1'-6") B4(0'-8"X1'-6")
4'-4"
B3(0'-8"X1'-6") INV
SLAB 6"
6 SLAB 6"
Up.
B5(0'-6"X1'-6") B6(0'-6"X1'-6")
4'
B7(0'-8"X1'-6")
7 SLAB 6"
3" 2'-6"
RAMP
8 UP UP
ABHYYUDAYA
STRUCTURAL CONSULTANTS
ST-LK77-FF-01 A2 R0
2
2'-6" 15' 5'-9" 5' 5'-6" 3'-9" 2'-6"
Y10-6"-(Top) Y8-8"(Bottom)
3'
2'-6"
2'-6"
2
5'-3" 3'-9"
1 1
1 1
Y8-6"
Y8-7"
Y8-6"
2'-6" 1'-6" 2'-6"
1'-6"
17'
Y8-4" Y8-8"
Y8-4"
4'-3"
1'-6"
1'-6"
Y10-6"-(Top) Y8-8"(Bottom)
Y10-6"-(Top) Y8-8"(Bottom)
2
1'-3"
1'-3"
3'
Y8-8"
Y8-8"
Y8-6" Y8-6"
2'-6"
11'-6"
1'-3"
3'
6" 1'-6"
3
Y10-6"
1'-6"
1'-6"
3'-9"
6"
Y8-7"
Y8-8"
Y8-4" Y8-6"
SECTION 1-1
GROUND FLOOR LVL
3'-9"
3'-9"
3'-9"
2'-6"
1'-6"
6" 1'-6"
Y10-6"
4
6"
Y8-6" Y8-8"
5 SECTION 2-2
3
4'-4"
Y10-4"
(T&B)
2'
Y8-6"
(T&B)
6 Y10-4"
Y10-4"
(T&B) Y8-6"
4'
(T&B)
Y8-8"
(T&B)
7 Y10-4"
3" 2'-6"
8
RAMP SECTION 3-3
UP UP
ABHYYUDAYA
STRUCTURAL CONSULTANTS
R C DETAILS OF SLABS AT GROUND FLOOR LEVEL #1553, 5th Block Sir M Vishweshwaraiah Layout Bengalure-560056
Email: abhyudayastr@gmail.com
Mobile:+91-9036430036
NOTE:
1) ONLY SLAB MAIN REINFORCEMENT IS INDICATED FOR CLARITY. DISTRIBUTION STEEL WHEREVER NECESSARY SHALL BE Y8-8" C/C
2) SLABS, BEAMS ETC ARE NOT DESIGNED FOR CONSTRUCTION LOADS AND HENCE CARE TO BE TAKEN DURING CONSTRUCTION TO ENSURE
THAT THE ALLOWABLE STRESS LIMITS (AND DESIGN LOADS) ARE NOT EXCEEDED.
3) AVERAGE THICKNESS OF THE FINISHES NOT TO BE EXCEED 3 INCHES.
4) IF IN DOUBTS PLEASE CLARIFY BEFORE CONSTRUCTION.
ST-LK77-FF-02 A2 R0
Ld (typ) 2-Y16
2L-Y8-6"
2-Y16 2-Y16 2-Y16 2-Y16
2L-Y8-6" 2L-Y8-6" B3(0'-8" X1'-6") INV 2L-Y8-4" 2L-Y8-6" 2L-Y8-8"
B1(0'-6" X1'-6") B2(0'-8" X1'-6") B4(0'-8" X1'-6") B5(0'-6" X1'-6") B6(0'-6" X1'-6")
2-Y16
B7(0'-8" X1'-6")
ABHYYUDAYA
STRUCTURAL CONSULTANTS
ST-LK77-FF-03 A3 R0