Professional Documents
Culture Documents
PBL 4
PBL 4
and Technology
NUST INSTITUTE OF CIVIL
ENGINEERING
PBL ACTIVITY-4
Narrative 2: After your evaluation, you have identified a design problem in the main
canal that is causing flow restrictions. The problem is caused by a constriction in the
canal that is reducing the flow rate. You propose to increase the size of the canal to
improve flow.
Response Required # 2: (10 mins)
Calculate the new flow rate and velocity in the main canal after increasing its size.
Analyze the flow characteristics of the branch and distributary canals with the increased
flow rate. Identify any potential problems and propose solutions. Assume reasonably the
missing values. (10 points)
Narrative 3: You have proposed a solution to the design problem in the main canal, and
the construction is complete. However, after the construction, you have noticed that the
branch canals are still experiencing flow restrictions.