You are on page 1of 6
(GULF ASIA CONTRACTING COMPANY A [NORTH FIELD EAST PROJECT (NFE EPC1 PROJECT) "WELDING PROCEDURE SPECIFICATION (WPS) (Gompan Gaara Clank eTav, {INFET-CTJV-GM-PRC-00010, NFE1.CTIV-ON-PRC-00024, 60-00-P-SPC-00014 \yons(aw-403) Backing [Backing Maier Loin Oesen. Groove Filet, “Fore RESETS Reforto Sketches in Page No 58 “BIM-Base Meta WW Meta [BASE METALS(aw-409) thickness Range ase tet laace Pipe Dis Range: (Apolcable Line iiss CICTIW eontirma thet WPSIPOR i prope ‘SDR: NFE-CTAV-Gnk-SDR-00056 Rev. [FILER meTAL{aw404) L [Sees Nes. [AWS No Cass) Bi fines 88 iow GULF ASIA CONTRACTING COMPANY 5 deat [NORTH FIELD EAST PROJECT (NFE EPC’ PROJECT) ae ‘WELDING PROCEDURE SPECIFICATION (WPS) ei lposmrions(aw- 405) [POSTWELD HEAT TREATMENTIaW. 407) Postion) of Groove: ALL [Temperature Range. 583°C 625 [ELECTRICAL CHARACTERISTICS(GW 409) We | process Fier Ma Core lor ange|tave sped] Hest Put Lays) B= Joes own] Dee ] Ame. | | Range | (eulmm Nae Pelor_| ange some nox _| craw | esas [enross|rseozd ose | ee-16 | or-12 | roo-1e0| 14 vot_| craw | esse [enross| 2024 | oose | ros-103| 10.1 | rss-24| 087 rusceol craw | esns [enmss| 24 | vose | 0-156] 00-14 Lize-218| om ECHMIGUETGW = 470] [sung ox Weave Bead Beton and Stig conic bea Wik tan Multec Sle Par(eerede) Peering ie os ane | Mahesh Senhianan Gs, Poston | Weng aR OWES Yanosee babi Sion eo QC-03 Date | 1S Nova 160 Idyov i [_wrseTescwwsrcsureas T WELD JOINT DETAILS - [aW-402], CT FL geet 6a Sm Tabieot ai Beto es term Tia Fost Sp ie To- Nominal Thickness of branch “Th- Nominal Ticks of Header [Nominal Tikness of fren pad or sade {Lesser of 0.778 orn A Lessor fT, ‘SOCKET WELD (Minimum two Passes) 1.6m Min, Sen an Fret ana socket wads shuld have a miu of wo weld passes. Allwolng ate shalhave a mien 2 pesees Nte:1) Roo dfs (ie bein pentton ack ot on, ekasve pene ean oped were acess pots rrr wo pases. Review Details: Document recied wth Traertal IN: NEE Recap Date 2072-1101 ‘The Bocument Review has ben nit on: 202-1-01 Revaw Tene Fama 6 a6) {.cTw.26-29882 I applicable as per Approver return code, comments are avalable ether after this page andlor as extemal attached comments below. Number of anata) 0 This page is automatically generated from PIMS and shall be considered as official answer from COMPANY. Onshore LNG Facilities of the NORTH FIELD EAST PROJECT COMPANY Contract No: LTC/CINFEII945/18, ‘CONTRACTOR Project No. 3045.18 .0,/ SUBCONTRACT No, NFEOSADOS FACILITY [QATARGAS OPERATING COMPANY LIMITED EQUIPMENT NAME unumes (C00 aa ma Ce | VENDOR NAME GULF ASIA CONTRACTING W.LL DOCUMENT CLASS 2 pocumENT TTTLE WELDING PROCEDURE SPECIFICATIONFOR (GAC.WPs-P-cSILTC-003) PROJECT DOCUMENT No. NFE1-GAC-OM.WPS.00008 RETURNED VENDOR DOCUMENT No. NFE1-GAC-PSM00S-oM.WPS.00008 oF we | roam | tad FarRevew ten |S Snmaten | VGN Tx | ioas2072 | ansFerinenalReden | wateane | 5. Setihatan | Sibananin ‘amt | eesronmowacreven | PrmodTotsi | § Seraten | Sapuan piscinuinecneck | 2-BSe/ "RETURNTO VENDOR Reeve By | ARR w Ne Come = ao Reviewed with Comments 8 Noted o (©=Do Not Proceed with Fabrication o Received ae Information Justin Senora” Thiraviam fsa oror a Ta ECE TTPO

You might also like