Onshore LNG Facilities

of the
NORTH FIELD EAST PROJECT
COMPANY Contract No.: LTC/C/NFE/3945/18 CONTRACTOR Project No.: 3945_18

P.O. / SUBCONTRACT No. : NFE0SA005 RETURNED

24 Nov 2022
FACILITY : QATARGAS OPERATING COMPANY LIMITED CTJV
VPC

EQUIPMENT NAME : UTILITIES

TAG No. : NA

VENDOR NAME : GULF ASIA CONTRACTING W.L. L

DOCUMENT CLASS : 2

WELDING PROCEDURE SPECIFICATION FOR


DOCUMENT TITLE :
STRUCTURAL STEEL (GAC-WPS-S-006)
RCV'D
PROJECT DOCUMENT No. : NFE1-GAC-QM-WPS-00037 Nov 20,2022
CTJV
VPC
VENDOR DOCUMENT No. : NFE1-GAC-PSM005-QM-WPS-00037

0 16-11-2022 Approved for Construction Mahesh.MP S. Senthilnathan V.G Nair


B 06-11-2022 Issued for Review Mahesh.MP S. Senthilnathan V.G Nair
A 21-09-2022 Issued for Internal Review Mahesh.MP S. Senthilnathan Subramanian
PURPOSE/ DESCRIPTION OF PREPARED REVIEWED
REV. DATE BY BY
APPROVED BY
REVISION
PROJECT DOCUMENTS ARE CONTROLLED DOCUMENTS. REVISIONS ARE DENOTED ∆ IN THE RIGHT-HAND MARGIN OF EACH PAGE.

DISCIPLINE CHECK RETURN TO VENDOR Reviewed By


Gregoire Sautet
Lead / Package Eng _________
A – Reviewed with No Comment ________________
2022.11.24
11:15:15 +03'00'

QA Department _______________ B – Reviewed with Comments as Noted ________________

Other ____________________ C – Do Not Proceed with Fabrication ________________


____________________
D – Received as Information ________________

Digitally signed by
Justin Justin Thiraviam

Thiraviam Date: 2022.11.22


06:57:21 +03'00'

Operation Center Document No. NFE1-GAC-QM-WPS-00037


Date: 16-Nov-2022 WELDING PROCEDURE SPECIFICATION FOR NFE1-GAC-QM-WPS-00037
STRUCTURAL STEEL (GAC-WPS-S-006)
Rev: 0 Page 2 of 39

CONTENTS

Sl No. Description Page No.

1 WPS..................................................................................................................... 03 of 39

2 Attachments …………………………………………………………………………… 06 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

GULF ASIA CONTRACTING COMPANY

NORTH FIELD EAST PROJECT (NFE EPC1 PROJECT)


WELDING PROCEDURE SPECIFICATION (WPS)

Company: Qatar Gas Client: CTJV Manufacturer: Gulf Asia Contracting Company
Welding Procedure Specification No: GAC-WPS-S-006 Revision No : 0 Date: 16-Nov-2022
Supporting PQR No.(s): P-CS(36-275)-SM-A-1/ P-CS(36-275)-SM-A-2/ P-CS(36-275)-SM-A3
Welding Process(es) : SMAW Type: Manual
Codes & Standards Applicable : AWS D1.1/D1.1M: 2020
Project Specification : 60-43-ST-SPC-00001, NFE1-CTJV-QM-PRC-00024

JOINT JOINT SKETCH


Joint Design : CJP & FILLET
Backing : Yes
Back weld :Yes for CJP & Fillets Refer to Sketches in Page
Backing Materials :Base Metal& Weld Metal
Joint Designation : Complete joint penetration (CJP)
& Fillet welds
BASE METALS POSTWELD HEAT TREATMENT
Group No : - Temperature :N/A
Type or Grade :ASTM A36 Holding Time :N/A
to BSEN 10025 S275 JR Rate of Heating :N/A
Thickness Range :3.0 mm - 40 mm Rate of Cooling :N/A
Pipe Diameter Range :N/A ELECTRICAL CHARECTERISTICS
FILLER METAL Current (AC/DC) :DC
F No :4 Polarity(Electrode) :RP(SMAW)
AWS Specification No :5.1 Amperes :See below table
AWS Classification No :E 7018-1 H4R Electrode(size & type) :Ø 2.4,3.2 & 4.0 mm
Size Electrodes / Filler :2.5 /3.2 /4.0 mm Volts (Range) :as below table
Consumables Insert :N/A
Brand Electrodes :ESAB(OK55) GAS
Others :N/A Shielding Gas (es) :N/A
POSITION Percent Composition :N/A
Position of Groove :Flat,Horizontal,Vertical & Overhead Mixture :N/A
Welding Progression :Uphill Flowrate :N/A
Fillet :Flat,Horizontal,Vertical & Overhead TECHNIQUE
String or weave Bead :String & Weave
Bead width(max) :< 3x electrode dia
Initial and Interpass Cleaning
PRE-HEAT (brushing,grinding, etc) :Brushing & Grinding
Preheat Temperature Min : 3mm to 38mm - 100C min Method of Back Gouging :N/A
: 38mm to 40mm - 65ºC Oscillation :N/A
Interpass temperature Max :Min N/A , Max 248ºC Multiple or Single Pass (per side) :Multiple
Others :N/A Multiple or Single Electrodes :Single
Travel Speed (Range) :as below table
Peening :N/A
HF Unit :N/A
PARAMETER TABLE
Filler Metal Current Volt
Weld
Process Range
Layer(s) Type Amp . Travel Speed Range
Brand Class Dia(mm) (V)
Polarity Range (mm/sec)
Root&Hot SMAW ESAB E 7018-1 H4R 2.5/3.2 DCRP 67-94 20-26 0.83-1.34

Fill SMAW ESAB E 7018-1 H4R 2.5/3.2/4.0 DCRP 105-125 20-24 1.005-2.71

Cap SMAW ESAB E 7018-1 H4R 2.5/3.2 DCRP 64-125 21-24 1.04-2.11

Back Weld SMAW ESAB E 7018-1 H4R 2.5 DCRP 84-116 21-23 1.17-2.15

Prepared By GAC Reviewed By GAC Approved By CTJV QATAR GAS


Name Mahesh.MP S.Senthilnathan Justin
Position Welding Engineer QA/QC Manager Welding engineer
Sign Justin Digitally signed by
Justin Thiraviam

Date 16-Nov-2022 16-Nov-2022 Thiraviam Date: 2022.11.22


06:57:01 +03'00'

Page 3 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 4 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 5 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 6 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 7 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 8 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 9 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 10 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 11 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 12 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 13 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 14 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 15 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 16 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 17 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 18 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 19 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 20 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 21 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 22 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 23 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 24 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 25 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 26 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 27 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 28 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 29 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 30 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 31 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 32 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 33 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 34 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 35 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 36 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 37 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 38 of 39
Doc.No.:NFE1-GAC-QM-WPS-00037_Rev.0

Page 39 of 39