You are on page 1of 4
‘St George's House Knoll Road Camberley Surrey GUIS 38Y United Kingdom Tels +44 (0)1276 6 88800 Fax: +44 (0)1276 63334 Update of Resource Assessment Report on Reservoir 2, Barra Field in the BM-SEAL-11 Concession, Offshore Brazil For BPRL Ventures BV Effective Date: 25 July 2022 Rev. Date Description Bi cra [ond | Appa 0 | FSeptember final TDIGM 1D ‘GPE 1 [19% Sepiember 2 final IDIGM, 1D GPE. 2] 20 September 2 final IDIGM 1D GPE Revision 2 Page 1 of 74 A. Quality Assurance Verification Table Iniiats Name Signature om Gregory Mwvenketishi —z__ » Ivan Djokie oho Te ‘ GPE Geoff Eyre roe Revision 2 Page 2 of 74 Resource Assessment Update Report, Rev 2, 20th September 2022 Signature Page Final Audit Report 2022-09-21 crated 2022-00-21 Be Greg Muerkeishi(gegory.mvenketishi@bayphase.com) Stats: Sioned Transection ID: CBJCHECAABAAXIXVETwktONZugGBWooxtSNVESIIU "Resource Assessment Update Report, Rev 2, 20th September 2022_Signature Page" History 8) Document created by Greg Mwenketishi (gregory mwenketishi@bayphase.com) 2022.09-21 9:45:53 AM GMT Document e-signed by Greg Mwenketishi (gregory. mwenketishi@bayphase.com) ‘Signature Date: 2922.09-21 - 46:49 AM GAIT - Time Soures saver Document emailed to Ivan Djokic (ivan djokic@bayphase.com) for signature 2022-08-21-9:46'51 AM GMT Email viewed by Ivan Djokic (van djokic@bayphase.com) 2022.08-21 948.32 AM GMT Document o-signed by Ivan Djokic (ivan.djokic@bayphase.com) Signature Date: 2022-00-21 9:49:47 AM GNIT- Tie Source: saver Document emailed to tom tom (thomas eyre@bayphase.com) for signature 2022.09-21 - 8:48:48 AM GMT Email viewed by tom tom (thomas eyre@bayphase.com) 2072.09-21-'56:36 AM GMT Document e-signed by tom tom (thomas eyre@bayphase.com) ‘Signature Date: 2022-09-21 - 54:48 AM GAT - Tine Source: saver Document emailed to Geoff Eyre (geoff.eyre@bayphase.com) for signature 2022-00-21 - 9:58:45 AM GMT Email viewed by Geoit Eyre (geotf.eyre@bayphase.com) 2022-00-21 -0:5625 AM GMT Adobe Acrobat Sign Document e-signed by Geoff Eyre (geoft.eyre@bayphase.com) ‘Signature Date: 2022-08-21 -:56:31 AM GMT - Timo Source: corver © Agreement completed. 2022-09-21 -9156:31 AM GMT

You might also like