Anjum Villas Planning v1.0
Anjum Villas Planning v1.0
Complex Details:
Complex Name: Anjum Villas
Complex Address: 1 Dahlia Str. Zinniaville, Rustenburg, 0300
Coordinates: -25.6506388, 27.2421140
BC Name: Baboo Bodiat
BC contact: 083 786 1261
Quick Scope:
Unit Count: 24
Fibre Requirements: 4F, 12F, 24F
Version 1.0
Locality 24x2F Retracta-
net
12x2F Retracta-
net
72F Micro-Fibre
24F Micro-Fibre
48F Micro-Fibre
96F Micro-Fibre
144F Micro-Fibre
12F HDD-Fibre
24F HDD-Fibre
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Feeder Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) Route (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name:
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage Anjum Villas
24x2F Retracta-
Topographical Map net
12x2F Retracta-
net
72F Micro-Fibre
24F Micro-Fibre
1 13 19
7
48F Micro-Fibre
2 14 20
8 72F Micro-Fibre
15
3 9 21 96F Micro-Fibre
16 22 144F Micro-Fibre
4 10
17 12F HDD-Fibre
5 11 23
24F HDD-Fibre
18
6 12 24
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name:
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage Anjum Villas
Site Plan 2:
Proposed Evotel Route 24x2F Retracta-
net
12x2F Retracta-
net
feed 2 units
24F Micro-Fibre
1 13 19
7
12 DC03-12F
3 9
8 48F Micro-Fibre
2 14 20 Fiber to be
8
pinned inside 72F Micro-Fibre
conduit on wall
15
3 9 21
96F Micro-Fibre
2 6 7 11 DC02-24F
16 22
4 10 144F Micro-Fibre
DC01-12F
17 12F HDD-Fibre
5 11 23
5 NDP with 32-
1 4 10 Way Splitter 24F HDD-Fibre
18
6 12 24
48F HDD-Fibre
Trench & lay 4F
BB for sweep
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name:
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage Anjum Villas
Site Plan 1:
Existing 24x2F Retracta-
net
12x2F Retracta-
net
12F Micro-Fibre
Each CTP to
feed 2 units
24F Micro-Fibre
1 13 19
7
12 DC03-12F
3 9
8 48F Micro-Fibre
2 14 20 Fiber to be
8
pinned inside 72F Micro-Fibre
conduit on wall
15
3 9 21
96F Micro-Fibre
2 6 7 11 DC02-24F
16 22 144F Micro-Fibre
4 10
DC01-12F
17 12F HDD-Fibre
5 11 23
5 NDP with 32-
1 4 10 Way Splitter 24F HDD-Fibre
18
6 12 24
48F HDD-Fibre
Trench & lay 4F
BB for sweep
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name:
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage Anjum Villas
Photos
24x2F Retracta-
net
12x2F Retracta-
net
12F Micro-Fibre
24F Micro-Fibre
48F Micro-Fibre
72F Micro-Fibre
96F Micro-Fibre
144F Micro-Fibre
12F HDD-Fibre
24F HDD-Fibre
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line Project Name:
End of Run Slack Storage (Up to 96F) 900mm Deep
Anjum Villas
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage
Splice Plan 24x2F Retracta-
net
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm)
4 Port Tap-in-Box (Up to 24F) (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name:
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage Anjum Villas
Address: Unit 5 - Gallagher Place
South54 Richards Drive
Halfway House
Midrand
1685
I ,__________________________ the representative of ____________________________ Estate/Complex, have read through the proposed plans
provided by Evotel for the roll out of Evotel’s Fibre infrastructure within the above mentioned Estate/Complex.
I understand the proposed route/s provided by Evotel in order to provision Fibre to all units of the Estate/Complex. I acknowledge that there may be
variants/changes to the proposed plans once build has started. However this will be communicated/relayed to myself before any changes have been
made. I have informed all tenants as well as all other relative parties effected by the installation eg. Board of trustees & Investors of the installation and
all parties are in agreement for the commencement of Evotels Fibre Optic Network to be installed within the above mentioned Estate/Complex.