2 West End Street Planning
2 West End Street Planning
Complex Details:
Complex Name: 2 West End Street
Complex Address: 2 West End Street, Posmasburg, 8420
Coordinates: -28.3226510, 23.0692900
BC Name: Pieter
BC contact: 083 700 6288
Quick Scope:
Unit Count: 22
Fibre Requirements: 4F, 12F
Version 1.0
Locality 24x2F Retracta-
net
12x2F Retracta-
net
72F Micro-Fibre
24F Micro-Fibre
48F Micro-Fibre
72F Micro-Fibre
-28.3226510, 23.0692900
96F Micro-Fibre
144F Micro-Fibre
12F HDD-Fibre
24F HDD-Fibre
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Feeder Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box Route (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name: 2
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage West End Street
24x2F Retracta-
Topographical Map net
12x2F Retracta-
net
72F Micro-Fibre
24F Micro-Fibre
6
48F Micro-Fibre
7 5
72F Micro-Fibre
15 8 4
14 3 96F Micro-Fibre
16
9
17 144F Micro-Fibre
22 13 10
18 12 2
21 12F HDD-Fibre
20 19 11 1
24F HDD-Fibre
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name: 2
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage West End Street
Site Plan 2:
Proposed Evotel Route 24x2F Retracta-
net
12x2F Retracta-
net
6 14 DC03-12F
48F Micro-Fibre
7 5 Fiber to be
pinned inside 72F Micro-Fibre
3 conduit on wall
15 8 4 13
2
14 3 96F Micro-Fibre
16 DC02-12F
11 9
10 17
13 4 10
144F Micro-Fibre
22 9 1 DC01-12F
8 18 12 2
21 7 12F HDD-Fibre
BB
Trench & lay 4F 48F HDD-Fibre
for sweep
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name: 2
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage West End Street
Site Plan 1:
Existing 24x2F Retracta-
net
12x2F Retracta-
net
12F Micro-Fibre
Each CTP to
feed 1-2 units
24F Micro-Fibre
6 14 DC03-12F
48F Micro-Fibre
7 5 Fiber to be
pinned inside 72F Micro-Fibre
3 conduit on wall
15 8 4 13
2
14 3 96F Micro-Fibre
16 DC02-12F
11 9
10 17
13 4 10
144F Micro-Fibre
22 9 1 DC01-12F
8 18 12 2
21 7 12F HDD-Fibre
BB
48F HDD-Fibre
Trench & lay 4F
for sweep
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm) (450mm Deep)
New 4 Port Tap-in-Box (Up to 8F) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name: 2
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage West End Street
Photos
24x2F Retracta-
net
12x2F Retracta-
net
12F Micro-Fibre
24F Micro-Fibre
48F Micro-Fibre
72F Micro-Fibre
96F Micro-Fibre
144F Micro-Fibre
12F HDD-Fibre
24F HDD-Fibre
48F HDD-Fibre
72F HDD-Fibre
96F HDD-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line 900mm Deep Project Name: 2
End of Run Slack Storage (Up to 96F)
West End Street
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage
Splice Plan 24x2F Retracta-
net
12x2F Retracta-
net
2 West End Street Splice Diagram
Splitter No. 1:32-Way Splitter Fiber Spliced Cable Label Unit Complex
12F Micro-Fibre
1:32 Splitter 1 F1 T1F1 DC01-12F 1 2 West End Str
F2 T1F2 DC01-12F 2 2 West End Str
24F Micro-Fibre
F3 T1F3 DC01-12F 3 2 West End Str
F4 T1F4 DC01-12F 4 2 West End Str
F5 T1F5 DC01-12F 5 2 West End Str 48F Micro-Fibre
Existing Estate Manhole Boundary Wall Box New Trench Line Road Cut
Evotel Manhole (900mm x 900mm)
New 4 Port Tap-in-Box (Up to 8F) (450mm Deep) (900mm Deep)
Access Box/Point Distribution Box New Trench Line Road Drill (2x 110mm)
Evotel Handhole (600mm x 600mm) (Up to 24F)
4 Port Tap-in-Box (900mm Deep) 450mm Deep
Access Box/Point Distribution Box Road Drill (2x 110mm)
Existing Estate Manhole Existing Line
End of Run Slack Storage (Up to 96F) 900mm Deep Project Name: 2
Existing Estate Manhole
New Dome Joint
Boundary Wall Box
(Up to 2F)
Distribution Box
(Up to 120F)
Road Cut
(450mm Deep) X Blockage West End Street
Address: Unit 5 - Gallagher Place
South54 Richards Drive
Halfway House
Midrand
1685
I ,__________________________ the representative of ____________________________ Estate/Complex, have read through the proposed plans
provided by Evotel for the roll out of Evotel’s Fibre infrastructure within the above mentioned Estate/Complex.
I understand the proposed route/s provided by Evotel in order to provision Fibre to all units of the Estate/Complex. I acknow ledge that there may be
variants/changes to the proposed plans once build has started. However this will be communicated/relayed to myself before any changes have been
made. I have informed all tenants as well as all other relative parties effected by the installation eg. Board of trustees & Investors of the installation and
all parties are in agreement for the commencement of Evotels Fibre Optic Network to be installed within the above mentioned E state/Complex.