You are on page 1of 2

Statement Of Chittagong PBS-2- Raozan.

Energy Consumption For the Month of -February 2024


PBS-2, Raozan, Chittagong.
A. Energy Imported from BPDB

KWH Reading KVARH Reading PFC Surcharge (Tk) PFC Range Remark
s
Total
Sl. Location of Voltage Line Total Energy Import Total Import Energy Charge in
Name of the Feeder Meter No. Present Previous Diff KWh Present Previous Diff Kvarh PF weight factor Bus loss Tarrif Charge in
No Meter level Loss (Kwh) (Kvarh) tk
reading reading reading reading Tk
0.90-0.88 0.88-0.80 0.80-0.75
01/03/24 At 01/02/24 At 01/03/24 01/02/24
00.00 hr 00.00 hr At 00.00 hr At 00.00 hr

1 2 3 4 5 6 7 8 9 10 11 12 16 17 18 19 20 21 22 23 24 25 26 27
Raozan PBS Line loss
1 Raozan PBS S/S 208176590 33kv 9555.20600 9555.20600 0.00000 2786.52700 2786.52700 0.00000 0.00000 12000 0 0 6.2325 0 0
S/S by XEN,
Fatikchari PBS Feeder Hathazari
2 50499791 33kv 12978.78220 12978.78220 0.00000 4947.75050 4947.75050 0.00000 0.00000 36000 0 0 6.2325 0 0 EAU-3,
new meter 33/11Kv S/S
Chandraghon
3 Rangunia PBS Feeder 50499750 33KV 11409.74200 11353.83640 55.90560 4356.08540 4341.67110 14.41430 0.96833 48000 0 2683469 691886 6.2325 16724719 16724719.3
a Grid S/S
Chandraghon
4 Kodala PBS feeder 50501206 33KV 11679.15210 11603.51870 75.63340 3644.65590 3625.87100 18.78490 0.97051 24000 0 1815202 450838 6.2325 11313244 11313244
a Grid S/S
Modunaghat- CUET Madunaghat
5 50500316 33KV 1721.16960 1685.19380 35.97580 307.78860 299.81600 7.97260 0.97631 24000 2083.76214748115 865503 191342 6.2325 5394247 5394247
Feeder Grid S/S
Ramgar
6 Ramgar PBS Feeder 208176587 11kv 1261.92900 1261.92900 0.00000 145.90000 145.90000 0.00000 0.00000 2050 0 0 6.2325 0
(Sonaipul)
7 REB Charia-01 Feeder Hathazari 50499047 33KV 2452.28100 2318.24700 134.03400 755.92900 731.02200 24.90700 0.98317 48000 0 6433632 1195536 6.2325 40097611
Grid S/S
8 REB Charia-02 Feeder 50499938 33KV 1701.84230 1571.61010 130.23220 474.05520 454.69660 19.35860 0.98913 48000 0 6251146 929213 6.2325 38960265
Chandraghon
9 33Kv Wasa Express 50499765 33KV 1898.99220 1774.93800 124.05420 403.49850 377.64660 25.85190 0.97897 24000 0 2977301 620446 6.2325 18556027
a Grid S/S
Chandraghon
10 Rangunia PBS feeder-2 50499322 33KV 559.62000 505.15000 54.47000 98.04500 95.85200 2.19300 0.99919 24000 0 1307280 52632 6.2325 8147623
a Grid S/S
Chandraghon
11 Kodala PBS feeder-2 50499321 33KV 961.19200 863.54000 97.65200 304.56600 277.92200 26.64400 0.96473 24000 0 2343648 639456 6.2325 14606786
a Grid S/S
400/230KV Modunaghat 400/230KV
12 50499320 33KV 1149.89400 913.90000 235.99400 320.80400 210.13100 110.67300 0.90538 82 19352 9075 6.2325 120608
Aux Modunaghat
24696531 4780424 Energy Charge 33432210
B. Energy exported to BPDB
1 11KV Thandachari Feeder Thandachari 21251479 11kv 4008.00000 4008.00000 0.00000 558 0 0.00000 6.2325 0.00000 0 0
2 11KV Baga bil Feeder Baga bil 21251367 11kv 8668.00000 8668.00000 0.00000 280 0 0.00000 6.2325 0.00000 0 0
3 Rangunia 33/11 kv ssr Ranguinia S/S 1062546 0.4kv 68954.00000 68954.00000 0.00000 10 0 0.00000 6.2325 0.00000 0
33kv incoming
feeder(Rangunia
4 Ranguinia S/S 43891737 33kv 0.75550 0.00000 0.75550 2.81170 0.00000 2.81170 0.25949 24000 18132 67480.80000 6.2325 113007.69000
33/11kv S/S water
intake)
5 Raozan p/s intake Raozan WP022826 33kv 16.22660 16.22660 0.00000 5.23000 5.23000 0.00000 0.00000 8000 0 0.00000 6.2325 0.00000 0
Total Energy Exported 18132 67481 113008

Page-1
C. Total Import and PF calculation of Noapara PBS-2 feeder
Energy Total
KVARH Reading Charge in PFC Surcharge (Tk) PFC Range Charge in Remarks
KWH Reading tk Tk
Sl. Location of Voltage Total Energy
Name of the Feeder Meter No. Present Previous Diff KWh Present Previous Diff Kvarh weight factor Total Import (Kvarh) PF Bus loss Tarrif
No Meter level Import (Kwh)
reading reading reading reading
0.90-0.88 0.88-0.80 0.80-0.75
01/03/24 At 01/02/24 At 01/03/24 01/02/24
00.00 hr 00.00 hr At 00.00 hr At 00.00 hr

1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24
1 RPCL Generation(Export) RPCL 216430330 33KV 4112.65780 4091.08011 21.57769 2601.20024 2587.60937 13.59087 180000 3883984 2446357

2 RPCL Aux. Com. Imp RPCL 216430330 33KV 8.36056 8.26754 0.09302 8.79683 8.69665 0.10018 180000 16744 18032
Noapara PBS Feeder Madunaghat
3 50500951 33KV 13101.82220 13009.64380 92.17840 4670.71520 4641.45740 29.25780 36000 3326431 1053281 8008.3034398420
import Grid S/S
4 33KV REB-Noapara exp Modunaghat 50500951 33KV 997.68340 981.34620 16.33720 2159.55920 2131.93880 27.62040 36000 588139 994334
5 Import to PBS-2 6605532 2487271 0.94 5.8925 38923098 38923098

Net Energy Imported by PBS-2 from PDB (A-B)+C= 31283931.37