You are on page 1of 1
PART 14 REFERENCES ACI (0006), Cae Reuiements for Nate Sofey Related Concrete Soren, ‘6, Ames Cone Ia Faint il Mh [ACT (208), Bldg Cade Reaves for Satara Conse, ACU SUC {MOR Aneran Concetta Fania ils MI F |ASSE (201). Safer Regiment for Sel retin, ANSUASSE. 10.1304 ‘Society af Safely Enns, Des Pies. Fisher IA (20) Isl Hiding fof 0 chr Rode, sion Ge SC, Chica Fisher, IM a Koi, A (2900), ase Pate ane Aneto Rat Desig, ol ‘Gite 1, AISC, Chit Fisher FM. West LA 197) ErciwBacing of Law Rite Sra Design Ge 10, AISC, Chea. Mani BEL_ and net, EG. 19850), “Anchrage of Set Building Comp ‘Concrete. Engnering Jornal, N.S, No.4 th Quan, pp. 3-39, AISE Mari .L and Bute £.6,1985b),°Maipl Bol Andes Method fa ing he Eee Proje Ara Overlap Stes Cone,” Eiwerng J TE. No, 4th arr p. 2982, ASC, Chie pos EP ant Sten, RM (197), "Cape of Cans with Spice pe TPnineing na, Ho Ist uate p. 16-23, ASC Chie, Ricker, D1 (1980) "Some Practical Aspects of Cola Base Selection “na. 26, No. Or, ATSC, Chiao, IL q “Tomtom, WA. (198), "Doign of Sal Base Ps for Wien "ine loyal a 27, No ,3 Outer pp. 108-110 AISC, Chi “Trion, WA L940), “Design of Shall Base Plates for Wike-Fan ‘Concern of Metis” Egheerig Journal, ol 27, No.4, hi ett ASC. Chie I MSC (ert Edison Table 14-1 Finish Allowances weenie | Ose Table 14-2 Recommended Maximum Sizes for chor-Rod Holes in Base P|

You might also like