(1) SAFETY
1.1 Check the Converter Kit and clear
from (E.g: Sticker, Wrapper, Plastic or check_box Pass check_box_outline_blank Fail
Boxes)
1.2 Need to using proper tool when
drilling and ensure the surrounding area check_box Pass check_box_outline_blank Fail
safe (E.g: Vacuum, hand drill)
1.3 Remove any sharpen things inside
the toolbox before entering the factory check_box Done check_box_outline_blank Fail
1.4 Wipe the toolbox by using IPA and
make sure its clean from any particle, check_box Done check_box_outline_blank IPA not provided
dust and sticker
1.5 Trolley must be wipe by using IPA
and the wheel need to wrap before
check_box Done check_box_outline_blank IPA not provided
entering the production check_box_outline_blank Wrapper not provided
1.6 LOTO must be display during
working time and barricade work area check_box Done check_box_outline_blank Not provided
1.7 Buddy system when using the
ladder must be practiced and follow the check_box Complied check_box_outline_blank Uncomply
SOP
1.8 Converter kit must be proper
grounded and no power leakage check_box Yes check_box_outline_blank Power Leakage check_box_outline_blank Not Grounded
https://eservice-app.bio-energy.com.my/admin/report/show/136 1/5
6/25/2021 eService | Report
https://eservice-app.bio-energy.com.my/admin/report/show/136 2/5
6/25/2021 eService | Report
(7) Documentation
7.1 System Design Documentation and
User Manual: check_box Passed check_box_outline_blank Failed
7.2 System Design Documentation must
include sensor routing & label for each check_box Passed check_box_outline_blank Failed
unique model oven picture and layout :
(8) Attachments
https://eservice-app.bio-energy.com.my/admin/report/show/136 4/5
6/25/2021 eService | Report
https://eservice-app.bio-energy.com.my/admin/report/show/136 5/5