You are on page 1of 11

CONFIDENTIAL

Polarizer Installation
Update : 2 Apr 2010

Mano Vitee, 5.04.10, Penang


Table of Content

Page
3
1. Hardware Parts (Polarizer)
4
2. Machine Setup
5
3. Pre Bond Substrate Inspection (Lighting)
6
4. Pre buyoff Sample 1 (Result)
7
5. Pre buyoff Sample 2 (Result)
8
6. Problem Facing
9
7. Software Issue
10
8. Action taken

Project Updates 2
Hardware Parts (Polarizer)

Without Polarizer With Polarizer

Project Updates 3
Machine Setup

Machine Setup:
i. Pre bond Substrate Failure Handling
select “Stop”.
ii. Num of Insp.Win select “4”.
iii. Defect Threshold select “Very Tight”.
iv. Diff. Lighting select “Different”

Project Updates 4
Pre Bond Substrate Inspection (Lighting)

Inspection region 4
Coaxial light 40%
Ring light 40%
Exposure 8%

Project Updates 5
Pre buyoff Sample 1 (Result)

Project Updates 6
Pre buyoff Sample 2 (Result)

Project Updates 7
Problem Facing
Problem Facing
~ Some unit the extra glue can’t detect

Project Updates 8
Software Issue

Software Issue
V2.24.18E & V3.20.06 Wineagle
Defect Threshold – Very Tight can’t be trigger
It occupy by Pre bond Substrate Failure Handling

Project Updates 9
Action Taken

Action Taken:
 Log file sent to AAA Vision group (Hong Kong) for study
 Defect Threshold – “Very Tight” can be Trigger

Project Updates 10
Thank you for your attention.